Limelight Solar II LLC

2600 Cannons Campground Road, Spartanburg, SC 29307

Plant Summary Information

Limelight Solar II LLC is ranked #101 out of 111 solar farms in South Carolina in terms of total annual net electricity generation.

Limelight Solar II LLC generated 460.0 MWh during the 3-month period between September 2023 to December 2023.

Plant NameLimelight Solar II LLC
Utility NameLimelight Solar II LLC
LocationSpartanburg County, SC
Initial Operation DateDecember 2019
Last Update Dec 2023
Annual Generation 2.8 GWh
Annual Consumption 10.1 k MMBtu
Ranked #9,139 out of 11,852 Power Plants Nationwide
Ranked #3,977 out of 5,655 Solar Power Plants Nationwide
Ranked #163 out of 190 South Carolina Power Plants
Ranked #101 out of 111 South Carolina Solar Power Plants
Fuel Types Solar

Map of Limelight Solar II LLC

Full Screen Map

Register Now for Comprehensive Access

Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Limelight Solar II LLC.

Create Your Account Today

Monthly Net Generation for Limelight Solar II LLC

Limelight Solar II LLC Details

Summary Information
Plant NameLimelight Solar II LLC (63241)
Plant Address2600 Cannons Campground Road, Spartanburg, SC 29307
UtilityLimelight Solar II LLC (63016)
Latitude, Longitude34.99389, -81.87819
Generation Dates on FileDec 2019 to Dec 2023
Initial Operation DateDecember 2019
Annual Generation 2.8 GWh
Fuel Types Solar
 
Federal Energy Regulatory Commission (FERC) Information
FERC Cogeneration StatusNo
FERC Small Power Producer StatusYes
FERC Small Power Producer Docket NumberQF17-1045
FERC Exempt Wholesale Generator StatusNo
Regulatory Information
Regulatory StatusNon-Regulated
NERC RegionSERC
Balancing AuthorityDuke Energy Carolinas (DUK)
NAICS CodeUtilities (22)
Sector IPP Non-CHP (2)
Water Source
Ash Impoundment No
Transmission / Distribution OwnerDuke Energy Carolinas, LLC (5416) NC
Grid Voltage 23.90 kV
Energy StorageNo

Generator SCLL Details Operating December 2019

TechnologySolar Photovoltaic
Prime MoverPhotovoltaic
OwnershipSingle Owner
Nameplate Capacity2 MW
Summer Capacity2 MW
Winter Capacity2 MW
Uprate/Derate Completed No
StatusOperating
First Operation DateDecember 2019
Combined Heat & Power No
Sector NameIPP Non-CHP (2)
Energy SourceSolar
Solar Details
Fixed TiltYes
Azimuth Angle180
Tilt Angle25
DC Net Capacity2.6 MW
Crystalline SiliconYes
Net Metering AgreementNo
Virtual Net Metering AgreementNo

Limelight Solar II LLC Plant Owners

Owner NameAddressOwnership
We couldn't locate any owners for this plant

Power Plants with Similar Net Generation

Power plants with a similar annual net generation from Solar.

RankPlant NamePlant LocationAnnual Generation
#3967City of Rochester SolarRochester, NY2.8 GWh
#3968First Baptist Church of GlenardenUpper Marlboro, MD2.8 GWh
#3969Dynamic - WalpoleWalpole, MA2.8 GWh
#3970Wilson SolarSpencer, MA2.8 GWh
#3971Gardner Solar 1Gardner, MA2.8 GWh
#3972Galesburg Solar ArrayOquawka, IL2.8 GWh
#3973City of Paris SolarParis, AR2.8 GWh
#3974DG Tufts Knoll LLC CSGNorth Grafton, MA2.8 GWh
#3975Fairview Farms SolarWhately, MA2.8 GWh
#3976Goose Lake MN DPC-GMAlbert Lea, MN2.8 GWh
#3978Spruce - WCMD - Resh IHagerstown, MD2.8 GWh
#3979Lincoln Financial FieldPhiladelphia, PA2.8 GWh
#3980Farmington Solar FarmFarmington, MO2.8 GWh
#3981Technology Drive SolarBrattleboro, VT2.8 GWh
#3982IMPA Huntingburg Solar ParkHuntingburg, IN2.8 GWh
#3983HQC Rock River Solar Power Gen StationBeloit, WI2.8 GWh
#3984Victor Valley CC CPV SolarVictorville, CA2.8 GWh
#3985Kelly Bridge Road Community Solar FarmLiberty, NY2.8 GWh
#3986Elizabethtown SolarElizabethtown, PA2.8 GWh
#3987Hobart & William Smith College Gates Rd.Geneva, NY2.8 GWh

Nearby Power Plants

Below are closest 20 power plants surrounding Limelight Solar II LLC.

Plant NamePlant LocationAnnual GenerationDistance
AGA TAG Solar III LLCSpartanburg, SC3.3 GWh9.3 mi
Atood IICowpens, SC3.9 GWh4.7 mi
ATOOD Solar III LLCSpartanburg, SC3.3 GWh9.3 mi
Ballenger Road Solar AInman, SC4.3 GWh13.7 mi
Beetle SolarMooresboro, NC6.0 GWh17.5 mi
BMW Manufacturing CoGreer, SC31.7 GWh18.3 mi
Broad River Energy CenterGaffney, SC495.8 GWh18.1 mi
Broad River Solar, LLCMooresboro, NC82.8 GWh15.2 mi
Bryant Road SolarSpartanburg, SC2.3 GWh3.2 mi
Cherokee County CogenGaffney, SC276.3 GWh16 mi
Clifton Dam 3 Power StationConverse, SC3.6 GWh2.5 mi
Gaston ShoalsBlacksburg, SC19.3 GWh18.7 mi
James E. Rogers Energy ComplexCliffside, NC5.6 TWh17 mi
Limelight Solar I, LLCSpartanburg, SC3.6 GWh6.9 mi
Limelight Solar III, LLCSpartanburg, SC5.6 GWh6.3 mi
Mohea Solar Energy Center, LLCGaffney, SC8.6 GWh15.8 mi
Rutherford FarmForest City, NC135.1 GWh18.4 mi
Spartanburg Water SystemChesnee, SC2.2 GWh9.5 mi
Upper Pacolet HydroPacolet, SC3.7 GWh9 mi
Wellford Renewable Energy PlantSpartanburg, SC79.0 MWh14.3 mi