Lilliwaup Falls Generating
601 N. Lilliwaup St, Lilliwaup, WA 98555Plant Summary Information
Lilliwaup Falls Generating is ranked #65 out of 70 hydroelectric power plants in Washington in terms of total annual net electricity generation.
Lilliwaup Falls Generating is comprised of 7 generators and generated 1.7 GWh during the 3-month period between September 2023 to December 2023.
Plant Name | Lilliwaup Falls Generating |
---|---|
Utility Name | William G. Reed Jr |
Location | Mason County, WA |
Initial Operation Date | May 1986 |
Last Update | Dec 2023 |
Annual Generation | 6.0 GWh |
Annual Consumption | 22.0 k MMBtu |
Ranked #7,250 out of 11,835 Power Plants Nationwide | |
Ranked #1,107 out of 1,371 Water Power Plants Nationwide | |
Ranked #122 out of 134 Washington Power Plants | |
Ranked #65 out of 70 Washington Water Power Plants | |
Fuel Types | Water |
Map of Lilliwaup Falls Generating
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Lilliwaup Falls Generating.
Monthly Net Generation for Lilliwaup Falls Generating
Lilliwaup Falls Generating Details
Summary Information | |
---|---|
Plant Name | Lilliwaup Falls Generating (50700) |
Plant Address | 601 N. Lilliwaup St, Lilliwaup, WA 98555 |
Utility | William G. Reed Jr (15795) |
Latitude, Longitude | 47.4706, -123.1153 |
Generation Dates on File | Jan 2001 to Dec 2023 |
Initial Operation Date | May 1986 |
Annual Generation | 6.0 GWh |
Fuel Types | Water |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | Yes |
FERC Small Power Producer Docket Number | QF15-137-000 |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | WECC |
Balancing Authority | Bonneville Power Administration (BPAT) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | Lilliwaup Creek |
Ash Impoundment | No |
Transmission / Distribution Owner | PUD No 1 of Mason County (22355) WA |
Grid Voltage | 12.50 kV / 7.20 kV |
Energy Storage | No |
Generator 4735 Details Operating May 1986
Technology | Conventional Hydroelectric |
---|---|
Prime Mover | Hydroelectric Turbine |
Ownership | Single Owner |
Nameplate Capacity | 0.2 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 0.2 MW |
Winter Capacity | 0.2 MW |
Minimum Load | 0.2 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | May 1986 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Water |
Solid Fuel Gasification | No |
Time From Cold Shutdown To Full Load | 10M |
Generator 4736 Details Operating May 1986
Technology | Conventional Hydroelectric |
---|---|
Prime Mover | Hydroelectric Turbine |
Ownership | Single Owner |
Nameplate Capacity | 0.2 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 0.2 MW |
Winter Capacity | 0.2 MW |
Minimum Load | 0.2 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | May 1986 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Water |
Solid Fuel Gasification | No |
Time From Cold Shutdown To Full Load | 10M |
Generator 4737 Details Operating May 1986
Technology | Conventional Hydroelectric |
---|---|
Prime Mover | Hydroelectric Turbine |
Ownership | Single Owner |
Nameplate Capacity | 0.2 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 0.2 MW |
Winter Capacity | 0.2 MW |
Minimum Load | 0.2 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | May 1986 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Water |
Solid Fuel Gasification | No |
Time From Cold Shutdown To Full Load | 10M |
Generator 4738 Details Operating May 1986
Technology | Conventional Hydroelectric |
---|---|
Prime Mover | Hydroelectric Turbine |
Ownership | Single Owner |
Nameplate Capacity | 0.2 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 0.2 MW |
Winter Capacity | 0.2 MW |
Minimum Load | 0.2 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | May 1986 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Water |
Solid Fuel Gasification | No |
Time From Cold Shutdown To Full Load | 10M |
Generator 4739 Details Operating May 1986
Technology | Conventional Hydroelectric |
---|---|
Prime Mover | Hydroelectric Turbine |
Ownership | Single Owner |
Nameplate Capacity | 0.2 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 0.2 MW |
Winter Capacity | 0.2 MW |
Minimum Load | 0.2 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | May 1986 |
---|---|
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Water |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Other Planned Modifications | No |
Multiple Fuels | No |
Generator 4740 Details Operating May 1986
Technology | Conventional Hydroelectric |
---|---|
Prime Mover | Hydroelectric Turbine |
Ownership | Single Owner |
Nameplate Capacity | 0.2 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 0.2 MW |
Winter Capacity | 0.2 MW |
Minimum Load | 0.2 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | May 1986 |
---|---|
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Water |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Other Planned Modifications | No |
Multiple Fuels | No |
Generator 4741 Details Operating May 1986
Technology | Conventional Hydroelectric |
---|---|
Prime Mover | Hydroelectric Turbine |
Ownership | Single Owner |
Nameplate Capacity | 0.2 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 0.2 MW |
Winter Capacity | 0.2 MW |
Minimum Load | 0.2 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | May 1986 |
---|---|
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Water |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Other Planned Modifications | No |
Multiple Fuels | No |
Lilliwaup Falls Generating Plant Owners
Owner Name | Address | Generator | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Water.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#1097 | International Paper Woronoco Mill | Woronoco, MA | 6.2 GWh |
#1098 | Saluda Dam | Greenville, SC | 6.2 GWh |
#1099 | Burney Creek | Burney, CA | 6.2 GWh |
#1100 | Mother Ann Lee | Harrodsburg, KY | 6.2 GWh |
#1101 | Fontana | Rialto, CA | 6.2 GWh |
#1102 | Texon Hydroelectric Project | Russell, MA | 6.1 GWh |
#1103 | Mottville | White Pigeon, MI | 6.1 GWh |
#1104 | Radford | Radford, VA | 6.1 GWh |
#1105 | Cabot Holyoke | Holyoke, MA | 6.1 GWh |
#1106 | Way Dam | Crystal Falls, MI | 6.0 GWh |
#1108 | East Barnet | Barnet, VT | 6.0 GWh |
#1109 | Fulton Hydro | Fulton, NY | 6.0 GWh |
#1110 | Hat Rapids | Rhinelander, WI | 5.9 GWh |
#1111 | Indian Valley Dam Hydro Project | Clearlake Oaks, CA | 5.9 GWh |
#1112 | International Paper Riley Hydro | Jay, ME | 5.9 GWh |
#1113 | Cow Creek | Millville, CA | 5.9 GWh |
#1114 | Stillwater Reservoir Hydro | Webb, NY | 5.8 GWh |
#1115 | Dunn Paper | Gouverneur, NY | 5.8 GWh |
#1116 | Rock Creek II | Twin Falls, ID | 5.8 GWh |
#1117 | Rockton | Rockton, IL | 5.8 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Lilliwaup Falls Generating.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Cedar Hills | Maple Valley, WA | 454.0 MWh | 50.1 mi |
Cosmo Specialty Fibers Plant | Cosmopolis, WA | 99.6 GWh | 46.8 mi |
Cushman 1 | Shelton, WA | 115.5 GWh | 6.3 mi |
Cushman 2 | Shelton, WA | 168.5 GWh | 7.3 mi |
Frederickson | Tacoma, WA | 159.6 GWh | 44.3 mi |
Frederickson Power LP | Tacoma, WA | 1.8 TWh | 44.1 mi |
Grays Harbor Energy Facility | Elma, WA | 3.2 TWh | 38.6 mi |
LRI LFGTE Facility | Graham, WA | 33.6 GWh | 51.6 mi |
McKinley Paper Co. - Washington Mill | Port Angeles, WA | 36.2 GWh | 48.7 mi |
Port Townsend Paper | Port Townsend, WA | 35.3 GWh | 45.5 mi |
Rocky Brook Hydroelectric | Brinnon, WA | 219.0 MWh | 19 mi |
Sierra Pacific Aberdeen | Aberdeen, WA | 105.2 GWh | 46.2 mi |
Skookumchuck | Tenino, WA | 3.2 GWh | 50.9 mi |
Skookumchuck Wind Facility | Rainier, WA | 419.7 GWh | 47.8 mi |
Transalta Centralia Generation | Centralia, WA | 3.0 TWh | 50.8 mi |
University of Washington Power Plant | Seattle, WA | 6.0 GWh | 39.9 mi |
West Point Treatment Plant | Seattle, WA | 7.2 GWh | 33.8 mi |
WestRock (WA) | Tacoma, WA | 196.3 GWh | 35.1 mi |
Wynoochee | Montesano, WA | 26.4 GWh | 23.7 mi |
Yelm | Yelm, WA | 26.2 GWh | 41 mi |