Liberty I & II LFGTE is ranked #3 out of 10 landfill gas power plants in Indiana in terms of total annual net electricity generation.

Liberty I & II LFGTE is comprised of 12 generators and generated 6.2 GWh during the 3-month period between September 2023 to December 2023.

Plant NameLiberty I & II LFGTE
Utility NameWabash Valley Power Assn, Inc
LocationWhite County, IN
Initial Operation DateAugust 2005
Last Update Dec 2023
Annual Generation 26.7 GWh
Annual Consumption 394.2 k MMBtu
Ranked #4,683 out of 11,835 Power Plants Nationwide
Ranked #105 out of 299 Landfill Gas Power Plants Nationwide
Ranked #76 out of 198 Indiana Power Plants
Ranked #3 out of 10 Indiana Landfill Gas Power Plants
Fuel Types Landfill Gas

Map of Liberty I & II LFGTE

Full Screen Map

Register Now for Comprehensive Access

Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Liberty I & II LFGTE.

Create Your Account Today

Monthly Net Generation for Liberty I & II LFGTE

Liberty I & II LFGTE Details

Summary Information
Plant NameLiberty I & II LFGTE (56465)
Plant Address8635 State Road 16 East, Monticello, IN 47960
UtilityWabash Valley Power Assn, Inc (40211)
Latitude, Longitude40.88556, -86.70444
Generation Dates on FileJan 2006 to Dec 2023
Initial Operation DateAugust 2005
Annual Generation 26.7 GWh
Fuel Types Landfill Gas
 
Federal Energy Regulatory Commission (FERC) Information
FERC Cogeneration StatusNo
FERC Small Power Producer StatusNo
FERC Exempt Wholesale Generator StatusNo
Regulatory Information
Regulatory StatusRegulated
NERC RegionRFC
Balancing AuthorityMidcontinent Independent Transmission System Operator, Inc.. (MISO)
NAICS CodeUtilities (22)
Sector Electric Utility (1)
Water Source
Ash Impoundment No
Transmission / Distribution OwnerCarroll-White REMC (27599) IN
Grid Voltage 12.47 kV
Energy StorageNo
 
Natural Gas Information
Pipeline Name NORTHERN INDIANA PUBLIC SERVICE CO
Pipeline NotesPipeline to be connected in 2025.

Generator 1 Details Operating August 2005

TechnologyNatural Gas Internal Combustion Engine
Prime MoverInternal Combustion Engine
OwnershipSingle Owner
Nameplate Capacity0.8 MW
Nameplate Power Factor0.8
Summer Capacity0.8 MW
Winter Capacity0.8 MW
Minimum Load0.4 MW
Uprate/Derate Completed No
StatusOperating
First Operation DateAugust 2005
Combined Heat & Power No
Sector NameElectric Utility (1)
Energy SourceNatural Gas
Solid Fuel Gasification No
Carbon Capture TechnologyNo
Time From Cold Shutdown To Full Load10M
Multiple FuelsNo
Switch Between Oil And Natural GasNo

Generator 2 Details Operating August 2005

TechnologyNatural Gas Internal Combustion Engine
Prime MoverInternal Combustion Engine
OwnershipSingle Owner
Nameplate Capacity0.8 MW
Nameplate Power Factor0.8
Summer Capacity0.8 MW
Winter Capacity0.8 MW
Minimum Load0.4 MW
Uprate/Derate Completed No
StatusOperating
First Operation DateAugust 2005
Combined Heat & Power No
Sector NameElectric Utility (1)
Energy SourceNatural Gas
Solid Fuel Gasification No
Carbon Capture TechnologyNo
Time From Cold Shutdown To Full Load10M
Multiple FuelsNo

Generator 3 Details Operating August 2005

TechnologyNatural Gas Internal Combustion Engine
Prime MoverInternal Combustion Engine
OwnershipSingle Owner
Nameplate Capacity0.8 MW
Nameplate Power Factor0.8
Summer Capacity0.8 MW
Winter Capacity0.8 MW
Minimum Load0.4 MW
Uprate/Derate Completed No
StatusOperating
First Operation DateAugust 2005
Combined Heat & Power No
Sector NameElectric Utility (1)
Energy SourceNatural Gas
Solid Fuel Gasification No
Carbon Capture TechnologyNo
Time From Cold Shutdown To Full Load10M
Multiple FuelsNo

Generator 4 Details Operating August 2005

TechnologyNatural Gas Internal Combustion Engine
Prime MoverInternal Combustion Engine
OwnershipSingle Owner
Nameplate Capacity0.8 MW
Nameplate Power Factor0.8
Summer Capacity0.8 MW
Winter Capacity0.8 MW
Minimum Load0.4 MW
Uprate/Derate Completed No
StatusOperating
First Operation DateAugust 2005
Combined Heat & Power No
Sector NameElectric Utility (1)
Energy SourceNatural Gas
Solid Fuel Gasification No
Carbon Capture TechnologyNo
Time From Cold Shutdown To Full Load10M
Multiple FuelsNo

Generator 1-II Details Operating January 2010

TechnologyNatural Gas Internal Combustion Engine
Prime MoverInternal Combustion Engine
OwnershipSingle Owner
Nameplate Capacity0.8 MW
Nameplate Power Factor0.8
Summer Capacity0.8 MW
Winter Capacity0.8 MW
Minimum Load0.4 MW
Uprate/Derate Completed No
StatusOperating
First Operation DateJanuary 2010
Combined Heat & Power No
Sector NameElectric Utility (1)
Energy SourceNatural Gas
Solid Fuel Gasification No
Carbon Capture TechnologyNo
Time From Cold Shutdown To Full Load10M
Multiple FuelsNo
Switch Between Oil And Natural GasNo

Generator 2-II Details Operating January 2010

TechnologyNatural Gas Internal Combustion Engine
Prime MoverInternal Combustion Engine
OwnershipSingle Owner
Nameplate Capacity0.8 MW
Nameplate Power Factor0.8
Summer Capacity0.8 MW
Winter Capacity0.8 MW
Minimum Load0.4 MW
Uprate/Derate Completed No
StatusOperating
First Operation DateJanuary 2010
Combined Heat & Power No
Sector NameElectric Utility (1)
Energy SourceNatural Gas
Solid Fuel Gasification No
Carbon Capture TechnologyNo
Time From Cold Shutdown To Full Load10M
Multiple FuelsNo

Generator 3-II Details Operating January 2010

TechnologyNatural Gas Internal Combustion Engine
Prime MoverInternal Combustion Engine
OwnershipSingle Owner
Nameplate Capacity0.8 MW
Nameplate Power Factor0.8
Summer Capacity0.8 MW
Winter Capacity0.8 MW
Minimum Load0.4 MW
Uprate/Derate Completed No
StatusOperating
First Operation DateJanuary 2010
Combined Heat & Power No
Sector NameElectric Utility (1)
Energy SourceNatural Gas
Solid Fuel Gasification No
Carbon Capture TechnologyNo
Time From Cold Shutdown To Full Load10M
Multiple FuelsNo

Generator 4-II Details Operating January 2010

TechnologyNatural Gas Internal Combustion Engine
Prime MoverInternal Combustion Engine
OwnershipSingle Owner
Nameplate Capacity0.8 MW
Nameplate Power Factor0.8
Summer Capacity0.8 MW
Winter Capacity0.8 MW
Minimum Load0.4 MW
Uprate/Derate Completed No
StatusOperating
First Operation DateJanuary 2010
Combined Heat & Power No
Sector NameElectric Utility (1)
Energy SourceNatural Gas
Solid Fuel Gasification No
Carbon Capture TechnologyNo
Time From Cold Shutdown To Full Load10M
Multiple FuelsNo

Generator 1-III Details Operating January 2017

TechnologyLandfill Gas
Prime MoverInternal Combustion Engine
OwnershipSingle Owner
Nameplate Capacity1.6 MW
Nameplate Power Factor0.8
Summer Capacity1.6 MW
Winter Capacity1.6 MW
Minimum Load0.8 MW
Uprate/Derate Completed No
StatusOperating
First Operation DateJanuary 2017
Combined Heat & Power No
Sector NameElectric Utility (1)
Energy SourceLandfill Gas
Solid Fuel Gasification No
Carbon Capture TechnologyNo
Time From Cold Shutdown To Full Load10M
Multiple FuelsNo
Switch Between Oil And Natural GasNo

Generator 2-III Details Operating January 2017

TechnologyLandfill Gas
Prime MoverInternal Combustion Engine
OwnershipSingle Owner
Nameplate Capacity1.6 MW
Nameplate Power Factor0.8
Summer Capacity1.6 MW
Winter Capacity1.6 MW
Minimum Load0.8 MW
Uprate/Derate Completed No
StatusOperating
First Operation DateJanuary 2017
Combined Heat & Power No
Sector NameElectric Utility (1)
Energy SourceLandfill Gas
Solid Fuel Gasification No
Time From Cold Shutdown To Full Load10M
Multiple FuelsNo

Generator 3-III Details Operating January 2017

TechnologyLandfill Gas
Prime MoverInternal Combustion Engine
OwnershipSingle Owner
Nameplate Capacity1.6 MW
Nameplate Power Factor0.8
Summer Capacity1.6 MW
Winter Capacity1.6 MW
Minimum Load0.8 MW
Uprate/Derate Completed No
StatusOperating
First Operation DateJanuary 2017
Combined Heat & Power No
Sector NameElectric Utility (1)
Energy SourceLandfill Gas
Solid Fuel Gasification No
Carbon Capture TechnologyNo
Time From Cold Shutdown To Full Load10M
Multiple FuelsNo

Generator 4-III Details Operating January 2017

TechnologyLandfill Gas
Prime MoverInternal Combustion Engine
OwnershipSingle Owner
Nameplate Capacity1.6 MW
Nameplate Power Factor0.8
Summer Capacity1.6 MW
Winter Capacity1.6 MW
Minimum Load0.8 MW
Uprate/Derate Completed No
StatusOperating
First Operation DateJanuary 2017
Combined Heat & Power No
Sector NameElectric Utility (1)
Energy SourceLandfill Gas
Solid Fuel Gasification No
Carbon Capture TechnologyNo
Time From Cold Shutdown To Full Load10M
Multiple FuelsNo

Liberty I & II LFGTE Plant Owners

Owner NameAddressGeneratorOwnership
We couldn't locate any owners for this plant

Power Plants with Similar Net Generation

Power plants with a similar annual net generation from Landfill Gas.

RankPlant NamePlant LocationAnnual Generation
#95Ameresco Keller CanyonBay Point, CA28.7 GWh
#96Model City Energy FacilityYoungstown, NY28.6 GWh
#97Riverview Energy SystemsRiverview, MI28.3 GWh
#98Bavarian LFGTEWalton, KY27.9 GWh
#99Sarasota County LFGTE FacilityNokomis, FL27.8 GWh
#100Ameresco Dallas LLCDallas, TX27.8 GWh
#101Riverbend LandfillMcMinnville, OR27.7 GWh
#102Richmond EnergyHenrico, VA27.3 GWh
#103Lennon GeneratingLennon, MI27.3 GWh
#104Brown County LFGTE Power StationGeorgetown, OH27.0 GWh
#106Two Pine Landfill Gas RecoveryNorth Little Rock, AR26.5 GWh
#107MM Lopez EnergyLake View Terrace, CA26.4 GWh
#108New BernNew Bern, NC28.1 GWh
#109Oneida HerkimerBoonville, NY26.3 GWh
#110Stanton Energy CenterOrlando, FL4.1 TWh
#111Nanticoke LFGBinghamton, NY26.1 GWh
#112Greene Valley Gas RecoveryNaperville, IL26.1 GWh
#113Apple Campus 2 Fuel CellCupertino, CA25.9 GWh
#114Salem Energy Systems LLCWinston-Salem, NC25.9 GWh
#115Mountain ViewGreencastle, PA27.0 GWh

Nearby Power Plants

Below are closest 20 power plants surrounding Liberty I & II LFGTE.

Plant NamePlant LocationAnnual GenerationDistance
BioTown AgReynolds, IN30.2 GWh12.4 mi
Cavalry Solar HybridMonon, IN174.7 GWh5.6 mi
Dunn's Bridge 1 SolarWheatfield, IN505.0 GWh25.3 mi
Hidden View Dairy, LLCRensselaer, IN5.8 GWh21.7 mi
IMPA Rensselaer Solar ParkRensselaer, IN1.2 GWh22.9 mi
Indiana Crossroads Solar ParkReynolds, IN365.5 GWh13.4 mi
Indiana Crossroads Wind Farm LLCChalmers, IN878.6 GWh17.6 mi
Logansport SolarLogansport, IN24.4 GWh18.7 mi
Meadow Lake Wind Farm II LLCLafayette, IN205.1 GWh23.7 mi
Meadow Lake Wind Farm III LLCLafayette, IN234.3 GWh25.8 mi
Meadow Lake Wind Farm IVLafayette, IN172.8 GWh22.4 mi
Meadow Lake Wind Farm LLCLafayette, IN399.0 GWh21.5 mi
Meadow Lake Wind Farm V LLCChalmers, IN335.0 GWh20.3 mi
Meadow Lake Wind Farm VI LLCRemington, IN650.6 GWh25.8 mi
Norway (IN)Monticello, IN14.2 GWh7.8 mi
Oak Ridge LFGTELogansport, IN21.7 GWh22.1 mi
OakdaleMonticello, IN20.0 GWh16 mi
R M SchahferWheatfield, IN1.7 TWh28.3 mi
Rensselaer Solar Site 2Rensselaer, IN7.4 GWh23.6 mi
Rosewater Wind FarmChalmers, IN293.6 GWh11.9 mi