Lewis Smith Dam
640 Powerhouse Road, Jasper, AL 35501Plant Summary Information
Lewis Smith Dam is ranked #45 out of 75 power plants in Alabama in terms of total annual net electricity generation.
Lewis Smith Dam is comprised of 2 generators and generated 10.4 GWh during the 3-month period between September 2023 to December 2023.
Plant Name | Lewis Smith Dam |
---|---|
Utility Name | Alabama Power Co |
Location | Walker County, AL |
Initial Operation Date | September 1961 |
Last Update | Dec 2023 |
Annual Generation | 233.4 GWh |
Annual Consumption | 884.5 k MMBtu |
Ranked #2,128 out of 11,836 Power Plants Nationwide | |
Ranked #194 out of 1,371 Water Power Plants Nationwide | |
Ranked #45 out of 75 Alabama Power Plants | |
Ranked #13 out of 23 Alabama Water Power Plants | |
Fuel Types | Water |
Map of Lewis Smith Dam
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Lewis Smith Dam.
Monthly Net Generation for Lewis Smith Dam
Lewis Smith Dam Details
Summary Information | |
---|---|
Plant Name | Lewis Smith Dam (18) |
Plant Address | 640 Powerhouse Road, Jasper, AL 35501 |
Utility | Alabama Power Co (195) |
Latitude, Longitude | 33.9406, -87.1077 |
Generation Dates on File | Jan 2001 to Dec 2023 |
Initial Operation Date | September 1961 |
Annual Generation | 233.4 GWh |
Fuel Types | Water |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Regulated |
NERC Region | SERC |
Balancing Authority | Southern Company Services, Inc. - Trans (SOCO) |
NAICS Code | Utilities (22) |
Sector | Electric Utility (1) |
Water Source | Sipsey Fork Black Warrior Rive |
Ash Impoundment | No |
Transmission / Distribution Owner | Alabama Power Co (195) AL |
Grid Voltage | 161.00 kV |
Energy Storage | No |
Generator 1 Details Operating September 1961
Technology | Conventional Hydroelectric |
---|---|
Prime Mover | Hydroelectric Turbine |
Ownership | Single Owner |
Nameplate Capacity | 90.5 MW |
Nameplate Power Factor | 0.9 |
Summer Capacity | 89 MW |
Winter Capacity | 87.5 MW |
Minimum Load | 83 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | September 1961 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Water |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Generator 2 Details Operating July 1962
Technology | Conventional Hydroelectric |
---|---|
Prime Mover | Hydroelectric Turbine |
Ownership | Single Owner |
Nameplate Capacity | 90.5 MW |
Nameplate Power Factor | 0.9 |
Summer Capacity | 89 MW |
Winter Capacity | 87.5 MW |
Minimum Load | 83 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | July 1962 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Water |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Lewis Smith Dam Plant Owners
Owner Name | Address | Generator | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Water.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#184 | Thomson | Carlton, MN | 258.7 GWh |
#185 | Ozark | Ozark, AR | 253.1 GWh |
#186 | Spier Falls | Gansevoort, NY | 252.9 GWh |
#187 | Exchequer | Snelling, CA | 250.6 GWh |
#188 | Jefferies | Moncks Corner, SC | 247.6 GWh |
#189 | Tiger Creek | Pioneer, CA | 246.0 GWh |
#190 | Cochrane | Great Falls, MT | 244.7 GWh |
#191 | Hudson Falls Hydroelectric Project | South Glens Falls, NY | 242.3 GWh |
#192 | Blakely Mountain | Royal, AR | 234.9 GWh |
#193 | Edison Sault | Sault Ste. Marie, MI | 233.6 GWh |
#195 | Hiwassee Dam | Murphy, NC | 232.7 GWh |
#196 | Woodleaf | Forbestown, CA | 231.6 GWh |
#197 | Toledo Bend | Burkville, TX | 231.5 GWh |
#198 | Harry Truman | Warsaw, MO | 230.4 GWh |
#199 | Pensacola | Langley, OK | 228.0 GWh |
#200 | J Woodruff | Chattahoochee, FL | 224.2 GWh |
#201 | Thurlow Dam | Tallassee, AL | 222.2 GWh |
#202 | Lost Creek | Trail, OR | 221.3 GWh |
#203 | Willow Island Hydroelectric Plant | Willow Island, WV | 220.4 GWh |
#204 | San Francisquito 1 | Saugus, CA | 220.2 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Lewis Smith Dam.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
ABC Coke | Tarrant, AL | 83.0 MWh | 31.1 mi |
ANAD Solar Array | Anniston Army Depot, AL | 10.7 GWh | 68.9 mi |
Bankhead Dam | Northport, AL | 138.7 GWh | 36.2 mi |
Browns Ferry | Decatur, AL | 30.5 TWh | 52.8 mi |
Calhoun Energy Center | Eastaboga, AL | 270.0 GWh | 69.6 mi |
Colbert | Tuscumbia, AL | 78.7 GWh | 69.8 mi |
Decatur Energy Center | Decatur, AL | 3.0 TWh | 47.8 mi |
Decatur-Morgan Co LFG Recovery Project | Trinity, AL | 10.7 GWh | 47.2 mi |
E C Gaston | Wilsonville, AL | 3.9 TWh | 60.9 mi |
Guntersville | Guntersville, AL | 453.4 GWh | 52.6 mi |
H Neely Henry Dam | Ohatchee, AL | 196.7 GWh | 61.5 mi |
Holt Dam | Tuscaloosa, AL | 154.5 GWh | 51.3 mi |
James H Miller Jr | Quinton, AL | 17.1 TWh | 21.5 mi |
Logan Martin Dam | Vincent, AL | 343.5 GWh | 56.8 mi |
Morgan Energy Center | Decatur, AL | 4.5 TWh | 48.4 mi |
Redstone Arsenal Hybrid | Huntsville, AL | 15.5 GWh | 54.3 mi |
TAI Huntsville Solar Hybrid | Huntsville, AL | 13.3 GWh | 67.2 mi |
U S Alliance Coosa Pines | Coosa Pines, AL | 139.3 GWh | 60.5 mi |
Wheeler Dam | Town Creek, AL | 1.1 TWh | 61.9 mi |
Wilson Dam | Muscle Shoals, AL | 2.2 TWh | 66.2 mi |