Legoland Solar is ranked #157 out of 171 solar farms in Florida in terms of total annual net electricity generation.
Legoland Solar generated 472.0 MWh during the 3-month period between September 2023 to December 2023.
Plant Name | Legoland Solar |
---|---|
Utility Name | Tampa Electric Co |
Location | Polk County, FL |
Initial Operation Date | December 2016 |
Last Update | Dec 2023 |
Annual Generation | 2.5 GWh |
Annual Consumption | 9.1 k MMBtu |
Ranked #9,401 out of 11,852 Power Plants Nationwide | |
Ranked #4,192 out of 5,655 Solar Power Plants Nationwide | |
Ranked #260 out of 279 Florida Power Plants | |
Ranked #157 out of 171 Florida Solar Power Plants | |
Fuel Types | Solar |
Map of Legoland Solar
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Legoland Solar.
Monthly Net Generation for Legoland Solar
Legoland Solar Details
Summary Information | |
---|---|
Plant Name | Legoland Solar (60371) |
Plant Address | 1 Legoland Way, Winter Haven, FL 33884 |
Utility | Tampa Electric Co (18454) |
Latitude, Longitude | 27.98616, -81.69017 |
Generation Dates on File | Dec 2016 to Dec 2023 |
Initial Operation Date | December 2016 |
Annual Generation | 2.5 GWh |
Fuel Types | Solar |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Regulated |
NERC Region | SERC |
Balancing Authority | Tampa Electric Company (TEC) |
NAICS Code | Utilities (22) |
Sector | Electric Utility (1) |
Water Source | |
Ash Impoundment | |
Transmission / Distribution Owner | Tampa Electric Co (18454) FL |
Grid Voltage | 13.80 kV |
Energy Storage | No |
Generator 1 Details Operating December 2016
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Single Owner |
Nameplate Capacity | 1.4 MW |
Summer Capacity | 1.4 MW |
Winter Capacity | 1.4 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | December 2016 |
---|---|
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Solar |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Multiple Fuels | No |
Solar Details | |
Fixed Tilt | Yes |
---|---|
Azimuth Angle | 90 |
Tilt Angle | 10 |
DC Net Capacity | 1.8 MW |
Crystalline Silicon | Yes |
Net Metering Agreement | No |
Virtual Net Metering Agreement | No |
Legoland Solar Plant Owners
Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#4182 | Fresno Sunnyside High School Hybrid | Fresno, CA | 2.5 GWh |
#4183 | Open View Solar Farm | New Haven, VT | 2.5 GWh |
#4184 | Bell Bay Solar Farm | Conway, SC | 2.5 GWh |
#4185 | Heliocentric | Palmdale, CA | 2.5 GWh |
#4186 | Spring Hill Road | Barre, MA | 2.5 GWh |
#4187 | RV CSU Power LLC | Fort Collins, CO | 2.5 GWh |
#4188 | Lebanon Solar | Glen Gardner, NJ | 2.5 GWh |
#4189 | Lineage Logistics Solar | University Park, IL | 2.5 GWh |
#4190 | Warren County Solar | Belvidere, NJ | 2.5 GWh |
#4191 | Bethlehem Solar | New Scotland, NY | 2.5 GWh |
#4193 | Weber State University - Davis Campus PV | Layton, UT | 2.5 GWh |
#4194 | GD Glocester White Oak I, LLC | Glocester, RI | 2.5 GWh |
#4195 | Enerparc CA1 LLC | Hollister, CA | 2.5 GWh |
#4196 | Westminster Renewables, LLC CSG | Westminster, MA | 2.5 GWh |
#4197 | Woodoak Drive Community Solar Farm CSG | Tusten, NY | 2.5 GWh |
#4198 | Santa Rita Jail Hybrid | Dublin, CA | 13.1 GWh |
#4199 | IKEA Tejon 345 | Lebec, CA | 2.5 GWh |
#4200 | Bryan Solar Field | Bryan, OH | 2.5 GWh |
#4201 | Emmitsburg Solar Arrays | Emmitsburg, MD | 2.5 GWh |
#4202 | Amazon Maryland DCA1 | Sparrows Point, MD | 2.5 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Legoland Solar.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Bartow Solar Energy LLC | Bartow, FL | 12.7 GWh | 8.9 mi |
Bonnie Mine Solar | Bartow, FL | 56.6 GWh | 19.3 mi |
C D McIntosh Jr | Lakeland, FL | 2.5 TWh | 15.6 mi |
Cutrale Citrus Juices USA II | Auburndale, FL | 33.4 GWh | 8.1 mi |
Florida's Natural Growers | Lake Wales, FL | 40.8 GWh | 7.5 mi |
Goldfinch | Lakeland, FL | 2.2 GWh | 21.5 mi |
Hines Energy Complex | Bartow, FL | 11.6 TWh | 17.5 mi |
Intercession City | Intercession City, FL | 303.7 GWh | 21 mi |
Jamison Solar (FL) | Mulberry, FL | 140.9 GWh | 20.4 mi |
Lake Mabel Solar | Lake Wales, FL | 112.3 GWh | 4.9 mi |
Lakeland Electric Co. (FL)-Airport 1 | Lakeland, FL | 2.0 GWh | 21.8 mi |
Larsen Memorial | Lakeland, FL | 237.6 GWh | 14.9 mi |
LKL BLBD, LLC | Lakeland, FL | 8.1 GWh | 20.7 mi |
Mosaic Co Bartow Facility | Bartow, FL | 126.4 GWh | 14.9 mi |
Mosaic South Pierce Operations | Mulberry, FL | 140.2 GWh | 21.5 mi |
Mulberry Cogeneration Facility | Bartow, FL | 399.7 GWh | 14.9 mi |
Orange Cogeneration Facility | Bartow, FL | 391.0 GWh | 11.5 mi |
Osprey Energy Center Power Plant | Auburndale, FL | 2.6 TWh | 8.5 mi |
Peace Creek Solar | Bartow, FL | 92.1 GWh | 8.9 mi |
Tiger Bay | Ft. Meade, FL | 1.1 TWh | 19.2 mi |