Lee Site 31 Solar
Water Street, Lee, MA 1238Plant Summary Information
Lee Site 31 Solar is ranked #328 out of 463 solar farms in Massachusetts in terms of total annual net electricity generation.
Lee Site 31 Solar generated 627.9 MWh during the 3-month period between September 2022 to December 2022.
Plant Name | Lee Site 31 Solar |
---|---|
Utility Name | NSTAR Electric Company |
Location | Berkshire County, MA |
Initial Operation Date | August 2018 |
Last Update | Dec 2022 |
Annual Generation | 2.6 GWh |
Annual Consumption | 9.3 k MMBtu |
Ranked #9,064 out of 11,249 Power Plants Nationwide | |
Ranked #3,919 out of 5,158 Solar Power Plants Nationwide | |
Ranked #419 out of 573 Massachusetts Power Plants | |
Ranked #328 out of 463 Massachusetts Solar Power Plants | |
Fuel Types | Solar |
Map of Lee Site 31 Solar
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Lee Site 31 Solar.
Monthly Net Generation for Lee Site 31 Solar
Lee Site 31 Solar Details
Summary Information | |
---|---|
Plant Name | Lee Site 31 Solar (62265) |
Plant Address | Water Street Lee, MA 1238 |
Utility | NSTAR Electric Company (54913) |
Latitude, Longitude | 42.29687, -73.2275 |
Generation Dates on File | Aug 2018 to Dec 2022 |
Initial Operation Date | August 2018 |
Annual Generation | 2.6 GWh |
Fuel Types | Solar |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Regulated |
NERC Region | NPCC |
Balancing Authority | ISO New England Inc. (ISNE) |
NAICS Code | Utilities (22) |
Sector | Electric Utility (1) |
Water Source | |
Ash Impoundment | |
Transmission / Distribution Owner | NSTAR Electric Company (54913) MA |
Grid Voltage | 23.00 kV |
Energy Storage | No |
Generator LG370 Details Operating August 2018
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Single Owner |
Nameplate Capacity | 1.9 MW |
Summer Capacity | 1.9 MW |
Winter Capacity | 1.9 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | August 2018 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Solar |
Solar Details | |
Fixed Tilt | Yes |
---|---|
Azimuth Angle | 180 |
Tilt Angle | 20 |
DC Net Capacity | 2.3 MW |
Crystalline Silicon | Yes |
Net Metering Agreement | No |
Virtual Net Metering Agreement | No |
Lee Site 31 Solar Plant Owners
Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#3909 | 71 Charlotte Furnace Rd Hybrid(CSG) | Wareham, MA | 2.6 GWh |
#3910 | Oneida - West | Whitestown, NY | 2.6 GWh |
#3911 | Christmas Tree Shops DC Burlington NJ | Florence Township, NJ | 2.6 GWh |
#3912 | Beverly | Beverly, MA | 2.6 GWh |
#3913 | Syncarpha Eagle Nest | Eagle Nest, NM | 2.6 GWh |
#3914 | OER Checkerspot | Tracy's Landing, MD | 2.6 GWh |
#3915 | Diamond Valley Solar Project | Winchester, CA | 2.6 GWh |
#3916 | IKEA Tejon 345 | Lebec, CA | 2.6 GWh |
#3917 | Frey Rd #2 Community Solar Farm | Macedon, NY | 2.6 GWh |
#3918 | Solar BESS Hybrid | Marietta, GA | 2.5 GWh |
#3920 | Ridgecrest | Washington, DC | 2.6 GWh |
#3921 | West Boylston Community Shared Solar | West Boylston, MA | 2.6 GWh |
#3922 | BJ's Wholesale Club Inc Dist Center | Burlington, NJ | 2.6 GWh |
#3923 | Easton Landfill | Easton, MA | 2.6 GWh |
#3924 | Orange County Solar Farm (NY) | Goshen, NY | 2.6 GWh |
#3925 | Cedar Creek | Egg Harbor City, NJ | 2.6 GWh |
#3926 | 301 Chestnut Solar NG | East Longmeadow, MA | 2.6 GWh |
#3927 | Nunn | Apple Valley, CA | 2.6 GWh |
#3928 | Cheney Solar | Cheney, KS | 2.6 GWh |
#3929 | Summer Solar C2 | Lancaster, CA | 2.6 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Lee Site 31 Solar.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Berkshire 1 | Sheffield, MA | 2.6 GWh | 15.5 mi |
Chester Solar Farm | Chester, MA | 7.5 GWh | 14.3 mi |
East Acres Solar NG, LLC | Pittsfield, MA | 5.7 GWh | 13.2 mi |
Hinsdale Solar PV | Hinsdale, MA | 3.2 GWh | 11.6 mi |
Kearsarge GB | Great Barrington, MA | 3.5 GWh | 11.7 mi |
Nolan | Great Barrington, MA | 1.0 MWh | 8 mi |
Pittsfield 44 - M&W PV | Pittsfield, MA | 1.7 GWh | 13.2 mi |
Pittsfield Generating LP | Pittsfield, MA | 22.2 GWh | 11 mi |
Rail Trail | Great Barrington, MA | 3.3 GWh | 7.9 mi |
Rising Paper | Great Barrington, MA | 4.0 GWh | 7.6 mi |
Silver Lake Solar Photovoltaic Facility | Pittsfield, MA | 2.1 GWh | 10.8 mi |
Sunpin Blandford | Southwick, MA | 7.8 GWh | 13.4 mi |
Syncarpha Blandford Hybrid CSG | Blandford, MA | 8.8 GWh | 15.9 mi |
Syncarpha Hancock I CSG | Hancock, MA | 3.3 GWh | 10.9 mi |
Syncarpha Hancock II CSG | Hancock, MA | 3.5 GWh | 10.9 mi |
Syncarpha Hancock III CSG | Pittsfield, MA | 1.8 GWh | 10.5 mi |
Tanglewood Circle Solar 1 LLC | Becket, MA | 8.1 GWh | 6.8 mi |
Town of Otis Wind Energy Project | Otis, MA | 3.6 GWh | 11.4 mi |
Truck Stop | West Stockridge, MA | 3.1 GWh | 9.2 mi |
Waste Water Treatment Plant | Pittsfield, MA | 817.3 MWh | 7.8 mi |