Lee County Solid Waste Energy
10500 Buckingham Road, Fort Myers, FL 33905Plant Summary Information
Lee County Solid Waste Energy is ranked #23 out of 59 non-biogenic municipal solid waste power plants nationwide in terms of total annual net electricity generation.
Lee County Solid Waste Energy is comprised of 2 generators and generated 60.4 GWh during the 3-month period between June 2024 to September 2024.
Plant Name | Lee County Solid Waste Energy |
---|---|
Utility Name | Lee County Board-Commissioners |
Location | Lee County, FL |
Initial Operation Date | September 1994 |
Last Update | Sep 2024 |
Annual Generation | 213.2 GWh |
Annual Consumption | 5.6 M MMBtu |
Ranked #2,242 out of 11,852 Power Plants Nationwide | |
Ranked #23 out of 59 NON-Biogenic Municipal Solid Waste Power Plants Nationwide | |
Ranked #64 out of 279 Florida Power Plants | |
Ranked #6 out of 10 Florida NON-Biogenic Municipal Solid Waste Power Plants | |
Fuel Types | Non-biogenic Municipal Solid Waste : 54.6% Biogenic Municipal Solid Waste : 44.6% Gaseous Propane : 0.8% |
Map of Lee County Solid Waste Energy
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Lee County Solid Waste Energy.
Monthly Net Generation for Lee County Solid Waste Energy
Lee County Solid Waste Energy Details
Summary Information | |
---|---|
Plant Name | Lee County Solid Waste Energy (52010) |
Plant Address | 10500 Buckingham Road, Fort Myers, FL 33905 |
Utility | Lee County Board-Commissioners (10875) |
Latitude, Longitude | 26.63155, -81.76066 |
Generation Dates on File | Jan 2001 to Sep 2024 |
Initial Operation Date | September 1994 |
Annual Generation | 213.2 GWh |
Fuel Types | Non-biogenic Municipal Solid Waste : 54.6% Biogenic Municipal Solid Waste : 44.6% Gaseous Propane : 0.8% |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | Yes |
FERC Small Power Producer Docket Number | 90-158-000 |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | SERC |
Balancing Authority | Florida Power & Light Company (FPL) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | City Of Ft Myers |
Ash Impoundment | No |
Transmission / Distribution Owner | Florida Power & Light Co (6452) FL |
Grid Voltage | 138.00 kV |
Energy Storage | No |
Generator GEN1 Details Operating September 1994
Technology | Municipal Solid Waste |
---|---|
Prime Mover | Steam Turbine |
Ownership | Single Owner |
Nameplate Capacity | 39 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 39 MW |
Winter Capacity | 39 MW |
Minimum Load | 19 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | September 1994 |
Planned Retirement | September 2029 |
Combined Heat & Power | No |
---|---|
Sector Name | IPP Non-CHP (2) |
Energy Source | Municipal Solid Waste |
Startup Source | Gaseous Propane |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 12H |
Other Planned Modifications | No |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator GEN2 Details Operating August 2007
Technology | Municipal Solid Waste |
---|---|
Prime Mover | Steam Turbine |
Ownership | Single Owner |
Nameplate Capacity | 20 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 16 MW |
Winter Capacity | 16 MW |
Minimum Load | 10 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | August 2007 |
Planned Retirement | August 2072 |
Combined Heat & Power | No |
---|---|
Sector Name | IPP Non-CHP (2) |
Energy Source | Municipal Solid Waste |
Startup Source | Gaseous Propane |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 12H |
Other Planned Modifications | No |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Lee County Solid Waste Energy Plant Owners
Owner Name | Address | Generator | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Non-biogenic Municipal Solid Waste.
Nearby Power Plants
Below are closest 20 power plants surrounding Lee County Solid Waste Energy.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Babcock Preserve | Punta Gorda, FL | 138.8 GWh | 15.6 mi |
Babcock Solar Energy Center Hybrid | Punta Gorda, FL | 132.7 GWh | 15.9 mi |
Blue Heron Solar | Clewiston, FL | 145.0 GWh | 39.3 mi |
Caloosahatchee | Clewiston, FL | 116.1 GWh | 36.5 mi |
Cattle Ranch | Arcadia, FL | 138.6 GWh | 47.8 mi |
Citrus Solar Energy Center Hybrid | Arcadia, FL | 136.9 GWh | 47.7 mi |
DeSoto Next Generation Solar Energy | Arcadia, FL | 33.5 GWh | 47.9 mi |
Fort Myers | Ft. Myers, FL | 9.0 TWh | 4.7 mi |
Ghost Orchid Solar Energy Center | Clewiston, FL | 136.3 GWh | 47.2 mi |
Hammock Solar | Labelle, FL | 138.4 GWh | 27.2 mi |
Hawthorne Creek | TBD, FL | 99.3 GWh | 31.6 mi |
Immokalee | Immokalee, FL | 150.1 GWh | 22.9 mi |
Orchard | Ft. Pierce, FL | 132.2 GWh | 31.6 mi |
Port Charlotte Energy LLC | Punta Gorda, FL | 1.3 GWh | 16.8 mi |
Prairie Creek FL | TBD, FL | 143.8 GWh | 30.8 mi |
Rodeo Solar Center | Arcadia, FL | 143.9 GWh | 47.7 mi |
Sawgrass Solar Energy Center | Clewiston, FL | 138.4 GWh | 47 mi |
Waste Management Naples LFGTE Project | Naples, FL | 24.5 GWh | 33.5 mi |
Wildflower Solar Energy Center | Arcadia, FL | 148.4 GWh | 47.3 mi |
Woodyard | Clewiston, FL | 102.7 GWh | 46.6 mi |