Ledyard Windpower, LLC
1804 460th St, Lakota, IA 50451Plant Summary Information
Ledyard Windpower, LLC is ranked #27 out of 271 power plants in Iowa in terms of total annual net electricity generation.
Ledyard Windpower, LLC generated 137.2 GWh during the 3-month period between May 2024 to August 2024.
Plant Name | Ledyard Windpower, LLC |
---|---|
Utility Name | Duke Energy Renewables Services |
Location | Kossuth County, IA |
Initial Operation Date | December 2022 |
Last Update | Aug 2024 |
Annual Generation | 790.1 GWh |
Annual Consumption | 2.8 M MMBtu |
Ranked #887 out of 11,835 Power Plants Nationwide | |
Ranked #141 out of 1,343 Wind Power Plants Nationwide | |
Ranked #27 out of 271 Iowa Power Plants | |
Ranked #18 out of 123 Iowa Wind Power Plants | |
Fuel Types | Wind |
Previous Operator |
Ledyard Windpower, LLC (2021 to 2021) Duke Energy Renewables Services (2022 to 2023) |
Map of Ledyard Windpower, LLC
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Ledyard Windpower, LLC.
Monthly Net Generation for Ledyard Windpower, LLC
Ledyard Windpower, LLC Details
Summary Information | |
---|---|
Plant Name | Ledyard Windpower, LLC (65390) |
Plant Address | 1804 460th St, Lakota, IA 50451 |
Utility | Duke Energy Renewables Services (65411) |
Latitude, Longitude | 43.43008, -94.10695 |
Generation Dates on File | Dec 2022 to Aug 2024 |
Initial Operation Date | December 2022 |
Annual Generation | 790.1 GWh |
Fuel Types | Wind |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | MRO |
Balancing Authority | Midcontinent Independent Transmission System Operator, Inc.. (MISO) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | |
Ash Impoundment | |
Transmission / Distribution Owner | Iowa Lakes Electric Coop (9425) IA |
Grid Voltage | 345.00 kV |
Energy Storage | No |
Generator LDYRD Details Operating December 2022
Technology | Onshore Wind Turbine |
---|---|
Prime Mover | Wind Turbine, Onshore |
Ownership | Wholly Owned by Other Entity |
Nameplate Capacity | 207 MW |
Summer Capacity | 200 MW |
Winter Capacity | 200 MW |
Minimum Load | 3 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | December 2022 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Wind |
Turbines/Hydrokinetic Buoys | 46 |
Turbine Details | |
Number Of Turbines | 46 |
---|---|
Predominant Turbine Manufacturer | Vestas |
Predominant Turbine Model Number | V150-4.2 |
Design Wind Speed | 18.3 MPH |
Wind Quality Class | 2 - Medium Wind |
Turbine Hub Height Feet | 344 |
Ledyard Windpower, LLC Plant Owners
Owner Name | Address | Ownership |
---|---|---|
Ledyard Windpower, LLC | 550 S. Caldwell Street, NAS09, Suite 925, Charlotte, NC 28202 | 100.00% |
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Wind.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#131 | Golden West Power Partners LLC | Calhan, CO | 803.4 GWh |
#132 | Flat Top Wind I | Mullin, TX | 803.4 GWh |
#133 | Southern Hills Wind Farm | Creston, IA | 802.8 GWh |
#134 | Cedar Bluff Wind, LLC | Brownwell, KS | 802.5 GWh |
#135 | Freeborn Wind Farm | Glenville, MN | 801.7 GWh |
#136 | Upstream Wind Energy LLC | Neligh, NE | 798.1 GWh |
#137 | Crowned Ridge Wind II Energy Center | Watertown, SD | 796.8 GWh |
#138 | Burke Wind, LLC | Bowbells, ND | 795.2 GWh |
#139 | Heartland Divide II | Audubon, IA | 794.5 GWh |
#140 | Amadeus Wind Farm | Rotan, TX | 790.7 GWh |
#142 | Karankawa Wind LLC | Mathis, TX | 789.9 GWh |
#143 | Crocker Wind Farm | Conde, SD | 788.7 GWh |
#144 | Longhorn Wind | Silverton, TX | 788.4 GWh |
#145 | Whispering Willow North | Latimer, IA | 787.7 GWh |
#146 | Trinity Hills | Olney, TX | 786.1 GWh |
#147 | Great Pathfinder Wind | Stratford, IA | 785.6 GWh |
#148 | Bluestem | Beaver, OK | 781.3 GWh |
#149 | Lower Snake River Wind Energy Project | Pomeroy, WA | 780.8 GWh |
#150 | Plymouth Wind | Remsen, IA | 778.1 GWh |
#151 | Kingman Wind | Cunningham, KS | 777.3 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Ledyard Windpower, LLC.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Algona | Algona, IA | 1.4 GWh | 25.5 mi |
Bancroft | Bancroft, IA | 320.0 MWh | 11 mi |
Big Blue | Blue Earth, MN | 74.6 GWh | 13.3 mi |
Blue Breezes II LLC | Blue Earth, MN | 418.0 MWh | 15.8 mi |
Blue Breezes LLC | Blue Earth, MN | 418.0 MWh | 15.8 mi |
Blue Earth | Blue Earth, MN | 31.0 MWh | 14.3 mi |
Crystal Lake 3 LLC | Britt, IA | 243.0 GWh | 13.6 mi |
Fairmont (MN) | Fairmont, MN | 13.0 GWh | 23.8 mi |
Fairmont Wind | Fairmont, MN | 11.9 GWh | 19.8 mi |
Forest City Light Plant | Forest City, IA | 120.0 MWh | 26.4 mi |
Forest City Solar | Forest City, IA | 5.0 GWh | 26.3 mi |
FPL Energy Crystal Lake Wind II LLC | Britt, IA | 725.2 GWh | 18.8 mi |
FPL Energy Crystal Lake Wind LLC | Britt, IA | 556.5 GWh | 20.5 mi |
Golden Plains | Buffalo Center, IA | 744.5 GWh | 4.5 mi |
Iowa Distributed Wind Generation Project | Algona, IA | 4.3 GWh | 27.4 mi |
Lake Mills | Lake Mills, IA | 32.0 MWh | 28.9 mi |
Lake Mills Gas Recovery | Lake Mills, IA | 19.2 GWh | 27.7 mi |
Lakota Wind Wind Farm | Lakota, IA | 32.2 GWh | 3.8 mi |
Palo Alto Wind Farm | Emmetsburg, IA | 1.5 TWh | 27 mi |
Winnebago Wind Power Project | Forest City, IA | 52.4 GWh | 18.7 mi |