Laurel Oaks Solar
6202 Miles Farm Road, Plant City, FL 33567Plant Summary Information
Laurel Oaks Solar is ranked #83 out of 165 solar farms in Florida in terms of total annual net electricity generation.
Laurel Oaks Solar generated 31.2 GWh during the 3-month period between December 2023 to March 2024.
Plant Name | Laurel Oaks Solar |
---|---|
Utility Name | Tampa Electric Co |
Location | Hillsborough County, FL |
Initial Operation Date | December 2022 |
Last Update | Mar 2024 |
Annual Generation | 128.5 GWh |
Annual Consumption | 438.4 k MMBtu |
Ranked #2,863 out of 11,249 Power Plants Nationwide | |
Ranked #443 out of 5,158 Solar Power Plants Nationwide | |
Ranked #156 out of 272 Florida Power Plants | |
Ranked #83 out of 165 Florida Solar Power Plants | |
Fuel Types | Solar |
Map of Laurel Oaks Solar
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Laurel Oaks Solar.
Monthly Net Generation for Laurel Oaks Solar
Laurel Oaks Solar Details
Summary Information | |
---|---|
Plant Name | Laurel Oaks Solar (65684) |
Plant Address | 6202 Miles Farm Road Plant City, FL 33567 |
Utility | Tampa Electric Co (18454) |
Latitude, Longitude | 27.92688, -82.06767 |
Generation Dates on File | Dec 2022 to Mar 2024 |
Initial Operation Date | December 2022 |
Annual Generation | 128.5 GWh |
Fuel Types | Solar |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Regulated |
NERC Region | SERC |
Balancing Authority | Tampa Electric Company (TEC) |
NAICS Code | Utilities (22) |
Sector | Electric Utility (1) |
Water Source | |
Ash Impoundment | |
Transmission / Distribution Owner | Tampa Electric Co (18454) FL |
Grid Voltage | 69.00 kV |
Energy Storage | No |
Generator 1 Details Operating December 2022
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Single Owner |
Nameplate Capacity | 61.2 MW |
Summer Capacity | 61.2 MW |
Winter Capacity | 61.2 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | December 2022 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Solar |
Solar Details | |
Single Axis Tracking | Yes |
---|---|
Azimuth Angle | 180 |
DC Net Capacity | 72.2 MW |
Thin Film CDTE | Yes |
Net Metering Agreement | No |
Virtual Net Metering Agreement | No |
Laurel Oaks Solar Plant Owners
Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#433 | High Springs Solar Power Plant | High Springs, FL | 133.3 GWh |
#434 | Luning Energy | Luning, NV | 132.2 GWh |
#435 | Techren Solar V | Boulder, NV | 131.7 GWh |
#436 | Wheatridge Hybrid | Morrow, OR | 733.4 GWh |
#437 | Little Manatee River Solar | Ruskin, FL | 131.6 GWh |
#438 | Midway Solar Farm 1 | Calipatria, CA | 131.6 GWh |
#439 | Umbriel Solar | TX | 131.3 GWh |
#440 | Lamesa II | Lamesa, TX | 131.2 GWh |
#441 | Borden Solar Farm | Madera, CA | 130.8 GWh |
#442 | Granite Mountain Solar West, LLC | Cedar City, UT | 129.9 GWh |
#444 | LA3 West Baton Rouge Solar Facility | West Baton Rouge, LA | 127.7 GWh |
#445 | Debary Solar Power Plant | DeBary, FL | 127.6 GWh |
#446 | Lockhart Solar PV II | Hinkley, CA | 127.5 GWh |
#447 | Warsaw Farm | Warsaw, NC | 126.9 GWh |
#448 | Payne Creek Solar | Bowling Green, FL | 126.0 GWh |
#449 | First City Solar Energy Center | McDavid, FL | 125.9 GWh |
#450 | Fifth Standard Solar PV, LLC (Hybrid) | Huron, CA | 112.3 GWh |
#451 | Solar Star Oregon II | Prineville, OR | 125.3 GWh |
#452 | RE Camelot LLC | Mojave, CA | 125.2 GWh |
#453 | OE_GA3 | Camilla, GA | 124.9 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Laurel Oaks Solar.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Alafia Solar | Mulberry, FL | 31.8 GWh | 14.3 mi |
Balm Solar | Wimauma, FL | 117.1 GWh | 14.9 mi |
Bartow Solar Energy LLC | Bartow, FL | 12.6 GWh | 15.2 mi |
Bonnie Mine Solar | Bartow, FL | 58.6 GWh | 5.5 mi |
C D McIntosh Jr | Lakeland, FL | 1.9 TWh | 13.8 mi |
Dover Solar | Dover, FL | 14.3 GWh | 8.4 mi |
Durrance | Mulberry, FL | 116.5 GWh | 11.5 mi |
Goldfinch | Lakeland, FL | 2.8 GWh | 4.1 mi |
Jamison Solar (FL) | Mulberry, FL | 137.7 GWh | 10.8 mi |
Lake Hancock Solar | Bartow, FL | 95.9 GWh | 14.5 mi |
Lakeland Electric Co. (FL)-Airport 1 | Lakeland, FL | 2.2 GWh | 4.4 mi |
Larsen Memorial | Lakeland, FL | 211.2 GWh | 12.2 mi |
Lithia Solar | Lithia, FL | 133.4 GWh | 13.4 mi |
LKL BLBD, LLC | Lakeland, FL | 10.5 GWh | 10.1 mi |
Magnolia Solar | Mulberry, FL | 145.3 GWh | 1.3 mi |
Mosaic Co Bartow Facility | Bartow, FL | 143.1 GWh | 9.2 mi |
Mosaic New Wales Operations | Mulberry, FL | 420.0 GWh | 6.5 mi |
Mosaic South Pierce Operations | Mulberry, FL | 173.7 GWh | 13.7 mi |
Mulberry Cogeneration Facility | Bartow, FL | 398.9 GWh | 12.8 mi |
Polk | Mulberry, FL | 6.3 TWh | 14.5 mi |