Laurel Oaks Solar
6202 Miles Farm Road, Plant City, FL 33567Plant Summary Information
Laurel Oaks Solar is ranked #105 out of 199 solar farms in Florida in terms of total annual net electricity generation.
Laurel Oaks Solar generated 22.9 GWh during the 3-month period between October 2024 to January 2025.
Plant Name | Laurel Oaks Solar |
---|---|
Utility Name | Tampa Electric Co |
Location | Hillsborough County, FL |
Initial Operation Date | December 2022 |
Last Update | Jan 2025 |
Annual Generation | 121.9 GWh |
Annual Consumption | 436.3 k MMBtu |
Ranked #2,998 out of 11,979 Power Plants Nationwide | |
Ranked #567 out of 5,765 Solar Power Plants Nationwide | |
Ranked #178 out of 307 Florida Power Plants | |
Ranked #105 out of 199 Florida Solar Power Plants | |
Fuel Types | Solar |
Map of Laurel Oaks Solar
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Laurel Oaks Solar.
Monthly Net Generation for Laurel Oaks Solar
Laurel Oaks Solar Details
Summary Information | |
---|---|
Plant Name | Laurel Oaks Solar (65684) |
Plant Address | 6202 Miles Farm Road, Plant City, FL 33567 |
Utility | Tampa Electric Co (18454) |
Latitude, Longitude | 27.92688, -82.06767 |
Generation Dates on File | Dec 2022 to Jan 2025 |
Initial Operation Date | December 2022 |
Annual Generation | 121.9 GWh |
Fuel Types | Solar |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Regulated |
NERC Region | SERC |
Balancing Authority | Tampa Electric Company (TEC) |
NAICS Code | Utilities (22) |
Sector | Electric Utility (1) |
Water Source | |
Ash Impoundment | |
Transmission / Distribution Owner | Tampa Electric Co (18454) FL |
Grid Voltage | 69.00 kV |
Energy Storage | No |
Generator 1 Details Operating December 2022
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Single Owner |
Nameplate Capacity | 61.2 MW |
Summer Capacity | 61.2 MW |
Winter Capacity | 61.2 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | December 2022 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Solar |
Solar Details | |
Single Axis Tracking | Yes |
---|---|
Azimuth Angle | 180 |
DC Net Capacity | 72.2 MW |
Thin Film CDTE | Yes |
Net Metering Agreement | No |
Virtual Net Metering Agreement | No |
Laurel Oaks Solar Plant Owners
Owner Name | Address | Ownership | |
---|---|---|---|
We couldn't locate any owners for this plant |
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#557 | Fort Drum Energy Center | Vero Beach, FL | 125.0 GWh |
#558 | FPL Flowers Creek Solar Energy Center | Altha, FL | 125.0 GWh |
#559 | Innovative Solar 42 | Fayetteville, NC | 124.4 GWh |
#560 | Elizabeth Solar Plant | Pitkin, LA | 123.9 GWh |
#561 | Lamesa II | Lamesa, TX | 123.5 GWh |
#562 | Caden Energix Axton LLC | Axton, VA | 123.4 GWh |
#563 | TWE Bowman Solar Project | Bowman, SC | 123.4 GWh |
#564 | Paddock Solar | Beloit, WI | 123.1 GWh |
#565 | Twin Lakes | Interlachen, FL | 122.6 GWh |
#566 | Desper Solar | Louisa, VA | 122.5 GWh |
#568 | Bedford Solar | Chesapeake, VA | 121.7 GWh |
#569 | Boulder Solar II, LLC | Boulder City, NV | 121.6 GWh |
#570 | Midway Solar Farm 1 | Calipatria, CA | 121.4 GWh |
#571 | Payne Creek Solar | Bowling Green, FL | 121.2 GWh |
#572 | Sweetbay Solar Center | North of Indiantown, FL | 120.5 GWh |
#573 | Warsaw Farm | Warsaw, NC | 120.3 GWh |
#574 | Alafia Solar | Mulberry, FL | 119.9 GWh |
#575 | Meridian III | Meridian, MS | 119.6 GWh |
#576 | Palmetto Plains | Bowman, SC | 119.4 GWh |
#577 | Little Bear 5 | Mendota, CA | 119.2 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Laurel Oaks Solar.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Alafia Solar | Mulberry, FL | 119.9 GWh | 14.3 mi |
Balm Solar | Wimauma, FL | 132.2 GWh | 15.2 mi |
Bartow Solar Energy LLC | Bartow, FL | 12.7 GWh | 15.2 mi |
Bonnie Mine Solar | Bartow, FL | 58.6 GWh | 5.5 mi |
C D McIntosh Jr | Lakeland, FL | 2.3 TWh | 13.8 mi |
Dover Solar | Dover, FL | 50.0 GWh | 8.4 mi |
Durrance | Mulberry, FL | 82.8 GWh | 11.5 mi |
Goldfinch | Lakeland, FL | 2.2 GWh | 4.1 mi |
Jamison Solar (FL) | Mulberry, FL | 144.2 GWh | 10.8 mi |
Lake Hancock Solar | Bartow, FL | 93.2 GWh | 14.5 mi |
Lakeland Electric Co. (FL)-Airport 1 | Lakeland, FL | 2.0 GWh | 4.4 mi |
Larsen Memorial | Lakeland, FL | 237.6 GWh | 12.2 mi |
Lithia Solar | Lithia, FL | 129.1 GWh | 13.4 mi |
LKL BLBD, LLC | Lakeland, FL | 8.1 GWh | 10.1 mi |
Magnolia Solar | Mulberry, FL | 140.3 GWh | 1.3 mi |
Mosaic Co Bartow Facility | Bartow, FL | 154.2 GWh | 9.2 mi |
Mosaic New Wales Operations | Mulberry, FL | 385.3 GWh | 6.5 mi |
Mosaic South Pierce Operations | Mulberry, FL | 124.8 GWh | 13.7 mi |
Mulberry Cogeneration Facility | Bartow, FL | 399.7 GWh | 12.8 mi |
Polk | Mulberry, FL | 5.8 TWh | 14.5 mi |