Laredo Detention Facility - Solar 2, 3

17695 Industrial Farm Rd, Bakersfield, CA 93308

Plant Summary Information

Laredo Detention Facility - Solar 2, 3 is ranked #309 out of 801 solar farms in California in terms of total annual net electricity generation.

Laredo Detention Facility - Solar 2, 3 generated 1.6 GWh during the 3-month period between September 2023 to December 2023.

Plant NameLaredo Detention Facility - Solar 2, 3
Utility NameCounty of Kern
LocationKern County, CA
Initial Operation DateNovember 2021
Last Update Dec 2023
Annual Generation 9.2 GWh
Annual Consumption 32.3 k MMBtu
Ranked #6,172 out of 11,866 Power Plants Nationwide
Ranked #1,724 out of 5,672 Solar Power Plants Nationwide
Ranked #871 out of 1,571 California Power Plants
Ranked #309 out of 801 California Solar Power Plants
Fuel Types Solar

Map of Laredo Detention Facility - Solar 2, 3

Full Screen Map

Register Now for Comprehensive Access

Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Laredo Detention Facility - Solar 2, 3.

Create Your Account Today

Monthly Net Generation for Laredo Detention Facility - Solar 2, 3

Laredo Detention Facility - Solar 2, 3 Details

Summary Information
Plant NameLaredo Detention Facility - Solar 2, 3 (65464)
Plant Address17695 Industrial Farm Rd, Bakersfield, CA 93308
UtilityCounty of Kern (64731)
Latitude, Longitude35.51094, -119.10994
Generation Dates on FileNov 2021 to Dec 2023
Initial Operation DateNovember 2021
Annual Generation 9.2 GWh
Fuel Types Solar
 
Federal Energy Regulatory Commission (FERC) Information
FERC Cogeneration StatusNo
FERC Small Power Producer StatusNo
FERC Exempt Wholesale Generator StatusNo
Regulatory Information
Regulatory StatusRegulated
NERC RegionWECC
Balancing AuthorityCalifornia Independent System Operator (CISO)
NAICS CodeUtilities (22)
Sector Electric Utility (1)
Water Source
Ash Impoundment No
Transmission / Distribution OwnerPacific Gas & Electric Co. (14328) CA
Grid Voltage 12.47 kV
Energy StorageNo

Generator LDF2 Details Operating November 2021

TechnologySolar Photovoltaic
Prime MoverPhotovoltaic
OwnershipSingle Owner
Nameplate Capacity3.1 MW
Summer Capacity3 MW
Winter Capacity2.3 MW
Uprate/Derate Completed No
StatusOperating
First Operation DateNovember 2021
Combined Heat & Power No
Sector NameElectric Utility (1)
Energy SourceSolar
Multiple FuelsNo
Solar Details
Fixed TiltYes
Azimuth Angle180
Tilt Angle10
DC Net Capacity3.4 MW
Crystalline SiliconYes
Net Metering AgreementYes
Net Metering DC Capacity2.4 MW
Virtual Net Metering AgreementNo

Generator LDF3 Details Operating November 2021

TechnologySolar Photovoltaic
Prime MoverPhotovoltaic
OwnershipSingle Owner
Nameplate Capacity2.1 MW
Summer Capacity2.1 MW
Winter Capacity1.7 MW
Uprate/Derate Completed No
StatusOperating
First Operation DateNovember 2021
Combined Heat & Power No
Sector NameElectric Utility (1)
Energy SourceSolar
Multiple FuelsNo
Solar Details
Fixed TiltYes
Azimuth Angle180
Tilt Angle10
DC Net Capacity3.3 MW
Crystalline SiliconYes
Net Metering AgreementYes
Net Metering DC Capacity3.3 MW
Virtual Net Metering AgreementNo

Laredo Detention Facility - Solar 2, 3 Plant Owners

Owner NameAddressGeneratorOwnership
We couldn't locate any owners for this plant

Power Plants with Similar Net Generation

Power plants with a similar annual net generation from Solar.

RankPlant NamePlant LocationAnnual Generation
#1714Rock FarmRockingham, NC9.2 GWh
#1715Walters Solar (FLS 260)Orrum, NC9.2 GWh
#1716Sartell Holdco CSGSartell, MN9.2 GWh
#1717Haley SolarAllendale, SC9.2 GWh
#1718Fisher Solar Farm - NCOakboro, NC9.2 GWh
#1719Pecan PV1Cordova, NC9.2 GWh
#1720Spring Hope Solar 2, LLCSpring Hope, NC9.2 GWh
#1721North Nash Farm, LLCCastalia, NC9.2 GWh
#1722Bayboro Solar FarmAlliance, NC9.2 GWh
#1723Tiburon HoldingsAdvance, NC9.2 GWh
#1725Mustang SolarRobbins, NC9.2 GWh
#1726Noland Wastewater Treatment Plant HybridFayetteville, AR8.9 GWh
#1727Windsor SolarWindsor, NC9.2 GWh
#1728Lincoln Solar, LLC (NC)Bostic, NC9.2 GWh
#1729Monroe County Sites C, D, & EHilton, NY9.2 GWh
#1730Sweetgum SolarSanford, NC9.2 GWh
#1731Scenic Hill Solar IIIClarksville, AR9.1 GWh
#1732Creech Solar 2, LLCGarner, NC9.1 GWh
#1733Woodland SolarWoodland, NC9.1 GWh
#1734Walcott Solar CSGFaribault, MN9.1 GWh

Nearby Power Plants

Below are closest 20 power plants surrounding Laredo Detention Facility - Solar 2, 3.

Plant NamePlant LocationAnnual GenerationDistance
Badger Creek LimitedBakersfield, CA15.9 GWh4.9 mi
Bakersfield College Solar 01Bakersfield, CA2.1 GWh10.5 mi
Bear Mountain LimitedBakersfield, CA33.0 GWh12.1 mi
Broadway 4 - Target ShafterShafter, CA3.1 GWh5.5 mi
Calibrant Bakersfield LLCBakersfield, CA2.4 GWh4.8 mi
Double C Generation Limited PartnershipBakersfield, CA22.9 GWh3.7 mi
E&B ResourcesBakersfield, CA2.3 GWh3.2 mi
Frontier HS Solar ProjectBakersfield, CA2.6 GWh6.8 mi
High Sierra LimitedBakersfield, CA23.3 GWh4.5 mi
Improvement Dst No. 4Bakersfield, CA8.0 MWh8.5 mi
Kern Front LimitedBakersfield, CA22.0 GWh3.9 mi
Kern River CogenerationBakersfield, CA177.8 GWh8.1 mi
Kern River Eastridge CogenBakersfield, CA229.2 GWh9.7 mi
Liberty HS Solar ProjectBakersfield, CA2.3 GWh10.2 mi
Live Oak LimitedBakersfield, CA14.6 GWh4.9 mi
Mt Poso CogenerationBakersfield, CA267.8 GWh7.4 mi
Shafter Solar LLCBakersfield, CA48.2 GWh8.2 mi
Southeast Kern River CogenBakersfield, CA77.9 GWh10.3 mi
Sycamore CogenerationBakersfield, CA333.3 GWh8.1 mi
Western Power & Steam IncBakersfield, CA28.1 GWh7.3 mi