Laredo Detention Facility - Solar 2, 3
17695 Industrial Farm Rd, Bakersfield, CA 93308Plant Summary Information
Laredo Detention Facility - Solar 2, 3 is ranked #307 out of 799 solar farms in California in terms of total annual net electricity generation.
Laredo Detention Facility - Solar 2, 3 generated 1.6 GWh during the 3-month period between September 2023 to December 2023.
Plant Name | Laredo Detention Facility - Solar 2, 3 |
---|---|
Utility Name | County of Kern |
Location | Kern County, CA |
Initial Operation Date | November 2021 |
Last Update | Dec 2023 |
Annual Generation | 9.2 GWh |
Annual Consumption | 32.3 k MMBtu |
Ranked #6,148 out of 11,835 Power Plants Nationwide | |
Ranked #1,700 out of 5,643 Solar Power Plants Nationwide | |
Ranked #867 out of 1,569 California Power Plants | |
Ranked #307 out of 799 California Solar Power Plants | |
Fuel Types | Solar |
Map of Laredo Detention Facility - Solar 2, 3
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Laredo Detention Facility - Solar 2, 3.
Monthly Net Generation for Laredo Detention Facility - Solar 2, 3
Laredo Detention Facility - Solar 2, 3 Details
Summary Information | |
---|---|
Plant Name | Laredo Detention Facility - Solar 2, 3 (65464) |
Plant Address | 17695 Industrial Farm Rd, Bakersfield, CA 93308 |
Utility | County of Kern (64731) |
Latitude, Longitude | 35.51094, -119.10994 |
Generation Dates on File | Nov 2021 to Dec 2023 |
Initial Operation Date | November 2021 |
Annual Generation | 9.2 GWh |
Fuel Types | Solar |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Regulated |
NERC Region | WECC |
Balancing Authority | California Independent System Operator (CISO) |
NAICS Code | Utilities (22) |
Sector | Electric Utility (1) |
Water Source | |
Ash Impoundment | No |
Transmission / Distribution Owner | Pacific Gas & Electric Co. (14328) CA |
Grid Voltage | 12.47 kV |
Energy Storage | No |
Generator LDF2 Details Operating November 2021
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Single Owner |
Nameplate Capacity | 3.1 MW |
Summer Capacity | 3 MW |
Winter Capacity | 2.3 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | November 2021 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Solar |
Multiple Fuels | No |
Solar Details | |
Fixed Tilt | Yes |
---|---|
Azimuth Angle | 180 |
Tilt Angle | 10 |
DC Net Capacity | 3.4 MW |
Crystalline Silicon | Yes |
Net Metering Agreement | Yes |
Net Metering DC Capacity | 2.4 MW |
Virtual Net Metering Agreement | No |
Generator LDF3 Details Operating November 2021
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Single Owner |
Nameplate Capacity | 2.1 MW |
Summer Capacity | 2.1 MW |
Winter Capacity | 1.7 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | November 2021 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Solar |
Multiple Fuels | No |
Solar Details | |
Fixed Tilt | Yes |
---|---|
Azimuth Angle | 180 |
Tilt Angle | 10 |
DC Net Capacity | 3.3 MW |
Crystalline Silicon | Yes |
Net Metering Agreement | Yes |
Net Metering DC Capacity | 3.3 MW |
Virtual Net Metering Agreement | No |
Laredo Detention Facility - Solar 2, 3 Plant Owners
Owner Name | Address | Generator | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#1690 | Walters Solar (FLS 260) | Orrum, NC | 9.2 GWh |
#1691 | Sartell Holdco CSG | Sartell, MN | 9.2 GWh |
#1692 | Haley Solar | Allendale, SC | 9.2 GWh |
#1693 | Fisher Solar Farm - NC | Oakboro, NC | 9.2 GWh |
#1694 | Pecan PV1 | Cordova, NC | 9.2 GWh |
#1695 | Spring Hope Solar 2, LLC | Spring Hope, NC | 9.2 GWh |
#1696 | North Nash Farm, LLC | Castalia, NC | 9.2 GWh |
#1697 | Noland Wastewater Treatment Plant Hybrid | Fayetteville, AR | 8.9 GWh |
#1698 | Bayboro Solar Farm | Alliance, NC | 9.2 GWh |
#1699 | Tiburon Holdings | Advance, NC | 9.2 GWh |
#1701 | Mustang Solar | Robbins, NC | 9.2 GWh |
#1702 | Windsor Solar | Windsor, NC | 9.2 GWh |
#1703 | Lincoln Solar, LLC (NC) | Bostic, NC | 9.2 GWh |
#1704 | Monroe County Sites C, D, & E | Hilton, NY | 9.2 GWh |
#1705 | Sweetgum Solar | Sanford, NC | 9.2 GWh |
#1706 | Scenic Hill Solar III | Clarksville, AR | 9.1 GWh |
#1707 | Creech Solar 2, LLC | Garner, NC | 9.1 GWh |
#1708 | Woodland Solar | Woodland, NC | 9.1 GWh |
#1709 | Walcott Solar CSG | Faribault, MN | 9.1 GWh |
#1710 | Long Farm 46 Solar, LLC | Garysburg, NC | 9.1 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Laredo Detention Facility - Solar 2, 3.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Badger Creek Limited | Bakersfield, CA | 17.9 GWh | 4.9 mi |
Bakersfield College Solar 01 | Bakersfield, CA | 2.1 GWh | 10.5 mi |
Bear Mountain Limited | Bakersfield, CA | 40.4 GWh | 12.1 mi |
Broadway 4 - Target Shafter | Shafter, CA | 3.1 GWh | 5.5 mi |
Calibrant Bakersfield LLC | Bakersfield, CA | 2.4 GWh | 4.8 mi |
Double C Generation Limited Partnership | Bakersfield, CA | 22.9 GWh | 3.7 mi |
E&B Resources | Bakersfield, CA | 2.3 GWh | 3.2 mi |
Frontier HS Solar Project | Bakersfield, CA | 2.6 GWh | 6.8 mi |
High Sierra Limited | Bakersfield, CA | 23.3 GWh | 4.5 mi |
Improvement Dst No. 4 | Bakersfield, CA | 8.0 MWh | 8.5 mi |
Kern Front Limited | Bakersfield, CA | 22.0 GWh | 3.9 mi |
Kern River Cogeneration | Bakersfield, CA | 155.5 GWh | 8.1 mi |
Kern River Eastridge Cogen | Bakersfield, CA | 223.0 GWh | 9.7 mi |
Liberty HS Solar Project | Bakersfield, CA | 2.3 GWh | 10.2 mi |
Live Oak Limited | Bakersfield, CA | 21.3 GWh | 4.9 mi |
Mt Poso Cogeneration | Bakersfield, CA | 267.8 GWh | 7.4 mi |
Shafter Solar LLC | Bakersfield, CA | 48.2 GWh | 8.2 mi |
Southeast Kern River Cogen | Bakersfield, CA | 95.7 GWh | 10.3 mi |
Sycamore Cogeneration | Bakersfield, CA | 376.5 GWh | 8.1 mi |
Western Power & Steam Inc | Bakersfield, CA | 37.6 GWh | 7.3 mi |