Lapetus

7351 Northwest 2001, Andrews, TX 79714

Plant Summary Information

Lapetus is ranked #77 out of 166 solar farms in Texas in terms of total annual net electricity generation.

Lapetus generated 63.9 GWh during the 3-month period between June 2024 to September 2024.

Plant NameLapetus
Utility NameDuke Energy Renewables Services
LocationAndrews County, TX
Initial Operation DateDecember 2019
Last Update Sep 2024
Annual Generation 186.1 GWh
Annual Consumption 697.7 k MMBtu
Ranked #2,403 out of 11,852 Power Plants Nationwide
Ranked #294 out of 5,655 Solar Power Plants Nationwide
Ranked #406 out of 754 Texas Power Plants
Ranked #77 out of 166 Texas Solar Power Plants
Fuel Types Solar
Previous Operator Lapetus Energy Project LLC (2018 to 2021)
Duke Energy Renewables Services (2022 to 2023)

Map of Lapetus

Full Screen Map

Register Now for Comprehensive Access

Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Lapetus.

Create Your Account Today

Monthly Net Generation for Lapetus

Lapetus Details

Summary Information
Plant NameLapetus (62448)
Plant Address7351 Northwest 2001, Andrews, TX 79714
UtilityDuke Energy Renewables Services (65411)
Latitude, Longitude32.46005, -102.67281
Generation Dates on FileDec 2019 to Sep 2024
Initial Operation DateDecember 2019
Annual Generation 186.1 GWh
Fuel Types Solar
 
Federal Energy Regulatory Commission (FERC) Information
FERC Cogeneration StatusNo
FERC Small Power Producer StatusNo
FERC Exempt Wholesale Generator StatusNo
Regulatory Information
Regulatory StatusNon-Regulated
NERC RegionTRE
Balancing AuthorityElectric Reliability Council of Texas, Inc. (ERCO)
NAICS CodeUtilities (22)
Sector IPP Non-CHP (2)
Water Source
Ash Impoundment
Transmission / Distribution OwnerOncor Electric Delivery Company LLC (44372) TX
Grid Voltage 138.00 kV
Energy StorageNo

Generator LAP Details Operating December 2019

TechnologySolar Photovoltaic
Prime MoverPhotovoltaic
OwnershipWholly Owned by Other Entity
Nameplate Capacity100 MW
Summer Capacity100 MW
Winter Capacity100 MW
Uprate/Derate Completed No
StatusOperating
First Operation DateDecember 2019
Combined Heat & Power No
Sector NameIPP Non-CHP (2)
Energy SourceSolar
Solar Details
Single Axis TrackingYes
Azimuth Angle180
DC Net Capacity133 MW
Crystalline SiliconYes
Net Metering AgreementNo
Virtual Net Metering AgreementNo

Lapetus Plant Owners

Owner NameAddressOwnership
Lapetus Energy Project, LLC550 S. Caldwell Street, NAS09, Suite 925, Charlotte, NC 28202100.00%

Power Plants with Similar Net Generation

Power plants with a similar annual net generation from Solar.

RankPlant NamePlant LocationAnnual Generation
#284Aulander Holloman Solar, LLCAulander, NC190.9 GWh
#285Robins Air Force Base SolarMacon, GA190.7 GWh
#286Utah Red Hills Renewable Energy ParkParowan, UT189.8 GWh
#287Crooked Lake Solar, LLCBlytheville, AR189.6 GWh
#288Three Peaks PowerCedar City, UT189.5 GWh
#289North Star Solar ProjectNorth Branch, MN189.2 GWh
#290White Pine Solar, LLCButler, GA188.2 GWh
#291Playa Solar 1, LLCNorth Las Vegas, NV187.7 GWh
#292Lockhart Solar PV IIHinkley, CA187.2 GWh
#293Bell Ridge SolarTrenton, FL186.2 GWh
#295Delta's Edge SolarGreenwood, MS185.5 GWh
#296OETN1Obion, TN185.1 GWh
#297South Cheyenne SolarSouth Greeley, WY183.0 GWh
#298Water Strider SolarNathalie, VA181.9 GWh
#299Sweetwater SolarGreen River, WY180.5 GWh
#300Chesapeake Solar ProjectChesapeake, VA180.5 GWh
#301Hopkins Energy LLCDike, TX180.3 GWh
#302OE_ESCLGrants, NM180.0 GWh
#303SnipesvilleDenton, GA180.0 GWh
#304Lancaster Solar GAArlington, GA178.8 GWh

Nearby Power Plants

Below are closest 20 power plants surrounding Lapetus.

Plant NamePlant LocationAnnual GenerationDistance
2W Permian Solar Project HybridAndrews, TX898.9 GWh25.2 mi
BakkeAndrews, TX877.0 MWh13.7 mi
Ector County Energy CenterGoldsmith, TX425.6 GWh27.5 mi
FrankelAndrews, TX645.0 MWh8.4 mi
GoldsmithGoldsmith, TX670.0 MWh33.6 mi
Jumbo Hill Wind ProjectAndrews, TX589.0 GWh16.9 mi
MaddoxHobbs, NM699.8 GWh40.6 mi
Mustang StationDenver City, TX2.2 TWh35.7 mi
Mustang Station Unit 4Denver City, TX853.8 GWh35.8 mi
N. Mary FrancisOdessa, TX782.0 MWh39.8 mi
Notrees Windpower HybridGoldsmith, TX232.8 GWh33.4 mi
Oxy Renewable Energy - GoldsmithGoldsmith, TX42.7 GWh31.8 mi
Prospero SolarAndrews, TX747.8 GWh15.4 mi
Prospero Solar IIAndrews, TX675.0 GWh16.2 mi
SPS1 DollarhideJal, NM22.1 GWh35.6 mi
SPS2 JalJal, NM18.9 GWh35.4 mi
SPS3 LeaEunice, NM23.0 GWh37.9 mi
SPS4 MonumentMonument, NM22.3 GWh39.8 mi
TumbleweedAndrews, TX903.0 MWh10.1 mi
Wasson CO2 Removal PlantDenver City, TX137.2 GWh38.3 mi