Lapetus
7351 Northwest 2001, Andrews, TX 79714Plant Summary Information
Lapetus is ranked #77 out of 166 solar farms in Texas in terms of total annual net electricity generation.
Lapetus generated 63.9 GWh during the 3-month period between June 2024 to September 2024.
Plant Name | Lapetus |
---|---|
Utility Name | Duke Energy Renewables Services |
Location | Andrews County, TX |
Initial Operation Date | December 2019 |
Last Update | Sep 2024 |
Annual Generation | 186.1 GWh |
Annual Consumption | 697.7 k MMBtu |
Ranked #2,403 out of 11,852 Power Plants Nationwide | |
Ranked #294 out of 5,655 Solar Power Plants Nationwide | |
Ranked #406 out of 754 Texas Power Plants | |
Ranked #77 out of 166 Texas Solar Power Plants | |
Fuel Types | Solar |
Previous Operator |
Lapetus Energy Project LLC (2018 to 2021) Duke Energy Renewables Services (2022 to 2023) |
Map of Lapetus
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Lapetus.
Monthly Net Generation for Lapetus
Lapetus Details
Summary Information | |
---|---|
Plant Name | Lapetus (62448) |
Plant Address | 7351 Northwest 2001, Andrews, TX 79714 |
Utility | Duke Energy Renewables Services (65411) |
Latitude, Longitude | 32.46005, -102.67281 |
Generation Dates on File | Dec 2019 to Sep 2024 |
Initial Operation Date | December 2019 |
Annual Generation | 186.1 GWh |
Fuel Types | Solar |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | TRE |
Balancing Authority | Electric Reliability Council of Texas, Inc. (ERCO) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | |
Ash Impoundment | |
Transmission / Distribution Owner | Oncor Electric Delivery Company LLC (44372) TX |
Grid Voltage | 138.00 kV |
Energy Storage | No |
Generator LAP Details Operating December 2019
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Wholly Owned by Other Entity |
Nameplate Capacity | 100 MW |
Summer Capacity | 100 MW |
Winter Capacity | 100 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | December 2019 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Solar |
Solar Details | |
Single Axis Tracking | Yes |
---|---|
Azimuth Angle | 180 |
DC Net Capacity | 133 MW |
Crystalline Silicon | Yes |
Net Metering Agreement | No |
Virtual Net Metering Agreement | No |
Lapetus Plant Owners
Owner Name | Address | Ownership |
---|---|---|
Lapetus Energy Project, LLC | 550 S. Caldwell Street, NAS09, Suite 925, Charlotte, NC 28202 | 100.00% |
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#284 | Aulander Holloman Solar, LLC | Aulander, NC | 190.9 GWh |
#285 | Robins Air Force Base Solar | Macon, GA | 190.7 GWh |
#286 | Utah Red Hills Renewable Energy Park | Parowan, UT | 189.8 GWh |
#287 | Crooked Lake Solar, LLC | Blytheville, AR | 189.6 GWh |
#288 | Three Peaks Power | Cedar City, UT | 189.5 GWh |
#289 | North Star Solar Project | North Branch, MN | 189.2 GWh |
#290 | White Pine Solar, LLC | Butler, GA | 188.2 GWh |
#291 | Playa Solar 1, LLC | North Las Vegas, NV | 187.7 GWh |
#292 | Lockhart Solar PV II | Hinkley, CA | 187.2 GWh |
#293 | Bell Ridge Solar | Trenton, FL | 186.2 GWh |
#295 | Delta's Edge Solar | Greenwood, MS | 185.5 GWh |
#296 | OETN1 | Obion, TN | 185.1 GWh |
#297 | South Cheyenne Solar | South Greeley, WY | 183.0 GWh |
#298 | Water Strider Solar | Nathalie, VA | 181.9 GWh |
#299 | Sweetwater Solar | Green River, WY | 180.5 GWh |
#300 | Chesapeake Solar Project | Chesapeake, VA | 180.5 GWh |
#301 | Hopkins Energy LLC | Dike, TX | 180.3 GWh |
#302 | OE_ESCL | Grants, NM | 180.0 GWh |
#303 | Snipesville | Denton, GA | 180.0 GWh |
#304 | Lancaster Solar GA | Arlington, GA | 178.8 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Lapetus.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
2W Permian Solar Project Hybrid | Andrews, TX | 898.9 GWh | 25.2 mi |
Bakke | Andrews, TX | 877.0 MWh | 13.7 mi |
Ector County Energy Center | Goldsmith, TX | 425.6 GWh | 27.5 mi |
Frankel | Andrews, TX | 645.0 MWh | 8.4 mi |
Goldsmith | Goldsmith, TX | 670.0 MWh | 33.6 mi |
Jumbo Hill Wind Project | Andrews, TX | 589.0 GWh | 16.9 mi |
Maddox | Hobbs, NM | 699.8 GWh | 40.6 mi |
Mustang Station | Denver City, TX | 2.2 TWh | 35.7 mi |
Mustang Station Unit 4 | Denver City, TX | 853.8 GWh | 35.8 mi |
N. Mary Francis | Odessa, TX | 782.0 MWh | 39.8 mi |
Notrees Windpower Hybrid | Goldsmith, TX | 232.8 GWh | 33.4 mi |
Oxy Renewable Energy - Goldsmith | Goldsmith, TX | 42.7 GWh | 31.8 mi |
Prospero Solar | Andrews, TX | 747.8 GWh | 15.4 mi |
Prospero Solar II | Andrews, TX | 675.0 GWh | 16.2 mi |
SPS1 Dollarhide | Jal, NM | 22.1 GWh | 35.6 mi |
SPS2 Jal | Jal, NM | 18.9 GWh | 35.4 mi |
SPS3 Lea | Eunice, NM | 23.0 GWh | 37.9 mi |
SPS4 Monument | Monument, NM | 22.3 GWh | 39.8 mi |
Tumbleweed | Andrews, TX | 903.0 MWh | 10.1 mi |
Wasson CO2 Removal Plant | Denver City, TX | 137.2 GWh | 38.3 mi |