Lapetus
7351 Northwest 2001, Andrews, TX 79714Plant Summary Information
Lapetus is ranked #86 out of 178 solar farms in Texas in terms of total annual net electricity generation.
Lapetus generated 44.2 GWh during the 3-month period between September 2024 to December 2024.
Plant Name | Lapetus |
---|---|
Utility Name | Duke Energy Renewables Services |
Location | Andrews County, TX |
Initial Operation Date | December 2019 |
Last Update | Dec 2024 |
Annual Generation | 193.3 GWh |
Annual Consumption | 694.8 k MMBtu |
Ranked #2,386 out of 11,949 Power Plants Nationwide | |
Ranked #307 out of 5,739 Solar Power Plants Nationwide | |
Ranked #412 out of 769 Texas Power Plants | |
Ranked #86 out of 178 Texas Solar Power Plants | |
Fuel Types | Solar |
Previous Operator |
Lapetus Energy Project LLC (2018 to 2021) Duke Energy Renewables Services (2022 to 2023) |
Map of Lapetus
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Lapetus.
Monthly Net Generation for Lapetus
Lapetus Details
Summary Information | |
---|---|
Plant Name | Lapetus (62448) |
Plant Address | 7351 Northwest 2001, Andrews, TX 79714 |
Utility | Duke Energy Renewables Services (65411) |
Latitude, Longitude | 32.46005, -102.67281 |
Generation Dates on File | Dec 2019 to Dec 2024 |
Initial Operation Date | December 2019 |
Annual Generation | 193.3 GWh |
Fuel Types | Solar |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | TRE |
Balancing Authority | Electric Reliability Council of Texas, Inc. (ERCO) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | |
Ash Impoundment | |
Transmission / Distribution Owner | Oncor Electric Delivery Company LLC (44372) TX |
Grid Voltage | 138.00 kV |
Energy Storage | No |
Generator LAP Details Operating December 2019
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Wholly Owned by Other Entity |
Nameplate Capacity | 100 MW |
Summer Capacity | 100 MW |
Winter Capacity | 100 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | December 2019 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Solar |
Solar Details | |
Single Axis Tracking | Yes |
---|---|
Azimuth Angle | 180 |
DC Net Capacity | 133 MW |
Crystalline Silicon | Yes |
Net Metering Agreement | No |
Virtual Net Metering Agreement | No |
Lapetus Plant Owners
Owner Name | Address | Ownership |
---|---|---|
Lapetus Energy Project, LLC | 550 S. Caldwell Street, NAS09, Suite 925, Charlotte, NC 28202 | 100.00% |
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#297 | Pioneer Solar (CO), LLC | Bennett, CO | 197.7 GWh |
#298 | Desert Harvest, LLC | Desert Center, CA | 197.2 GWh |
#299 | Coniglio Solar | Wolfe City, TX | 197.1 GWh |
#300 | Badger Hollow I | Montfort, WI | 197.1 GWh |
#301 | OCI Alamo 5 LLC | Uvalde, TX | 197.1 GWh |
#302 | Old 300 Solar Center, LLC | Needville, TX | 196.7 GWh |
#303 | Lamesa Solar | Lamesa, TX | 196.2 GWh |
#304 | BPL Sol Solar LLC | Chilton, TX | 194.4 GWh |
#305 | Grant County | Town of Potosi, WI | 194.2 GWh |
#306 | Orion I Solar Project | Burlington, TX | 193.4 GWh |
#308 | Solverde 1 | Lancaster, CA | 193.2 GWh |
#309 | Graphite Solar I | Wellington, UT | 193.1 GWh |
#310 | Robins Air Force Base Solar | Macon, GA | 192.0 GWh |
#311 | Red Mesa Solar Project | Red Mesa, UT | 191.7 GWh |
#312 | Arche Energy Project, LLC | Fulton, OH | 190.6 GWh |
#313 | Rocket Solar, LLC | Corinne, UT | 190.3 GWh |
#314 | Utah Red Hills Renewable Energy Park | Parowan, UT | 189.8 GWh |
#315 | Bell Ridge Solar | Trenton, FL | 189.5 GWh |
#316 | White Pine Solar, LLC | Butler, GA | 188.2 GWh |
#317 | Aulander Holloman Solar, LLC | Aulander, NC | 187.5 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Lapetus.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
2W Permian Solar Project Hybrid | Andrews, TX | 908.4 GWh | 25.2 mi |
Bakke | Andrews, TX | 877.0 MWh | 13.7 mi |
Ector County Energy Center | Goldsmith, TX | 425.6 GWh | 27.5 mi |
Frankel | Andrews, TX | 645.0 MWh | 8.4 mi |
Goldsmith | Goldsmith, TX | 670.0 MWh | 33.6 mi |
Jumbo Hill Wind Project | Andrews, TX | 593.8 GWh | 16.9 mi |
Maddox | Hobbs, NM | 643.9 GWh | 40.6 mi |
Mustang Station | Denver City, TX | 2.3 TWh | 35.7 mi |
Mustang Station Unit 4 | Denver City, TX | 853.8 GWh | 35.8 mi |
N. Mary Francis | Odessa, TX | 782.0 MWh | 39.8 mi |
Notrees Windpower Hybrid | Goldsmith, TX | 260.5 GWh | 33.4 mi |
Oxy Renewable Energy - Goldsmith | Goldsmith, TX | 42.7 GWh | 31.8 mi |
Prospero Solar | Andrews, TX | 752.7 GWh | 15.4 mi |
Prospero Solar II | Andrews, TX | 680.6 GWh | 16.2 mi |
SPS1 Dollarhide | Jal, NM | 22.1 GWh | 35.6 mi |
SPS2 Jal | Jal, NM | 18.9 GWh | 35.4 mi |
SPS3 Lea | Eunice, NM | 23.0 GWh | 37.9 mi |
SPS4 Monument | Monument, NM | 22.3 GWh | 39.8 mi |
Tumbleweed | Andrews, TX | 903.0 MWh | 10.1 mi |
Wasson CO2 Removal Plant | Denver City, TX | 137.2 GWh | 38.3 mi |