Lane II Solar, LLC
785 Old Smithfield Rd, Goldsboro, NC 27530Plant Summary Information
Lane II Solar, LLC is ranked #125 out of 748 solar farms in North Carolina in terms of total annual net electricity generation.
Lane II Solar, LLC generated 2.4 GWh during the 3-month period between September 2023 to December 2023.
Plant Name | Lane II Solar, LLC |
---|---|
Utility Name | USF Essex Lessor, LLC |
Location | Wayne County, NC |
Initial Operation Date | July 2020 |
Last Update | Dec 2023 |
Annual Generation | 10.4 GWh |
Annual Consumption | 37.2 k MMBtu |
Ranked #5,853 out of 11,852 Power Plants Nationwide | |
Ranked #1,497 out of 5,655 Solar Power Plants Nationwide | |
Ranked #196 out of 863 North Carolina Power Plants | |
Ranked #125 out of 748 North Carolina Solar Power Plants | |
Fuel Types | Solar |
Previous Operator |
NES Olympos (2019 to 2022) USF Essex Lessor, LLC (2023 to 2023) |
Map of Lane II Solar, LLC
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Lane II Solar, LLC.
Monthly Net Generation for Lane II Solar, LLC
Lane II Solar, LLC Details
Summary Information | |
---|---|
Plant Name | Lane II Solar, LLC (63837) |
Plant Address | 785 Old Smithfield Rd, Goldsboro, NC 27530 |
Utility | USF Essex Lessor, LLC (66041) |
Latitude, Longitude | 35.39977, -78.05327 |
Generation Dates on File | Jul 2020 to Dec 2023 |
Initial Operation Date | July 2020 |
Annual Generation | 10.4 GWh |
Fuel Types | Solar |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | Yes |
FERC Small Power Producer Docket Number | 16-442-003 |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | SERC |
Balancing Authority | Duke Energy Progress East (CPLE) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | |
Ash Impoundment | No |
Transmission / Distribution Owner | Duke Energy Progress - (NC) (3046) NC |
Grid Voltage | 23.00 kV |
Energy Storage | No |
Generator PV1 Details Operating July 2020
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Wholly Owned by Other Entity |
Nameplate Capacity | 4.9 MW |
Summer Capacity | 4.9 MW |
Winter Capacity | 4.9 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | July 2020 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Solar |
Solid Fuel Gasification | No |
Solar Details | |
Fixed Tilt | Yes |
---|---|
Azimuth Angle | 180 |
Tilt Angle | 20 |
DC Net Capacity | 7.5 MW |
Thin Film CIGS | Yes |
Thin Film Other | No |
Net Metering Agreement | No |
Virtual Net Metering Agreement | No |
Lane II Solar, LLC Plant Owners
Owner Name | Address | Ownership |
---|---|---|
New Energy Solar | 276 5th Avenue, Suite 805, New York, NY 10001 | 100.00% |
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#1487 | Dunstable Solar 1, LLC | Dunstable, MA | 10.5 GWh |
#1488 | Mill Pond Solar, LLC | Jamesville, NC | 10.5 GWh |
#1489 | Wedge | Goldsboro, NC | 10.5 GWh |
#1490 | SoINCPower6, LLC | Sunbury, NC | 10.5 GWh |
#1491 | Brainerd Airport | Brainerd, MN | 10.4 GWh |
#1492 | Selmer II | Selmer, TN | 10.4 GWh |
#1493 | Beaker | Farmville, NC | 10.4 GWh |
#1494 | Hickory | Rose Hill, NC | 10.4 GWh |
#1495 | West Pemberton | Pemberton Twp, NJ | 10.4 GWh |
#1496 | Windsor Hwy 17 Solar | Windsor, NC | 10.4 GWh |
#1498 | Penstemon Solar Project | Ellensburg, WA | 10.4 GWh |
#1499 | Omtanke Solar | Ridgeville, SC | 10.4 GWh |
#1500 | Harrison Solar, LLC | Roseboro, NC | 10.4 GWh |
#1501 | BRE NC Solar 3 | Oxford, NC | 10.3 GWh |
#1502 | MCRD Parris Island PV Hybrid | Parris Island, SC | 31.5 GWh |
#1503 | SunE CPS3 LLC | Somerset, TX | 10.3 GWh |
#1504 | OCI Alamo 3 LLC | San Antonio, TX | 10.3 GWh |
#1505 | Camas Solar Project | Ellensburg, WA | 10.3 GWh |
#1506 | SR Greenville I | Limestone, TN | 10.3 GWh |
#1507 | Organ Church Solar | Rockwell, NC | 10.3 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Lane II Solar, LLC.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
AM Best Farm | Goldsboro, NC | 8.9 GWh | 4 mi |
Blueberry One | Grantham, NC | 9.3 GWh | 8.2 mi |
Cookstown | Goldsboro, NC | 9.8 GWh | 5.2 mi |
Highwater Solar I | Stoney Creek, NC | 9.6 GWh | 4.3 mi |
Jester Solar | Goldsboro, NC | 9.7 GWh | 9.8 mi |
Lane Solar | Goldsboro, NC | 9.7 GWh | 0.4 mi |
Lee Combined Cycle Plant | Goldsboro, NC | 6.6 TWh | 2.7 mi |
Millers Chapel Solar | La Grange, NC | 9.7 GWh | 9.2 mi |
Oakwood Solar | Mebane, NC | 9.5 GWh | 7.1 mi |
Overman Solar | Goldsboro, NC | 10.9 GWh | 7.1 mi |
Pikeville Farm | Pikeville, NC | 9.7 GWh | 6.8 mi |
Ramp Solar, LLC | Goldsboro, NC | 3.8 GWh | 7.7 mi |
Robin Solar | Dudley, NC | 8.1 GWh | 9.5 mi |
Rosewood Solar | Goldsboro, NC | 3.9 GWh | 4 mi |
Ruskin Solar | Dudley, NC | 3.9 GWh | 8.9 mi |
Suncaster, LLC | Pikeville, NC | 3.7 GWh | 8.6 mi |
Terreva Wayne County RNG, LLC | Dudley, NC | 8.2 GWh | 7.7 mi |
Wayne County | Goldsboro, NC | 90.7 GWh | 3 mi |
Wayne Solar II LLC | Goldsboro, NC | 5.9 GWh | 6 mi |
Wedge | Goldsboro, NC | 10.5 GWh | 7.6 mi |