Lamar Power Project
3205 FM 137, Paris, TX 75462Plant Summary Information
Lamar Power Project is ranked #19 out of 754 power plants in Texas in terms of total annual net electricity generation.
Lamar Power Project is comprised of 6 generators and generated 1.9 TWh during the 3-month period between June 2024 to September 2024.
Plant Name | Lamar Power Project |
---|---|
Utility Name | LaFrontera Holdings LLC |
Location | Lamar County, TX |
Initial Operation Date | May 2000 |
Last Update | Sep 2024 |
Annual Generation | 5.7 TWh |
Annual Consumption | 44.3 M MMBtu |
Ranked #172 out of 11,852 Power Plants Nationwide | |
Ranked #80 out of 2,254 Natural Gas Power Plants Nationwide | |
Ranked #19 out of 754 Texas Power Plants | |
Ranked #12 out of 304 Texas Natural Gas Power Plants | |
Fuel Types | Natural Gas |
Previous Operator |
Lamar Power Partners LP (2013 to 2015) LaFrontera Holdings LLC (2016 to 2023) |
Map of Lamar Power Project
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Lamar Power Project.
Monthly Net Generation for Lamar Power Project
Lamar Power Project Details
Summary Information | |
---|---|
Plant Name | Lamar Power Project (55097) |
Plant Address | 3205 FM 137, Paris, TX 75462 |
Utility | LaFrontera Holdings LLC (60477) |
Latitude, Longitude | 33.6308, -95.59 |
Generation Dates on File | Jan 2001 to Sep 2024 |
Initial Operation Date | May 2000 |
Annual Generation | 5.7 TWh |
Fuel Types | Natural Gas |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | Yes |
FERC Exempt Wholesale Generator Docket Number | 99-119-000 |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | TRE |
Balancing Authority | Electric Reliability Council of Texas, Inc. (ERCO) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | Lake Pat Mayse |
Ash Impoundment | No |
Transmission / Distribution Owner | Oncor Electric Delivery Company LLC (44372) TX |
Grid Voltage | 345.00 kV |
Energy Storage | No |
Natural Gas Information | |
Pipeline Name | KINDER MORGAN NORTH TEXAS PL |
Natural Gas Storage | No |
Liquefied Natural Gas Storage | No |
Generator CTG3 Details Operating December 2000
Technology | Natural Gas Fired Combined Cycle |
---|---|
Prime Mover | Combined Cycle Combustion Turbine Part |
Unit Code | BLK2 |
Ownership | Single Owner |
Can Bypass Heat Recovery Steam Generator | No |
RTO ISO LMP Node Designation | LPCCS_UNIT2 |
Nameplate Capacity | 176 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 145 MW |
Winter Capacity | 178 MW |
Minimum Load | 90 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | December 2000 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 12H |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator CTG4 Details Operating December 2000
Technology | Natural Gas Fired Combined Cycle |
---|---|
Prime Mover | Combined Cycle Combustion Turbine Part |
Unit Code | BLK2 |
Ownership | Single Owner |
Can Bypass Heat Recovery Steam Generator | No |
RTO ISO LMP Node Designation | LPCCS_UNIT2 |
Nameplate Capacity | 176 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 153 MW |
Winter Capacity | 186 MW |
Minimum Load | 90 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | December 2000 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 12H |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator CTG1 Details Operating May 2000
Technology | Natural Gas Fired Combined Cycle |
---|---|
Prime Mover | Combined Cycle Combustion Turbine Part |
Unit Code | BLK1 |
Ownership | Single Owner |
Can Bypass Heat Recovery Steam Generator | No |
RTO ISO LMP Node Designation | LPCCS_UNIT1 |
Nameplate Capacity | 176 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 153 MW |
Winter Capacity | 186 MW |
Minimum Load | 90 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | May 2000 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 12H |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator CTG2 Details Operating May 2000
Technology | Natural Gas Fired Combined Cycle |
---|---|
Prime Mover | Combined Cycle Combustion Turbine Part |
Unit Code | BLK1 |
Ownership | Single Owner |
Can Bypass Heat Recovery Steam Generator | No |
RTO ISO LMP Node Designation | LPCCS_UNIT1 |
Nameplate Capacity | 176 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 145 MW |
Winter Capacity | 178 MW |
Minimum Load | 90 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | May 2000 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 12H |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator STG1 Details Operating May 2000
Technology | Natural Gas Fired Combined Cycle |
---|---|
Prime Mover | Combined Cycle Steam Part |
Unit Code | BLK1 |
Ownership | Single Owner |
Duct Burners | Yes |
RTO ISO LMP Node Designation | LPCCS_UNIT1 |
Nameplate Capacity | 204.3 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 204 MW |
Winter Capacity | 204 MW |
Minimum Load | 65 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | May 2000 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 12H |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator STG2 Details Operating May 2000
Technology | Natural Gas Fired Combined Cycle |
---|---|
Prime Mover | Combined Cycle Steam Part |
Unit Code | BLK2 |
Ownership | Single Owner |
Duct Burners | Yes |
RTO ISO LMP Node Designation | LPCCS_UNIT2 |
Nameplate Capacity | 204.3 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 204 MW |
Winter Capacity | 204 MW |
Minimum Load | 65 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | May 2000 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 12H |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Lamar Power Project Plant Owners
Owner Name | Address | Generator | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Natural Gas.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#70 | Midlothian Energy Facility | Midlothian, TX | 6.0 TWh |
#71 | Santan | Gilbert, AZ | 6.0 TWh |
#72 | Hamilton Liberty | Towanda, PA | 6.0 TWh |
#73 | Taft Cogeneration Facility | Hahnville, LA | 6.0 TWh |
#74 | Lake Charles Power | West Lake, LA | 5.9 TWh |
#75 | Lake Side Power Plant | Vineyard, UT | 5.9 TWh |
#76 | Polk | Mulberry, FL | 5.8 TWh |
#77 | Linden Cogen Plant | Linden, NJ | 5.8 TWh |
#78 | Doswell Energy Center | Ashland, VA | 5.8 TWh |
#79 | W S Lee | Williamston, SC | 5.7 TWh |
#81 | Lake Road Generating Plant | Dayville, CT | 5.7 TWh |
#82 | Hickory Run Energy Station | New Castle, PA | 5.7 TWh |
#83 | E B Harris Electric Generating Plant | Autaugaville, AL | 5.7 TWh |
#84 | Oneta Energy Center | Broken Arrow, OK | 5.7 TWh |
#85 | Cottonwood Energy Project | Deweyville, TX | 5.6 TWh |
#86 | St Joseph Energy Center | New Carlisle, IN | 5.6 TWh |
#87 | Channelview Cogeneration Plant | Channelview, TX | 5.6 TWh |
#88 | Choctaw County | French Camp, MS | 5.6 TWh |
#89 | Sithe Independence Station | Oswego, NY | 5.6 TWh |
#90 | Zeeland Generating Station | Zeeland, MI | 5.6 TWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Lamar Power Project.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Butterfield Solar Farm | Durant, OK | 10.7 GWh | 53.8 mi |
Chisum | Blossom, TX | 21.9 GWh | 11.5 mi |
Choctaw Nation Solar Farm | Calera, OK | 9.7 GWh | 53.8 mi |
Coniglio Solar | Wolfe City, TX | 197.8 GWh | 32.4 mi |
Denison | Denison, TX | 112.9 GWh | 57.7 mi |
Eiffel Solar Project | Paris, TX | 521.6 GWh | 4.3 mi |
G.S.E. One LLC | Bonham, TX | 164.3 GWh | 33.3 mi |
Hopkins Energy LLC | Dike, TX | 180.3 GWh | 29.5 mi |
Hugo | Fort Towson, OK | 1.2 TWh | 30.8 mi |
Impact Solar 1 | Deport, TX | 353.3 GWh | 16.9 mi |
International Paper Valliant OK | Valliant, OK | 450.2 GWh | 37.3 mi |
Leon Solar | Greenville, TX | 20.8 GWh | 49.6 mi |
Mockingbird Solar Center | Brookston, TX | 80.1 GWh | 19.1 mi |
Paris Energy Center | Paris, TX | 858.7 GWh | 4.9 mi |
Powerlane Plant | Greenville, TX | 62.4 GWh | 44.4 mi |
Samson Solar Energy | Cunningham, TX | 395.2 GWh | 34.8 mi |
Samson Solar Energy III LLC | Cunningham, TX | 280.3 GWh | 19.5 mi |
Sterling Solar (TX) | Greenville, TX | 16.7 GWh | 46.5 mi |
Welsh | Pittsburg, TX | 3.9 TWh | 58.8 mi |
Whitewright Solar | Whitewright, TX | 20.2 GWh | 46.3 mi |