Laho Solar Plant is ranked #38 out of 51 solar farms in Utah in terms of total annual net electricity generation.

Laho Solar Plant generated 1.4 GWh during the 3-month period between September 2023 to December 2023.

Plant NameLaho Solar Plant
Utility NameMN8 Energy LLC
LocationBeaver County, UT
Initial Operation DateJuly 2015
Last Update Dec 2023
Annual Generation 6.1 GWh
Annual Consumption 21.7 k MMBtu
Ranked #7,228 out of 11,852 Power Plants Nationwide
Ranked #2,496 out of 5,655 Solar Power Plants Nationwide
Ranked #89 out of 121 Utah Power Plants
Ranked #38 out of 51 Utah Solar Power Plants
Fuel Types Solar
Previous Operators First Wind O&M, LLC (2013 to 2019)
Goldman Sachs Renewable Power Group (2020 to 2020)
Goldman Sachs Renewable Power LLC (2021 to 2021)
MN8 Energy LLC (2022 to 2023)

Map of Laho Solar Plant

Full Screen Map

Register Now for Comprehensive Access

Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Laho Solar Plant.

Create Your Account Today

Monthly Net Generation for Laho Solar Plant

Laho Solar Plant Details

Summary Information
Plant NameLaho Solar Plant (58602)
Plant Address1055 West 6100 South, Milford, UT 84751
UtilityMN8 Energy LLC (61944)
Latitude, Longitude38.29139, -113.03556
Generation Dates on FileJan 2016 to Dec 2023
Initial Operation DateJuly 2015
Annual Generation 6.1 GWh
Fuel Types Solar
 
Federal Energy Regulatory Commission (FERC) Information
FERC Cogeneration StatusNo
FERC Small Power Producer StatusYes
FERC Small Power Producer Docket Number14-798-000
FERC Exempt Wholesale Generator StatusNo
Regulatory Information
Regulatory StatusNon-Regulated
NERC RegionWECC
Balancing AuthorityPacifiCorp - East (PACE)
NAICS CodeUtilities (22)
Sector IPP Non-CHP (2)
Water Source
Ash Impoundment No
Transmission / Distribution OwnerPacifiCorp (14354) UT
Grid Voltage 12.50 kV
Energy StorageNo

Generator LSP1 Details Operating July 2015

TechnologySolar Photovoltaic
Prime MoverPhotovoltaic
OwnershipSingle Owner
Nameplate Capacity3 MW
Summer Capacity3 MW
Winter Capacity3 MW
Uprate/Derate Completed No
StatusOperating
First Operation DateJuly 2015
Combined Heat & Power No
Sector NameIPP Non-CHP (2)
Energy SourceSolar
Solid Fuel Gasification No
Carbon Capture TechnologyNo
Solar Details
Fixed TiltYes
Azimuth Angle180
Tilt Angle30
DC Net Capacity3.4 MW
Crystalline SiliconYes
Net Metering AgreementNo
Virtual Net Metering AgreementNo

Laho Solar Plant Plant Owners

Owner NameAddressOwnership
We couldn't locate any owners for this plant

Power Plants with Similar Net Generation

Power plants with a similar annual net generation from Solar.

RankPlant NamePlant LocationAnnual Generation
#2486RE Dillard 1 LLCSloughhouse, CA6.2 GWh
#2487Stromland SolarCochrane, WI6.2 GWh
#2488ZPD-PT Solar Project 2017-006 LLC HybridWarren, MA6.1 GWh
#2489BD Solar Hancock LLCAugusta, ME6.2 GWh
#2490Great Divide Solar, LLCCanyon Creek, MT6.2 GWh
#2491Leggett Solar, LLCLeggett, NC6.2 GWh
#2492Sunpin BlandfordSouthwick, MA6.2 GWh
#2493Sweet Tea Solar, LLCNew Bern, NC6.2 GWh
#2494Springfield Solar PVSpringfield, MA6.2 GWh
#2495Stanford Campus SolarStanford, CA6.1 GWh
#2497Blackhorse Farm Solar, LLC CSGWarren, RI6.1 GWh
#2498Beryl Solar PlantBeryl, UT6.1 GWh
#2499Garnet Solar Generation Station I LLCPalm Springs, CA6.1 GWh
#2500Moncure Farm LLCMoncure, NC6.1 GWh
#2501CSUF TrigenerationFullerton, CA34.7 GWh
#2502NLP GrangerValley Center, CA6.1 GWh
#2503Milford Flat Solar PlantMilford, UT6.1 GWh
#2504Fitchburg RenewablesFitchburg, MA6.1 GWh
#2505TWE New Bern Solar Project, LLCNew Bern, NC6.1 GWh
#2506Brush Solar CenterUnity, OR6.1 GWh

Nearby Power Plants

Below are closest 20 power plants surrounding Laho Solar Plant.

Plant NamePlant LocationAnnual GenerationDistance
Appaloosa Solar ICedar City, UT132.2 GWh31.7 mi
Blue Mountain BiogasMilford, UT12.0 MWh16.4 mi
BlundellMilford, UT248.2 GWh16.8 mi
Buckhorn Solar PlantParagonah, UT5.8 GWh24.8 mi
Enel Cove FortCove Fort, UT155.0 GWh30.8 mi
Escalante Solar I, LLCMilford, UT212.8 GWh16.1 mi
Escalante Solar II, LLCMilford, UT213.5 GWh14.5 mi
Escalante Solar III, LLCMilford, UT210.4 GWh14.5 mi
Granite Peak Solar PlantMilford, UT6.1 GWh8.1 mi
Greenville Solar PlantMilford, UT4.3 GWh16.4 mi
Milford 2Milford, UT6.5 GWh7.1 mi
Milford Flat Solar PlantMilford, UT6.1 GWh1.5 mi
Milford Solar 1Milford, UT257.2 GWh13.8 mi
Milford Wind Corridor I LLCMilford, UT337.9 GWh17.7 mi
Milford Wind Corridor Stage II LLCMilford, UT158.5 GWh21.1 mi
Smithfield 3Milford, UT2.0 GWh6 mi
South Milford Solar PlantMilford, UT7.1 GWh1.7 mi
Thermo No 1Milford, UT54.8 GWh12.5 mi
Upper BeaverBeaver, UT10.2 GWh30.1 mi
Utah Red Hills Renewable Energy ParkParowan, UT189.8 GWh29.1 mi