Laho Solar Plant

1055 West 6100 South, Milford, UT 84751

Plant Summary Information

Laho Solar Plant is ranked #38 out of 51 solar farms in Utah in terms of total annual net electricity generation.

Laho Solar Plant generated 1.4 GWh during the 3-month period between September 2023 to December 2023.

Plant NameLaho Solar Plant
Utility NameMN8 Energy LLC
LocationBeaver County, UT
Initial Operation DateJuly 2015
Last Update Dec 2023
Annual Generation 6.1 GWh
Annual Consumption 21.7 k MMBtu
Ranked #7,219 out of 11,835 Power Plants Nationwide
Ranked #2,488 out of 5,643 Solar Power Plants Nationwide
Ranked #89 out of 121 Utah Power Plants
Ranked #38 out of 51 Utah Solar Power Plants
Fuel Types Solar
Previous Operators First Wind O&M, LLC (2013 to 2019)
Goldman Sachs Renewable Power Group (2020 to 2020)
Goldman Sachs Renewable Power LLC (2021 to 2021)
MN8 Energy LLC (2022 to 2023)

Map of Laho Solar Plant

Full Screen Map

Register Now for Comprehensive Access

Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Laho Solar Plant.

Create Your Account Today

Monthly Net Generation for Laho Solar Plant

Laho Solar Plant Details

Summary Information
Plant NameLaho Solar Plant (58602)
Plant Address1055 West 6100 South, Milford, UT 84751
UtilityMN8 Energy LLC (61944)
Latitude, Longitude38.29139, -113.03556
Generation Dates on FileJan 2016 to Dec 2023
Initial Operation DateJuly 2015
Annual Generation 6.1 GWh
Fuel Types Solar
 
Federal Energy Regulatory Commission (FERC) Information
FERC Cogeneration StatusNo
FERC Small Power Producer StatusYes
FERC Small Power Producer Docket Number14-798-000
FERC Exempt Wholesale Generator StatusNo
Regulatory Information
Regulatory StatusNon-Regulated
NERC RegionWECC
Balancing AuthorityPacifiCorp - East (PACE)
NAICS CodeUtilities (22)
Sector IPP Non-CHP (2)
Water Source
Ash Impoundment No
Transmission / Distribution OwnerPacifiCorp (14354) UT
Grid Voltage 12.50 kV
Energy StorageNo

Generator LSP1 Details Operating July 2015

TechnologySolar Photovoltaic
Prime MoverPhotovoltaic
OwnershipSingle Owner
Nameplate Capacity3 MW
Summer Capacity3 MW
Winter Capacity3 MW
Uprate/Derate Completed No
StatusOperating
First Operation DateJuly 2015
Combined Heat & Power No
Sector NameIPP Non-CHP (2)
Energy SourceSolar
Solid Fuel Gasification No
Carbon Capture TechnologyNo
Solar Details
Fixed TiltYes
Azimuth Angle180
Tilt Angle30
DC Net Capacity3.4 MW
Crystalline SiliconYes
Net Metering AgreementNo
Virtual Net Metering AgreementNo

Laho Solar Plant Plant Owners

Owner NameAddressOwnership
We couldn't locate any owners for this plant

Power Plants with Similar Net Generation

Power plants with a similar annual net generation from Solar.

RankPlant NamePlant LocationAnnual Generation
#2478RE Dillard 1 LLCSloughhouse, CA6.2 GWh
#2479Stromland SolarCochrane, WI6.2 GWh
#2480ZPD-PT Solar Project 2017-006 LLC HybridWarren, MA6.1 GWh
#2481BD Solar Hancock LLCAugusta, ME6.2 GWh
#2482Leggett Solar, LLCLeggett, NC6.2 GWh
#2483Great Divide Solar, LLCCanyon Creek, MT6.2 GWh
#2484Sunpin BlandfordSouthwick, MA6.2 GWh
#2485Sweet Tea Solar, LLCNew Bern, NC6.2 GWh
#2486Springfield Solar PVSpringfield, MA6.2 GWh
#2487Stanford Campus SolarStanford, CA6.1 GWh
#2489Blackhorse Farm Solar, LLC CSGWarren, RI6.1 GWh
#2490Beryl Solar PlantBeryl, UT6.1 GWh
#2491Garnet Solar Generation Station I LLCPalm Springs, CA6.1 GWh
#2492Moncure Farm LLCMoncure, NC6.1 GWh
#2493NLP GrangerValley Center, CA6.1 GWh
#2494Milford Flat Solar PlantMilford, UT6.1 GWh
#2495Fitchburg RenewablesFitchburg, MA6.1 GWh
#2496TWE New Bern Solar Project, LLCNew Bern, NC6.1 GWh
#2497Brush Solar CenterUnity, OR6.1 GWh
#2498Chambers Road SolarBig Flats, NY6.1 GWh

Nearby Power Plants

Below are closest 20 power plants surrounding Laho Solar Plant.

Plant NamePlant LocationAnnual GenerationDistance
Appaloosa Solar ICedar City, UT122.6 GWh31.7 mi
Blue Mountain BiogasMilford, UT12.0 MWh16.4 mi
BlundellMilford, UT248.2 GWh16.8 mi
Buckhorn Solar PlantParagonah, UT5.8 GWh24.8 mi
Enel Cove FortCove Fort, UT155.0 GWh30.8 mi
Escalante Solar I, LLCMilford, UT212.6 GWh16.1 mi
Escalante Solar II, LLCMilford, UT212.9 GWh14.5 mi
Escalante Solar III, LLCMilford, UT209.7 GWh14.5 mi
Granite Peak Solar PlantMilford, UT6.1 GWh8.1 mi
Greenville Solar PlantMilford, UT4.3 GWh16.4 mi
Milford 2Milford, UT6.5 GWh7.1 mi
Milford Flat Solar PlantMilford, UT6.1 GWh1.5 mi
Milford Solar 1Milford, UT260.4 GWh13.8 mi
Milford Wind Corridor I LLCMilford, UT346.0 GWh17.7 mi
Milford Wind Corridor Stage II LLCMilford, UT162.6 GWh21.1 mi
Smithfield 3Milford, UT2.0 GWh6 mi
South Milford Solar PlantMilford, UT7.1 GWh1.7 mi
Thermo No 1Milford, UT54.8 GWh12.5 mi
Upper BeaverBeaver, UT10.2 GWh30.1 mi
Utah Red Hills Renewable Energy ParkParowan, UT189.8 GWh29.1 mi