Lafayette 2 - Internal Services Dept
1100 N Eastern Ave, Los Angeles, CA 90063Plant Summary Information
Lafayette 2 - Internal Services Dept is ranked #552 out of 799 solar farms in California in terms of total annual net electricity generation.
Lafayette 2 - Internal Services Dept generated 484.0 MWh during the 3-month period between September 2023 to December 2023.
Plant Name | Lafayette 2 - Internal Services Dept |
---|---|
Utility Name | MN8 Energy LLC |
Location | Los Angeles County, CA |
Initial Operation Date | August 2020 |
Last Update | Dec 2023 |
Annual Generation | 2.7 GWh |
Annual Consumption | 9.7 k MMBtu |
Ranked #9,214 out of 11,835 Power Plants Nationwide | |
Ranked #4,046 out of 5,643 Solar Power Plants Nationwide | |
Ranked #1,270 out of 1,569 California Power Plants | |
Ranked #552 out of 799 California Solar Power Plants | |
Fuel Types | Solar |
Previous Operators |
GSRP (2019 to 2019) Goldman Sachs Renewable Power Group (2020 to 2020) Goldman Sachs Renewable Power LLC (2021 to 2021) MN8 Energy LLC (2022 to 2023) |
Map of Lafayette 2 - Internal Services Dept
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Lafayette 2 - Internal Services Dept.
Monthly Net Generation for Lafayette 2 - Internal Services Dept
Lafayette 2 - Internal Services Dept Details
Summary Information | |
---|---|
Plant Name | Lafayette 2 - Internal Services Dept (63527) |
Plant Address | 1100 N Eastern Ave, Los Angeles, CA 90063 |
Utility | MN8 Energy LLC (61944) |
Latitude, Longitude | 34.05, -118.18 |
Generation Dates on File | Aug 2020 to Dec 2023 |
Initial Operation Date | August 2020 |
Annual Generation | 2.7 GWh |
Fuel Types | Solar |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | Yes |
FERC Small Power Producer Docket Number | 20-598 |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | WECC |
Balancing Authority | California Independent System Operator (CISO) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | |
Ash Impoundment | |
Transmission / Distribution Owner | Southern California Edison Co (17609) CA |
Grid Voltage | 0.48 kV |
Energy Storage | No |
Generator GEN1 Details Operating August 2020
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Wholly Owned by Other Entity |
Nameplate Capacity | 1.9 MW |
Nameplate Power Factor | 1 |
Summer Capacity | 1.9 MW |
Winter Capacity | 1.9 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | August 2020 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Solar |
Solar Details | |
Single Axis Tracking | Yes |
---|---|
Fixed Tilt | Yes |
Azimuth Angle | 225 |
Tilt Angle | 4.8 |
DC Net Capacity | 2.1 MW |
Crystalline Silicon | Yes |
Net Metering Agreement | No |
Virtual Net Metering Agreement | No |
Lafayette 2 - Internal Services Dept Plant Owners
Owner Name | Address | Ownership |
---|---|---|
Solar Star LA County I, LLC | 750 Park of Commerce Blvd, Boca Raton, FL 33487 | 100.00% |
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#4036 | DG Florham Park Solar LLC | Florham Park, NJ | 2.7 GWh |
#4037 | Steel Sun 2: 2303-III-2 Hamburg Tpke | Lackawanna, NY | 2.7 GWh |
#4038 | RV CSU Power II LLC | Fort Collins, CO | 2.7 GWh |
#4039 | Colleton Solar Farm | Walterboro, SC | 2.7 GWh |
#4040 | Redman North Community Solar | Brockport, NY | 2.7 GWh |
#4041 | Sonora 1 | Jamestown, CA | 2.7 GWh |
#4042 | IMPA Washington Solar Park | Washington, IN | 2.7 GWh |
#4043 | Gore Mountain Solar II | Whitehall, NY | 2.7 GWh |
#4044 | Prudential 80 Livingston Roseland Solar | Roseland, NJ | 2.7 GWh |
#4045 | Jefferson-Lewis BOCES Solar | Watertown, NY | 2.7 GWh |
#4047 | Moonlight Packing - Phase 2 | Reedley, CA | 2.7 GWh |
#4048 | USG 1 | El Centro, CA | 2.7 GWh |
#4049 | Canyon Del Oro High School Solar | Oro Valley, AZ | 2.7 GWh |
#4050 | Ramona Solar Energy | Ramona, CA | 2.7 GWh |
#4051 | Madera 1 PV | Madera, CA | 2.7 GWh |
#4052 | Turner Rd Community Solar Project | Baldwin, NY | 2.7 GWh |
#4053 | Matrix Buildings A&B (Perth Amboy) Solar | Perth Amboy, NJ | 2.7 GWh |
#4054 | SCS West Fairchild 011958 Danville, LLC | Danville, IL | 2.7 GWh |
#4055 | CCBC-Catonsville | Catonsville, MD | 2.7 GWh |
#4056 | Syncarpha Halifax Hybrid CSG | Halifax, MA | 2.7 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Lafayette 2 - Internal Services Dept.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Big Bear | Los Angeles, CA | 7.9 GWh | 2.5 mi |
California Institute of Technology | Pasadena, CA | 45.5 GWh | 6.9 mi |
CalTech - Pasadena | Pasadena, CA | 6.8 GWh | 6.8 mi |
CalTech - Pasadena (PPA) | Pasadena, CA | 5.6 GWh | 7 mi |
CalTech - Pasadena Wilson Ave | Pasadena, CA | 8.3 GWh | 6.8 mi |
Caltech Central | Pasadena, CA | 401.0 MWh | 6.7 mi |
Center Hybrid | Norwalk, CA | 4.3 GWh | 9.4 mi |
Forever 21 Retail, Inc. | Los Angeles, CA | 1.7 GWh | 1.7 mi |
Glenarm | Pasadena, CA | 40.9 GWh | 5.5 mi |
Grayson | Glendale, CA | 35.5 GWh | 9.2 mi |
H. Gonzales | Vernon, CA | 297.9 MWh | 4.3 mi |
Kaiser - LA | Los Angeles, CA | 33.1 GWh | 7.4 mi |
Kaiser Downey | Downey, CA | 5.3 GWh | 9.5 mi |
Malburg | Vernon, CA | 320.2 GWh | 4.3 mi |
Metro Support Services Center Solar | Los Angeles, CA | 479.0 MWh | 2.9 mi |
Occidental College Solar Project | Los Angeles, CA | 1.6 GWh | 5.6 mi |
Puente Hills Energy Recovery | Whittier, CA | 159.0 GWh | 9.1 mi |
Ratkovich Alhambra | Alhambra, CA | 7.8 GWh | 2.7 mi |
Rio Hondo | South Gate, CA | 2.1 GWh | 5.6 mi |
USPS PV | Los Angeles, CA | 10.8 GWh | 6.7 mi |