Kyrene
7005 S Kyrene Rd., Tempe, AZ 85283Plant Summary Information
Kyrene is ranked #23 out of 155 power plants in Arizona in terms of total annual net electricity generation.
Kyrene is comprised of 7 generators and generated 381.5 GWh during the 3-month period between May 2024 to August 2024.
Plant Name | Kyrene |
---|---|
Utility Name | Salt River Project |
Location | Maricopa County, AZ |
Initial Operation Date | July 1952 |
Last Update | Aug 2024 |
Annual Generation | 1.1 TWh |
Annual Consumption | 9.2 M MMBtu |
Ranked #702 out of 11,835 Power Plants Nationwide | |
Ranked #426 out of 2,253 Natural Gas Power Plants Nationwide | |
Ranked #23 out of 155 Arizona Power Plants | |
Ranked #17 out of 34 Arizona Natural Gas Power Plants | |
Fuel Types | Natural Gas |
Map of Kyrene
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Kyrene.
Monthly Net Generation for Kyrene
Kyrene Details
Summary Information | |
---|---|
Plant Name | Kyrene (147) |
Plant Address | 7005 S Kyrene Rd., Tempe, AZ 85283 |
Utility | Salt River Project (16572) |
Latitude, Longitude | 33.3556, -111.9353 |
Generation Dates on File | Jan 2001 to Aug 2024 |
Initial Operation Date | July 1952 |
Annual Generation | 1.1 TWh |
Fuel Types | Natural Gas |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Regulated |
NERC Region | WECC |
Balancing Authority | Salt River Project (SRP) |
NAICS Code | Utilities (22) |
Sector | Electric Utility (1) |
Water Source | Well Water |
Ash Impoundment | No |
Transmission / Distribution Owner | Salt River Project (16572) AZ |
Grid Voltage | 230.00 kV / 69.00 kV |
Energy Storage | No |
Natural Gas Information | |
Pipeline Name |
EL PASO NATURAL GAS COMPANY LLC TRANSWESTERN PIPELINE COMPANY |
Natural Gas Storage | No |
Generator KY1 Details Out of Service July 1952
Technology | Natural Gas Steam Turbine |
---|---|
Prime Mover | Steam Turbine |
Ownership | Single Owner |
Nameplate Capacity | 34.5 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 34 MW |
Winter Capacity | 34 MW |
Minimum Load | 4 MW |
Uprate/Derate Completed | No |
Status | Out of Service |
First Operation Date | July 1952 |
Combined Heat & Power | No |
---|---|
Sector Name | Electric Utility (1) |
Energy Source | Natural Gas / Distillate Fuel Oil |
Startup Source | Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | OVER |
Other Planned Modifications | No |
Multiple Fuels | Yes |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | Yes |
Multifuel Details | |
Switch When Operating | Yes |
---|---|
Net Summer Capacity With Natural Gas | 34 MW |
Net Winter Capacity With Natural Gas | 34 MW |
Net Summer Capacity With Oil | 34 MW |
Net Winter Capacity With Oil | 34 MW |
Time To Switch From Gas To Oil | 1H |
Time To Switch From Oil To Gas | 1H |
Factors That Limit Switching | Yes |
Storage Limits | Yes |
Air Permit Limits | Yes |
Other Limits | Yes |
Generator KY2 Details Out of Service June 1954
Technology | Natural Gas Steam Turbine |
---|---|
Prime Mover | Steam Turbine |
Ownership | Single Owner |
Nameplate Capacity | 73.5 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 72 MW |
Winter Capacity | 72 MW |
Minimum Load | 4 MW |
Uprate/Derate Completed | No |
Status | Out of Service |
First Operation Date | June 1954 |
Combined Heat & Power | No |
---|---|
Sector Name | Electric Utility (1) |
Energy Source | Natural Gas / Distillate Fuel Oil |
Startup Source | Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | OVER |
Other Planned Modifications | No |
Multiple Fuels | Yes |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | Yes |
Multifuel Details | |
Switch When Operating | Yes |
---|---|
Net Summer Capacity With Natural Gas | 72 MW |
Net Winter Capacity With Natural Gas | 72 MW |
Net Summer Capacity With Oil | 72 MW |
Net Winter Capacity With Oil | 72 MW |
Time To Switch From Gas To Oil | 1H |
Time To Switch From Oil To Gas | 1H |
Factors That Limit Switching | Yes |
Storage Limits | Yes |
Air Permit Limits | Yes |
Other Limits | Yes |
Generator KY4 Details Operating December 1971
Technology | Natural Gas Fired Combustion Turbine |
---|---|
Prime Mover | Combustion Turbine |
Ownership | Single Owner |
Nameplate Capacity | 53.1 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 59 MW |
Winter Capacity | 62.5 MW |
Minimum Load | 6 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | December 1971 |
Combined Heat & Power | No |
---|---|
Sector Name | Electric Utility (1) |
Energy Source | Natural Gas / Distillate Fuel Oil |
Startup Source | Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 1H |
Multiple Fuels | Yes |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | Yes |
Multifuel Details | |
Switch When Operating | Yes |
---|---|
Net Summer Capacity With Natural Gas | 59 MW |
Net Winter Capacity With Natural Gas | 62.5 MW |
Net Summer Capacity With Oil | 59 MW |
Net Winter Capacity With Oil | 62.5 MW |
Time To Switch From Gas To Oil | 1H |
Time To Switch From Oil To Gas | 1H |
Factors That Limit Switching | Yes |
Storage Limits | Yes |
Air Permit Limits | Yes |
Other Limits | Yes |
Generator KY6 Details Operating June 1973
Technology | Natural Gas Fired Combustion Turbine |
---|---|
Prime Mover | Combustion Turbine |
Ownership | Single Owner |
Nameplate Capacity | 60.3 MW |
Nameplate Power Factor | 0.9 |
Summer Capacity | 53 MW |
Winter Capacity | 62 MW |
Minimum Load | 6 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | June 1973 |
Combined Heat & Power | No |
---|---|
Sector Name | Electric Utility (1) |
Energy Source | Natural Gas / Distillate Fuel Oil |
Startup Source | Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 1H |
Multiple Fuels | Yes |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | Yes |
Multifuel Details | |
Switch When Operating | Yes |
---|---|
Net Summer Capacity With Natural Gas | 53 MW |
Net Winter Capacity With Natural Gas | 62 MW |
Net Summer Capacity With Oil | 53 MW |
Net Winter Capacity With Oil | 62 MW |
Time To Switch From Gas To Oil | 1H |
Time To Switch From Oil To Gas | 1H |
Factors That Limit Switching | Yes |
Storage Limits | Yes |
Air Permit Limits | Yes |
Other Limits | Yes |
Generator KY5 Details Operating July 1973
Technology | Natural Gas Fired Combustion Turbine |
---|---|
Prime Mover | Combustion Turbine |
Ownership | Single Owner |
Nameplate Capacity | 60.3 MW |
Nameplate Power Factor | 0.9 |
Summer Capacity | 53 MW |
Winter Capacity | 62 MW |
Minimum Load | 6 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | July 1973 |
Combined Heat & Power | No |
---|---|
Sector Name | Electric Utility (1) |
Energy Source | Natural Gas / Distillate Fuel Oil |
Startup Source | Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 1H |
Multiple Fuels | Yes |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | Yes |
Multifuel Details | |
Switch When Operating | Yes |
---|---|
Net Summer Capacity With Natural Gas | 53 MW |
Net Winter Capacity With Natural Gas | 62 MW |
Net Summer Capacity With Oil | 53 MW |
Net Winter Capacity With Oil | 62.5 MW |
Time To Switch From Gas To Oil | 1H |
Time To Switch From Oil To Gas | 1H |
Factors That Limit Switching | Yes |
Storage Limits | Yes |
Air Permit Limits | Yes |
Other Limits | Yes |
Generator KY7 Details Operating October 2002
Technology | Natural Gas Fired Combined Cycle |
---|---|
Prime Mover | Combined Cycle Combustion Turbine Part |
Unit Code | KYS7 |
Ownership | Single Owner |
Can Bypass Heat Recovery Steam Generator | No |
Nameplate Capacity | 170 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 148 MW |
Winter Capacity | 167 MW |
Minimum Load | 90 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | October 2002 |
Combined Heat & Power | No |
---|---|
Sector Name | Electric Utility (1) |
Energy Source | Natural Gas |
Startup Source | Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 12H |
Other Planned Modifications | Yes |
Other Modifications | April 2025 |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator KY7A Details Operating October 2002
Technology | Natural Gas Fired Combined Cycle |
---|---|
Prime Mover | Combined Cycle Steam Part |
Unit Code | KYS7 |
Ownership | Single Owner |
Duct Burners | Yes |
Nameplate Capacity | 122 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 106 MW |
Winter Capacity | 110 MW |
Minimum Load | 90 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | October 2002 |
Combined Heat & Power | No |
---|---|
Sector Name | Electric Utility (1) |
Energy Source | Natural Gas |
Startup Source | Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 12H |
Other Planned Modifications | Yes |
Other Modifications | April 2025 |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Kyrene Plant Owners
Owner Name | Address | Generator | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Natural Gas.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#416 | Panoche Energy Center | Firebaugh, CA | 1.1 TWh |
#417 | Bowline Point | West Haverstraw, NY | 1.1 TWh |
#418 | Shell Deer Park | Deer Park, TX | 1.4 TWh |
#419 | Tiger Bay | Ft. Meade, FL | 1.1 TWh |
#420 | Air Products Port Arthur | Port Arthur, TX | 1.2 TWh |
#421 | Wilkes | Avinger, TX | 1.1 TWh |
#422 | Johnson County | Cleburne, TX | 1.1 TWh |
#423 | West Lorain | Lorain, OH | 1.1 TWh |
#424 | Stryker Creek | Jacksonville, TX | 1.1 TWh |
#425 | Ocean State Power II | Harrisville, RI | 1.1 TWh |
#427 | El Centro Hybrid | El Centro, CA | 1.1 TWh |
#428 | Arthur Kill Generating Station | Staten Island, NY | 1.1 TWh |
#429 | Blythe Energy Inc | Blythe, CA | 1.1 TWh |
#430 | Deer Creek Station | White, SD | 1.1 TWh |
#431 | Michigan Power LP | Ludington, MI | 1.1 TWh |
#432 | Faribault Energy Park | Faribault, MN | 1.1 TWh |
#433 | Salem Harbor Power Development LP | Salem, MA | 1.0 TWh |
#434 | Southwestern | Anadarko, OK | 1.0 TWh |
#435 | Afton Generating Station | La Mesa, NM | 1.0 TWh |
#436 | Gordonsville Energy LP | Gordonsville, VA | 1.1 TWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Kyrene.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Agua Fria | Glendale, AZ | 197.1 GWh | 21.3 mi |
Arizona State University CHP | Tempe, AZ | 43.1 GWh | 4.3 mi |
AZ State University - Tempe Campus Solar | Tempe, AZ | 2.6 GWh | 4.8 mi |
Estrella Mountain PV | Avondale, AZ | 4.2 GWh | 23.7 mi |
Gilbert Solar Facility I, LLC | Gilbert, AZ | 3.6 GWh | 7.7 mi |
Intel - Ocotillo Campus Solar | Chandler, AZ | 10.7 GWh | 8.1 mi |
Jewish Community Center PV | Scottsdale, AZ | 2.0 GWh | 17.1 mi |
Luke Solar | Glendale, AZ | 32.8 GWh | 28.2 mi |
Macys Goodyear | Goodyear, AZ | 3.5 GWh | 27.9 mi |
Mesa Carport PV | Mesa, AZ | 8.1 GWh | 19.2 mi |
Ocotillo | Tempe, AZ | 583.7 GWh | 4.8 mi |
Paradise Valley H.S. PV | Phoenix, AZ | 2.0 GWh | 20.1 mi |
Phoenix Airport East Economy Lot | Phoenix, AZ | 848.0 MWh | 6.1 mi |
Phoenix Airport Rental Car Center | Phoenix, AZ | 2.7 GWh | 8.2 mi |
Queen Creek Solar Farm | Queen Creek, AZ | 46.4 GWh | 19.6 mi |
Santan | Gilbert, AZ | 6.0 TWh | 10.8 mi |
South Consolidated | Phoenix, AZ | 29.0 MWh | 11.7 mi |
Stewart Mountain | Phoenix, AZ | 35.0 GWh | 27.2 mi |
T0588 Phoenix - AZ | Phoenix, AZ | 618.0 MWh | 17.5 mi |
West Phoenix | Phoenix, AZ | 3.4 TWh | 14.2 mi |