Kotzebue Hybrid
245 4th Street, Kotzebue, AK 99752Plant Summary Information
Kotzebue Hybrid is ranked #47 out of 1,262 distillate fuel oil power plants nationwide in terms of total annual net electricity generation.
Kotzebue Hybrid generated 6.4 GWh during the 3-month period between September 2023 to December 2023.
Plant Name | Kotzebue Hybrid |
---|---|
Utility Name | Kotzebue Electric Assn Inc |
Location | Northwest Arctic Borough, AK |
Initial Operation Date | August 1987 |
Last Update | Dec 2023 |
Annual Generation | 24.2 GWh |
Annual Consumption | 201.1 k MMBtu |
Ranked #4,826 out of 11,852 Power Plants Nationwide | |
Ranked #47 out of 1,262 Distillate Fuel Oil Power Plants Nationwide | |
Ranked #35 out of 130 Alaska Power Plants | |
Ranked #7 out of 86 Alaska Distillate Fuel Oil Power Plants | |
Fuel Types | Distillate Fuel Oil : 85.8% Wind : 14.2% |
Map of Kotzebue Hybrid
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Kotzebue Hybrid.
Monthly Net Generation for Kotzebue Hybrid
Kotzebue Hybrid Details
Summary Information | |
---|---|
Plant Name | Kotzebue Hybrid (6304) |
Plant Address | 245 4th Street, Kotzebue, AK 99752 |
Utility | Kotzebue Electric Assn Inc (10451) |
Latitude, Longitude | 66.83778, -162.55694 |
Generation Dates on File | Jan 2001 to Dec 2023 |
Initial Operation Date | August 1987 |
Annual Generation | 24.2 GWh |
Fuel Types | Distillate Fuel Oil : 85.8% Wind : 14.2% |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Regulated |
NERC Region | |
Balancing Authority | () |
NAICS Code | Utilities (22) |
Sector | Electric Utility (1) |
Water Source | |
Ash Impoundment | No |
Transmission / Distribution Owner | Kotzebue Electric Assn Inc (10451) AK |
Grid Voltage | 7.20 kV |
Energy Storage | Yes |
Generator 7A Details Operating August 1987
Technology | Petroleum Liquids |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Single Owner |
Nameplate Capacity | 1.1 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 1.1 MW |
Winter Capacity | 1.1 MW |
Minimum Load | 0.4 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | August 1987 |
---|---|
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Distillate Fuel Oil |
Solid Fuel Gasification | No |
Time From Cold Shutdown To Full Load | 12H |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator 10 Details Operating December 1992
Technology | Petroleum Liquids |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Single Owner |
Nameplate Capacity | 3 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 3 MW |
Winter Capacity | 3 MW |
Minimum Load | 1.5 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | December 1992 |
---|---|
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Distillate Fuel Oil |
Solid Fuel Gasification | No |
Time From Cold Shutdown To Full Load | 12H |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator 14 Details Operating July 1994
Technology | Petroleum Liquids |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Single Owner |
Nameplate Capacity | 2.8 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 2.8 MW |
Winter Capacity | 2.8 MW |
Minimum Load | 1 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | July 1994 |
---|---|
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Distillate Fuel Oil |
Solid Fuel Gasification | No |
Time From Cold Shutdown To Full Load | 12H |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator 3WT Details Operating January 1997
Technology | Onshore Wind Turbine |
---|---|
Prime Mover | Wind Turbine, Onshore |
Ownership | Single Owner |
Nameplate Capacity | 0.2 MW |
Summer Capacity | 0.2 MW |
Winter Capacity | 0.2 MW |
Minimum Load | 0.1 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | January 1997 |
Planned Retirement | May 2026 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Wind |
Solid Fuel Gasification | No |
Turbines/Hydrokinetic Buoys | 3 |
Turbine Details | |
Number Of Turbines | 3 |
---|---|
Predominant Turbine Manufacturer | AOC |
Predominant Turbine Model Number | AOC15/50 |
Design Wind Speed | 13 MPH |
Wind Quality Class | 2 - Medium Wind |
Turbine Hub Height Feet | 90 |
Generator 1WT Details Operating May 1999
Technology | Onshore Wind Turbine |
---|---|
Prime Mover | Wind Turbine, Onshore |
Ownership | Single Owner |
Nameplate Capacity | 0.6 MW |
Summer Capacity | 0.6 MW |
Winter Capacity | 0.6 MW |
Minimum Load | 0.6 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | May 1999 |
Planned Retirement | May 2026 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Wind |
Solid Fuel Gasification | No |
Turbines/Hydrokinetic Buoys | 10 |
Turbine Details | |
Number Of Turbines | 10 |
---|---|
Predominant Turbine Manufacturer | AOC |
Predominant Turbine Model Number | AOC15/50 |
Design Wind Speed | 13 MPH |
Wind Quality Class | 2 - Medium Wind |
Turbine Hub Height Feet | 90 |
Generator 2WT Details Operating May 1999
Technology | Onshore Wind Turbine |
---|---|
Prime Mover | Wind Turbine, Onshore |
Ownership | Single Owner |
Nameplate Capacity | 0.1 MW |
Summer Capacity | 0.1 MW |
Winter Capacity | 0.1 MW |
Minimum Load | 0.1 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | May 1999 |
Planned Retirement | May 2026 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Wind |
Solid Fuel Gasification | No |
Turbines/Hydrokinetic Buoys | 1 |
Turbine Details | |
Number Of Turbines | 1 |
---|---|
Predominant Turbine Manufacturer | AOC |
Predominant Turbine Model Number | AOC15/50 |
Design Wind Speed | 13 MPH |
Wind Quality Class | 2 - Medium Wind |
Turbine Hub Height Feet | 90 |
Generator 14wt Details Operating May 2002
Technology | Onshore Wind Turbine |
---|---|
Prime Mover | Wind Turbine, Onshore |
Ownership | Single Owner |
Nameplate Capacity | 0.1 MW |
Summer Capacity | 0.1 MW |
Winter Capacity | 0.1 MW |
Minimum Load | 0.1 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | May 2002 |
Planned Retirement | May 2026 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Wind |
Solid Fuel Gasification | No |
Turbines/Hydrokinetic Buoys | 1 |
Turbine Details | |
Number Of Turbines | 1 |
---|---|
Predominant Turbine Manufacturer | Northern Power |
Predominant Turbine Model Number | Northwind 100 |
Design Wind Speed | 13 MPH |
Wind Quality Class | 2 - Medium Wind |
Turbine Hub Height Feet | 90 |
Generator 11wt Details Operating May 2005
Technology | Onshore Wind Turbine |
---|---|
Prime Mover | Wind Turbine, Onshore |
Ownership | Single Owner |
Nameplate Capacity | 0.1 MW |
Summer Capacity | 0.1 MW |
Winter Capacity | 0.1 MW |
Minimum Load | 0.1 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | May 2005 |
Planned Retirement | June 2026 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Wind |
Solid Fuel Gasification | No |
Turbines/Hydrokinetic Buoys | 1 |
Turbine Details | |
Number Of Turbines | 1 |
---|---|
Predominant Turbine Manufacturer | AOC |
Predominant Turbine Model Number | AOC15/50 |
Design Wind Speed | 13 MPH |
Wind Quality Class | 2 - Medium Wind |
Turbine Hub Height Feet | 90 |
Generator 15 Details Operating February 2006
Technology | Petroleum Liquids |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Single Owner |
Nameplate Capacity | 2.8 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 2.8 MW |
Winter Capacity | 2.8 MW |
Minimum Load | 1 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | February 2006 |
---|---|
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Distillate Fuel Oil |
Solid Fuel Gasification | No |
Time From Cold Shutdown To Full Load | 12H |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator 13WT Details Operating May 2006
Technology | Onshore Wind Turbine |
---|---|
Prime Mover | Wind Turbine, Onshore |
Ownership | Single Owner |
Nameplate Capacity | 0.1 MW |
Summer Capacity | 0.1 MW |
Winter Capacity | 0.1 MW |
Minimum Load | 0.1 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | May 2006 |
Planned Retirement | May 2026 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Wind |
Solid Fuel Gasification | No |
Turbines/Hydrokinetic Buoys | 1 |
Turbine Details | |
Number Of Turbines | 1 |
---|---|
Predominant Turbine Manufacturer | Vestas |
Predominant Turbine Model Number | V15 |
Design Wind Speed | 13 MPH |
Wind Quality Class | 2 - Medium Wind |
Turbine Hub Height Feet | 90 |
Generator 15WT Details Operating May 2006
Technology | Onshore Wind Turbine |
---|---|
Prime Mover | Wind Turbine, Onshore |
Ownership | Single Owner |
Nameplate Capacity | 0.1 MW |
Summer Capacity | 0.1 MW |
Winter Capacity | 0.1 MW |
Minimum Load | 0.1 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | May 2006 |
Planned Retirement | May 2026 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Wind |
Solid Fuel Gasification | No |
Turbines/Hydrokinetic Buoys | 1 |
Turbine Details | |
Number Of Turbines | 1 |
---|---|
Predominant Turbine Manufacturer | AOC |
Predominant Turbine Model Number | AOC15/50 |
Design Wind Speed | 13 MPH |
Wind Quality Class | 2 - Medium Wind |
Turbine Hub Height Feet | 90 |
Generator 16WT Details Operating May 2006
Technology | Onshore Wind Turbine |
---|---|
Prime Mover | Wind Turbine, Onshore |
Ownership | Single Owner |
Nameplate Capacity | 0.1 MW |
Summer Capacity | 0.1 MW |
Winter Capacity | 0.1 MW |
Minimum Load | 0.1 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | May 2006 |
Planned Retirement | May 2026 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Wind |
Solid Fuel Gasification | No |
Turbines/Hydrokinetic Buoys | 1 |
Turbine Details | |
Number Of Turbines | 1 |
---|---|
Predominant Turbine Manufacturer | AOC |
Predominant Turbine Model Number | AOC15/50 |
Design Wind Speed | 13 MPH |
Wind Quality Class | 2 - Medium Wind |
Turbine Hub Height Feet | 90 |
Generator 17WT Details Operating May 2006
Technology | Onshore Wind Turbine |
---|---|
Prime Mover | Wind Turbine, Onshore |
Ownership | Single Owner |
Nameplate Capacity | 0.1 MW |
Summer Capacity | 0.1 MW |
Winter Capacity | 0.1 MW |
Minimum Load | 0.1 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | May 2006 |
Planned Retirement | May 2026 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Wind |
Turbines/Hydrokinetic Buoys | 1 |
Turbine Details | |
Number Of Turbines | 1 |
---|---|
Predominant Turbine Manufacturer | AOC |
Predominant Turbine Model Number | AOC15/50 |
Design Wind Speed | 13 MPH |
Wind Quality Class | 2 - Medium Wind |
Turbine Hub Height Feet | 90 |
Generator 18WT Details Operating May 2012
Technology | Onshore Wind Turbine |
---|---|
Prime Mover | Wind Turbine, Onshore |
Ownership | Single Owner |
Nameplate Capacity | 0.9 MW |
Summer Capacity | 0.9 MW |
Winter Capacity | 0.9 MW |
Minimum Load | 0.9 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | May 2012 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Wind |
Turbines/Hydrokinetic Buoys | 1 |
Turbine Details | |
Number Of Turbines | 1 |
---|---|
Predominant Turbine Manufacturer | EWT |
Predominant Turbine Model Number | DW54-900 |
Design Wind Speed | 13 MPH |
Wind Quality Class | 2 - Medium Wind |
Turbine Hub Height Feet | 250 |
Generator 19WT Details Operating May 2012
Technology | Onshore Wind Turbine |
---|---|
Prime Mover | Wind Turbine, Onshore |
Ownership | Single Owner |
Nameplate Capacity | 0.9 MW |
Summer Capacity | 0.9 MW |
Winter Capacity | 0.9 MW |
Minimum Load | 0.9 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | May 2012 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Wind |
Turbines/Hydrokinetic Buoys | 1 |
Turbine Details | |
Number Of Turbines | 1 |
---|---|
Predominant Turbine Manufacturer | EWT |
Predominant Turbine Model Number | DW54-900 |
Design Wind Speed | 13 MPH |
Wind Quality Class | 2 - Medium Wind |
Turbine Hub Height Feet | 250 |
Generator 16 Details Operating August 2013
Technology | Petroleum Liquids |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Single Owner |
Nameplate Capacity | 1.4 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 1.4 MW |
Winter Capacity | 1.4 MW |
Minimum Load | 0.6 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | August 2013 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Distillate Fuel Oil |
Solid Fuel Gasification | No |
Time From Cold Shutdown To Full Load | 12H |
Multiple Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator ES1 Details Operating December 2015
Technology | Batteries |
---|---|
Prime Mover | Battery |
Ownership | Single Owner |
Nameplate Capacity | 1.2 MW |
Summer Capacity | 1.2 MW |
Winter Capacity | 1.2 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | December 2015 |
---|---|
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Electricity used for energy storage |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Energy Storage Details | |
Nameplate Energy Capacity MWH | 1 |
---|---|
Maximum Charge Rate | 1.2 MW |
Maximum Discharge Rate | 1.2 MW |
Storage Technology | LIB |
Nameplate Reactive Power Rating | 1.2 |
Storage Enclosure Type | CT |
Frequency Regulation | P |
Load Following | Yes |
Ramping Spinning Reserve | Yes |
Co Located Renewable Firming | Yes |
System Peak Shaving | Yes |
Load Management | Yes |
Backup Power | Yes |
Excess Wind And Solar Generation | Yes |
Ac Coupled | Yes |
Direct Support Of Another Unit | Yes |
Direct Support Plant Id | 6304 |
Support T D Asset | No |
Generator 17 Details Operating May 2016
Technology | Petroleum Liquids |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Single Owner |
Nameplate Capacity | 0.7 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 0.7 MW |
Winter Capacity | 0.7 MW |
Minimum Load | 0.1 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | May 2016 |
---|---|
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Distillate Fuel Oil |
Solid Fuel Gasification | No |
Time From Cold Shutdown To Full Load | 12H |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator PV1 Details Operating July 2020
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Single Owner |
Nameplate Capacity | 0.1 MW |
Summer Capacity | 0.1 MW |
Winter Capacity | 0.1 MW |
Minimum Load | 0.1 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | July 2020 |
Planned Retirement | July 2040 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Solar |
Solar Details | |
Fixed Tilt | Yes |
---|---|
Azimuth Angle | 180 |
Tilt Angle | 45 |
DC Net Capacity | 0.2 MW |
Crystalline Silicon | Yes |
Net Metering Agreement | No |
Virtual Net Metering Agreement | No |
Generator PV2 Details Operating July 2020
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Single Owner |
Nameplate Capacity | 0.1 MW |
Summer Capacity | 0.1 MW |
Winter Capacity | 0.1 MW |
Minimum Load | 0.1 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | July 2020 |
Planned Retirement | July 2040 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Solar |
Solar Details | |
Fixed Tilt | Yes |
---|---|
Azimuth Angle | 180 |
Tilt Angle | 45 |
DC Net Capacity | 0.2 MW |
Crystalline Silicon | Yes |
Net Metering Agreement | No |
Virtual Net Metering Agreement | No |
Generator PV3 Details Operating July 2020
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Single Owner |
Nameplate Capacity | 0.1 MW |
Summer Capacity | 0.1 MW |
Winter Capacity | 0.1 MW |
Minimum Load | 0.1 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | July 2020 |
Planned Retirement | July 2040 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Solar |
Solar Details | |
Fixed Tilt | Yes |
---|---|
Azimuth Angle | 180 |
Tilt Angle | 45 |
DC Net Capacity | 0.2 MW |
Crystalline Silicon | Yes |
Net Metering Agreement | No |
Virtual Net Metering Agreement | No |
Generator PV4 Details Operating July 2020
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Single Owner |
Nameplate Capacity | 0.1 MW |
Summer Capacity | 0.1 MW |
Winter Capacity | 0.1 MW |
Minimum Load | 0.1 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | July 2020 |
Planned Retirement | July 2040 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Solar |
Solar Details | |
Fixed Tilt | Yes |
---|---|
Azimuth Angle | 180 |
Tilt Angle | 45 |
DC Net Capacity | 0.2 MW |
Crystalline Silicon | Yes |
Net Metering Agreement | No |
Virtual Net Metering Agreement | No |
Generator PV5 Details Operating July 2020
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Single Owner |
Nameplate Capacity | 0.1 MW |
Summer Capacity | 0.1 MW |
Winter Capacity | 0.1 MW |
Minimum Load | 0.1 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | July 2020 |
Planned Retirement | July 2040 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Solar |
Solar Details | |
Fixed Tilt | Yes |
---|---|
Azimuth Angle | 180 |
Tilt Angle | 45 |
DC Net Capacity | 0.2 MW |
Crystalline Silicon | Yes |
Net Metering Agreement | No |
Virtual Net Metering Agreement | No |
Generator PV6 Details Operating July 2020
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Single Owner |
Nameplate Capacity | 0.1 MW |
Summer Capacity | 0.1 MW |
Winter Capacity | 0.1 MW |
Minimum Load | 0.1 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | July 2020 |
Planned Retirement | July 2040 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Solar |
Solar Details | |
Fixed Tilt | Yes |
---|---|
Azimuth Angle | 180 |
Tilt Angle | 45 |
DC Net Capacity | 0.2 MW |
Crystalline Silicon | Yes |
Thin Film CIGS | Yes |
Net Metering Agreement | No |
Virtual Net Metering Agreement | No |
Generator PV7 Details Operating July 2020
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Single Owner |
Nameplate Capacity | 0.1 MW |
Summer Capacity | 0.1 MW |
Winter Capacity | 0.1 MW |
Minimum Load | 0.1 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | July 2020 |
Planned Retirement | July 2040 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Solar |
Solar Details | |
Fixed Tilt | Yes |
---|---|
Azimuth Angle | 180 |
Tilt Angle | 45 |
DC Net Capacity | 0.2 MW |
Crystalline Silicon | Yes |
Net Metering Agreement | No |
Virtual Net Metering Agreement | No |
Generator PV8 Details Operating July 2020
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Single Owner |
Nameplate Capacity | 0.1 MW |
Summer Capacity | 0.1 MW |
Winter Capacity | 0.1 MW |
Minimum Load | 0.1 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | July 2020 |
Planned Retirement | July 2040 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Solar |
Solar Details | |
Fixed Tilt | Yes |
---|---|
Azimuth Angle | 180 |
Tilt Angle | 45 |
DC Net Capacity | 0.2 MW |
Crystalline Silicon | Yes |
Net Metering Agreement | No |
Virtual Net Metering Agreement | No |
Generator PV10 Details Operating July 2023
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Single Owner |
Nameplate Capacity | 0.1 MW |
Summer Capacity | 0.1 MW |
Winter Capacity | 0.1 MW |
Minimum Load | 0.1 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | July 2023 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Solar |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Solar Details | |
Fixed Tilt | Yes |
---|---|
Azimuth Angle | 135 |
Tilt Angle | 35 |
DC Net Capacity | 0.2 MW |
Crystalline Silicon | Yes |
Net Metering Agreement | No |
Virtual Net Metering Agreement | No |
Generator PV11 Details Operating July 2023
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Single Owner |
Nameplate Capacity | 0.1 MW |
Summer Capacity | 0.1 MW |
Winter Capacity | 0.1 MW |
Minimum Load | 0.1 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | July 2023 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Solar |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Solar Details | |
Fixed Tilt | Yes |
---|---|
Azimuth Angle | 135 |
Tilt Angle | 35 |
DC Net Capacity | 0.2 MW |
Crystalline Silicon | Yes |
Net Metering Agreement | No |
Virtual Net Metering Agreement | No |
Generator PV12 Details Operating July 2023
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Single Owner |
Nameplate Capacity | 0.1 MW |
Summer Capacity | 0.1 MW |
Winter Capacity | 0.1 MW |
Minimum Load | 0.1 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | July 2023 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Solar |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Solar Details | |
Fixed Tilt | Yes |
---|---|
Azimuth Angle | 135 |
Tilt Angle | 35 |
DC Net Capacity | 0.2 MW |
Crystalline Silicon | Yes |
Net Metering Agreement | No |
Virtual Net Metering Agreement | No |
Generator PV13 Details Operating July 2023
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Single Owner |
Nameplate Capacity | 0.1 MW |
Summer Capacity | 0.1 MW |
Winter Capacity | 0.1 MW |
Minimum Load | 0.1 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | July 2023 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Solar |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Solar Details | |
Fixed Tilt | Yes |
---|---|
Azimuth Angle | 135 |
Tilt Angle | 35 |
DC Net Capacity | 0.2 MW |
Crystalline Silicon | Yes |
Net Metering Agreement | No |
Virtual Net Metering Agreement | No |
Generator PV14 Details Operating July 2023
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Single Owner |
Nameplate Capacity | 0.1 MW |
Summer Capacity | 0.1 MW |
Winter Capacity | 0.1 MW |
Minimum Load | 0.1 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | July 2023 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Solar |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Solar Details | |
Fixed Tilt | Yes |
---|---|
Azimuth Angle | 135 |
Tilt Angle | 35 |
DC Net Capacity | 0.2 MW |
Crystalline Silicon | Yes |
Net Metering Agreement | No |
Virtual Net Metering Agreement | No |
Generator PV15 Details Operating July 2023
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Single Owner |
Nameplate Capacity | 0.1 MW |
Summer Capacity | 0.1 MW |
Winter Capacity | 0.1 MW |
Minimum Load | 0.1 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | July 2023 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Solar |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Solar Details | |
Fixed Tilt | Yes |
---|---|
Azimuth Angle | 135 |
Tilt Angle | 35 |
DC Net Capacity | 0.2 MW |
Crystalline Silicon | Yes |
Net Metering Agreement | No |
Virtual Net Metering Agreement | No |
Generator PV16 Details Operating July 2023
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Single Owner |
Nameplate Capacity | 0.1 MW |
Summer Capacity | 0.1 MW |
Winter Capacity | 0.1 MW |
Minimum Load | 0.1 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | July 2023 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Solar |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Solar Details | |
Fixed Tilt | Yes |
---|---|
Azimuth Angle | 135 |
Tilt Angle | 35 |
DC Net Capacity | 0.2 MW |
Crystalline Silicon | Yes |
Net Metering Agreement | No |
Virtual Net Metering Agreement | No |
Generator PV17 Details Operating July 2023
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Single Owner |
Nameplate Capacity | 0.1 MW |
Summer Capacity | 0.1 MW |
Winter Capacity | 0.1 MW |
Minimum Load | 0.1 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | July 2023 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Solar |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Solar Details | |
Fixed Tilt | Yes |
---|---|
Azimuth Angle | 135 |
Tilt Angle | 35 |
DC Net Capacity | 0.2 MW |
Crystalline Silicon | Yes |
Net Metering Agreement | No |
Virtual Net Metering Agreement | No |
Generator PV9 Details Operating July 2023
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Single Owner |
Nameplate Capacity | 0.1 MW |
Summer Capacity | 0.1 MW |
Winter Capacity | 0.1 MW |
Minimum Load | 0.1 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | July 2023 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Solar |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Solar Details | |
Fixed Tilt | Yes |
---|---|
Azimuth Angle | 135 |
Tilt Angle | 35 |
DC Net Capacity | 0.2 MW |
Crystalline Silicon | Yes |
Net Metering Agreement | No |
Virtual Net Metering Agreement | No |
Kotzebue Hybrid Plant Owners
Owner Name | Address | Generator | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Distillate Fuel Oil.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#37 | Northeast (MO) | Kansas City, MO | 25.5 GWh |
#38 | Milton R Young | Center, ND | 4.4 TWh |
#39 | Crystal River | Crystal River, FL | 16.3 TWh |
#40 | Stony Brook | Ludlow, MA | 25.0 GWh |
#41 | Brandon Shores | Baltimore, MD | 1.6 TWh |
#42 | Laramie River Station | Wheatland, WY | 7.0 TWh |
#43 | Naknek | Naknek, AK | 23.5 GWh |
#44 | FirstEnergy Fort Martin Power Station | Maidsville, WV | 4.3 TWh |
#45 | Iatan | Weston, MO | 3.6 TWh |
#46 | Mt Storm | Mount Storm, WV | 3.6 TWh |
#48 | Fayette Power Project | La Grange, TX | 7.0 TWh |
#49 | Springerville | Springerville, AZ | 6.3 TWh |
#50 | Martin Lake | Tatum, TX | 10.8 TWh |
#51 | Miami Fort | North Bend, OH | 5.1 TWh |
#52 | Westward Seafoods | Dutch Harbor, AK | 18.9 GWh |
#53 | Dillingham | Dillingham, AK | 18.7 GWh |
#54 | Richard M Flynn | Holtsville, NY | 429.5 GWh |
#55 | McManus | Brunswick, GA | 18.1 GWh |
#56 | Wheaton | Eau Claire, WI | 30.9 GWh |
#57 | Bowen | Cartersville, GA | 11.2 TWh |