Kirkwood Wind Turbine
6301 Kirkwood Blvd SW, Cedar Rapids, IA 52404Plant Summary Information
Kirkwood Wind Turbine is ranked #123 out of 124 wind farms in Iowa in terms of total annual net electricity generation.
Kirkwood Wind Turbine generated -24.0 MWh during the 3-month period between September 2023 to December 2023.
Plant Name | Kirkwood Wind Turbine |
---|---|
Utility Name | Kirkwood Community College |
Location | Linn County, IA |
Initial Operation Date | February 2012 |
Last Update | Dec 2023 |
Annual Generation | 223.0 MWh |
Annual Consumption | 1.1 k MMBtu |
Ranked #11,277 out of 11,852 Power Plants Nationwide | |
Ranked #1,338 out of 1,345 Wind Power Plants Nationwide | |
Ranked #205 out of 272 Iowa Power Plants | |
Ranked #123 out of 124 Iowa Wind Power Plants | |
Fuel Types | Wind |
Map of Kirkwood Wind Turbine
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Kirkwood Wind Turbine.
Monthly Net Generation for Kirkwood Wind Turbine
Kirkwood Wind Turbine Details
Summary Information | |
---|---|
Plant Name | Kirkwood Wind Turbine (59735) |
Plant Address | 6301 Kirkwood Blvd SW, Cedar Rapids, IA 52404 |
Utility | Kirkwood Community College (59504) |
Latitude, Longitude | 41.91656, -91.6509 |
Generation Dates on File | Jan 2015 to Dec 2023 |
Initial Operation Date | February 2012 |
Annual Generation | 223.0 MWh |
Fuel Types | Wind |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | MRO |
Balancing Authority | Midcontinent Independent Transmission System Operator, Inc.. (MISO) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | |
Ash Impoundment | No |
Transmission / Distribution Owner | Interstate Power and Light Co (9417) IA |
Grid Voltage | 12.40 kV |
Energy Storage | No |
Generator KCC01 Details Out of Service February 2012
Technology | Onshore Wind Turbine |
---|---|
Prime Mover | Wind Turbine, Onshore |
Ownership | Single Owner |
Nameplate Capacity | 2.5 MW |
Summer Capacity | 0.7 MW |
Winter Capacity | 2.3 MW |
Minimum Load | 0.1 MW |
Uprate/Derate Completed | No |
Status | Out of Service |
---|---|
First Operation Date | February 2012 |
Planned Retirement | December 2024 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Wind |
Turbines/Hydrokinetic Buoys | 4 |
Multiple Fuels | No |
Turbine Details | |
Number Of Turbines | 4 |
---|---|
Predominant Turbine Manufacturer | Clipper |
Predominant Turbine Model Number | Liberty C96 |
Design Wind Speed | 13.4 MPH |
Wind Quality Class | 2 - Medium Wind |
Turbine Hub Height Feet | 262.4 |
Kirkwood Wind Turbine Plant Owners
Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Wind.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#1325 | ZCO | Tehachapi, CA | 1.1 GWh |
#1326 | Marshall Wind 5 LLC | Marshall, MN | 985.0 MWh |
#1327 | Heartland Community College | Normal, IL | 943.0 MWh |
#1328 | Foundation Superior Farms | Dixon, CA | 690.0 MWh |
#1329 | Euclid Farm, Stamco N-54 | Euclid, OH | 607.9 MWh |
#1330 | Deer Island Treatment Plant | Winthrop, MA | 37.3 GWh |
#1331 | Lucky Wind | Pipestone, MN | 576.0 MWh |
#1332 | Harbec Energy | Ontario, NY | 977.0 MWh |
#1333 | Blue Breezes LLC | Blue Earth, MN | 418.0 MWh |
#1334 | Blue Breezes II LLC | Blue Earth, MN | 418.0 MWh |
#1335 | Foundation IE | Rancho Cucamonga, CA | 391.0 MWh |
#1336 | Green Power I | North Palm Springs, CA | 318.0 MWh |
#1337 | Sand Point | Sand Point, AK | 3.3 GWh |
#1339 | Northern Lights Wind LLC | Pipestone, MN | 157.0 MWh |
#1340 | TAC-Distributed Energy Resource Hybrid | Champaign, IL | 266.0 MWh |
#1341 | Chamberlain Wind Project | Chamberlain, SD | 98.0 MWh |
#1342 | Noble Ridge LLC | Wilmont, MN | 80.8 MWh |
#1343 | Texico Wind Ranch LP | Texico, NM | 34.0 MWh |
#1344 | Luther College Wind Project | Decorah, IA | 10.0 MWh |
#1345 | Jiminy Peak Wind QF | Hancock, MA | 1.0 MWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Kirkwood Wind Turbine.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Alliant SBD 8602 Marion Sub | Marion, IA | 14.7 MWh | 8.2 mi |
Alliant SBD 9106 Rockwell CR | Cedar Rapids, IA | 232.3 MWh | 8.2 mi |
Alliant SBD 9203 Profol | Cedar Rapids, IA | 133.0 MWh | 1.5 mi |
Alliant SBD 9403 Aegon DC | Cedar Rapids, IA | 17.6 MWh | 0.2 mi |
Alliant SBD0201 Ingredion | Cedar Rapids, IA | 76.4 MWh | 3.8 mi |
Alliant SBG 9802 Toyota | Cedar Rapids, IA | 66.6 MWh | 8.3 mi |
Amana Society Service Company | Middle Amana, IA | 947.0 MWh | 15 mi |
Anchor Wind, LLC | Mechanicsville, IA | 7.8 GWh | 21.9 mi |
Archer Daniels Midland Cedar Rapids | Cedar Rapids, IA | 1.0 TWh | 1.9 mi |
Coggon | Coggon, IA | 14.0 MWh | 25.9 mi |
Coralville GT | Coralville, IA | 1.0 GWh | 17.5 mi |
Diamond Trail Wind Farm | Ladora, IA | 853.8 GWh | 31.3 mi |
Duane Arnold Solar I (50 MW) | Palo, IA | 29.4 GWh | 14.6 mi |
Farmers Electric Cooperative - Kalona | Kalona, IA | 53.0 MWh | 24.6 mi |
Independence Wind Farm | Manchester, IA | 218.4 GWh | 35.8 mi |
Johnson County Hills Solar | Iowa City, IA | 5.9 GWh | 24.4 mi |
Prairie Creek | Cedar Rapids, IA | 74.4 GWh | 2 mi |
Tipton | Tipton, IA | 42.0 MWh | 28.5 mi |
University of Iowa Main Power Plant | Iowa City, IA | 3.8 GWh | 18.8 mi |
West Liberty | West Liberty, IA | 39.0 MWh | 31.2 mi |