6301 Kirkwood Blvd SW, Cedar Rapids, IA 52404Plant Summary Information
Kirkwood Wind Turbine is ranked #123 out of 123 wind farms in Iowa in terms of total annual net electricity generation.
Kirkwood Wind Turbine generated 123.5 MWh during the 3-month period between September 2022 to December 2022.
Plant Name | Kirkwood Wind Turbine |
---|---|
Utility Name | Kirkwood Community College |
Location | Linn County, IA |
Initial Operation Date | February 2012 |
Last Update | Dec 2022 |
Annual Generation | 519.6 MWh |
Annual Consumption | 2.7 k MMBtu |
Ranked #10,497 out of 11,249 Power Plants Nationwide | |
Ranked #1,323 out of 1,329 Wind Power Plants Nationwide | |
Ranked #193 out of 264 Iowa Power Plants | |
Ranked #123 out of 123 Iowa Wind Power Plants | |
Fuel Types | Wind |
Map of Kirkwood Wind Turbine
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Kirkwood Wind Turbine.
Monthly Net Generation for Kirkwood Wind Turbine
Kirkwood Wind Turbine Details
Summary Information | |
---|---|
Plant Name | Kirkwood Wind Turbine (59735) |
Plant Address | 6301 Kirkwood Blvd SW Cedar Rapids, IA 52404 |
Utility | Kirkwood Community College (59504) |
Latitude, Longitude | 41.91656, -91.6509 |
Generation Dates on File | Jan 2015 to Dec 2022 |
Initial Operation Date | February 2012 |
Annual Generation | 519.6 MWh |
Fuel Types | Wind |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | MRO |
Balancing Authority | Midcontinent Independent Transmission System Operator, Inc.. (MISO) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | |
Ash Impoundment | No |
Transmission / Distribution Owner | Interstate Power and Light Co (9417) IA |
Grid Voltage | 12.40 kV |
Energy Storage | No |
Generator KCC01 Details Operating February 2012
Technology | Onshore Wind Turbine |
---|---|
Prime Mover | Wind Turbine, Onshore |
Ownership | Single Owner |
Nameplate Capacity | 2.5 MW |
Summer Capacity | 0.7 MW |
Winter Capacity | 2.3 MW |
Minimum Load | 0.1 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | February 2012 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Wind |
Turbines/Hydrokinetic Buoys | 4 |
Other Planned Modifications | No |
Multiple Fuels | No |
Turbine Details | |
Number Of Turbines | 4 |
---|---|
Predominant Turbine Manufacturer | Clipper |
Predominant Turbine Model Number | Liberty C96 |
Design Wind Speed | 13.4 MPH |
Wind Quality Class | 2 - Medium Wind |
Turbine Hub Height Feet | 262.4 |
Kirkwood Wind Turbine Plant Owners
Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Wind.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#1309 | Foundation Cemex Madison | Madison, CA | 1.7 GWh |
#1310 | Charlestown Wind Turbine | Charlestown, MA | 1.7 GWh |
#1311 | Filet Wind (5) LLC | Stratford, TX | 1.7 GWh |
#1312 | ZCO | Tehachapi, CA | 1.7 GWh |
#1313 | Henkel U.S. Operations Corporation | Geneva, NY | 1.3 GWh |
#1314 | Foundation Superior Farms | Dixon, CA | 1.3 GWh |
#1315 | Garden 2 Solar Park | Garden Township, MI | 1.2 GWh |
#1316 | Sand Point | Sand Point, AK | 3.9 GWh |
#1317 | Foundation IE | Rancho Cucamonga, CA | 702.3 MWh |
#1318 | Green Power I | North Palm Springs, CA | 605.4 MWh |
#1319 | Deer Island Treatment Plant | Winthrop, MA | 41.0 GWh |
#1320 | Euclid Farm, Stamco N-54 | Euclid, OH | 598.0 MWh |
#1321 | PYCO Industries, Inc. Wind Farm | Lubbock, TX | 551.2 MWh |
#1322 | Moorhead Wind Turbine | Moorhead, MN | 543.2 MWh |
#1324 | Harbec Energy | Ontario, NY | 717.5 MWh |
#1325 | Noble Ridge LLC | Wilmont, MN | 402.0 MWh |
#1326 | TAC-Distributed Energy Resource Hybrid | Champaign, IL | 323.9 MWh |
#1327 | Chamberlain Wind Project | Chamberlain, SD | 151.1 MWh |
#1328 | Texico Wind Ranch LP | Texico, NM | 92.7 MWh |
#1329 | Jiminy Peak Wind QF | Hancock, MA | 1.2 MWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Kirkwood Wind Turbine.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Alliant SBD 8602 Marion Sub | Marion, IA | 33.3 MWh | 8.2 mi |
Alliant SBD 9106 Rockwell CR | Cedar Rapids, IA | 241.5 MWh | 8.2 mi |
Alliant SBD 9203 Profol | Cedar Rapids, IA | 119.8 MWh | 1.5 mi |
Alliant SBD 9403 Aegon DC | Cedar Rapids, IA | 20.3 MWh | 0.2 mi |
Alliant SBD0201 Ingredion | Cedar Rapids, IA | 28.3 MWh | 3.8 mi |
Alliant SBG 9802 Toyota | Cedar Rapids, IA | 196.5 MWh | 8.3 mi |
Amana Society Service Company | Middle Amana, IA | 1.1 GWh | 15 mi |
Anchor Wind, LLC | Mechanicsville, IA | 10.5 GWh | 21.9 mi |
Archer Daniels Midland Cedar Rapids | Cedar Rapids, IA | 1.0 TWh | 1.9 mi |
Coggon | Coggon, IA | 41.6 MWh | 25.9 mi |
Coralville GT | Coralville, IA | 3.2 GWh | 17.5 mi |
Diamond Trail Wind Farm | Ladora, IA | 912.9 GWh | 31.3 mi |
Eastern Iowa Solar | Wilton, IA | 3.3 GWh | 38.6 mi |
Farmers Electric Cooperative - Kalona | Kalona, IA | 127.6 MWh | 24.6 mi |
Hopkinton | Hopkinton, IA | 41.7 MWh | 36 mi |
Independence Wind Farm | Manchester, IA | 235.3 GWh | 35.8 mi |
Johnson County Hills Solar | Iowa City, IA | 5.4 GWh | 24.4 mi |
Prairie Creek | Cedar Rapids, IA | 81.5 GWh | 2 mi |
Tipton | Tipton, IA | 165.9 MWh | 28.5 mi |
University of Iowa Main Power Plant | Iowa City, IA | 52.8 GWh | 18.8 mi |