Kinston Davis Farm
117 Hwy 11 South, Kinston, NC 28504Plant Summary Information
Kinston Davis Farm is ranked #306 out of 748 solar farms in North Carolina in terms of total annual net electricity generation.
Kinston Davis Farm generated 2.0 GWh during the 3-month period between September 2023 to December 2023.
Plant Name | Kinston Davis Farm |
---|---|
Utility Name | Strata Manager, LLC |
Location | Lenoir County, NC |
Initial Operation Date | March 2015 |
Last Update | Dec 2023 |
Annual Generation | 9.0 GWh |
Annual Consumption | 32.1 k MMBtu |
Ranked #6,230 out of 11,835 Power Plants Nationwide | |
Ranked #1,767 out of 5,643 Solar Power Plants Nationwide | |
Ranked #380 out of 862 North Carolina Power Plants | |
Ranked #306 out of 748 North Carolina Solar Power Plants | |
Fuel Types | Solar |
Previous Operator |
Kinston Davis Farm, LLC (2016 to 2020) Strata Manager, LLC (2021 to 2023) |
Map of Kinston Davis Farm
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Kinston Davis Farm.
Monthly Net Generation for Kinston Davis Farm
Kinston Davis Farm Details
Summary Information | |
---|---|
Plant Name | Kinston Davis Farm (61090) |
Plant Address | 117 Hwy 11 South, Kinston, NC 28504 |
Utility | Strata Manager, LLC (64778) |
Latitude, Longitude | 35.2184, -77.64259 |
Generation Dates on File | Jan 2016 to Dec 2023 |
Initial Operation Date | March 2015 |
Annual Generation | 9.0 GWh |
Fuel Types | Solar |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | Yes |
FERC Small Power Producer Docket Number | QF 14-516 |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | SERC |
Balancing Authority | Duke Energy Progress East (CPLE) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | |
Ash Impoundment | No |
Transmission / Distribution Owner | Duke Energy Progress - (NC) (3046) NC |
Grid Voltage | 24.00 kV |
Energy Storage | No |
Generator 1 Details Operating March 2015
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Wholly Owned by Other Entity |
Nameplate Capacity | 5 MW |
Summer Capacity | 5 MW |
Winter Capacity | 5 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | March 2015 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Solar |
Multiple Fuels | No |
Solar Details | |
Fixed Tilt | Yes |
---|---|
Azimuth Angle | 180 |
Tilt Angle | 20 |
DC Net Capacity | 6.5 MW |
Crystalline Silicon | Yes |
Net Metering Agreement | No |
Virtual Net Metering Agreement | No |
Kinston Davis Farm Plant Owners
Owner Name | Address | Ownership |
---|---|---|
Kinston Davis Farm, LLC | 800 Taylor St, Suite 200, Durham, NC 27701 | 100.00% |
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#1757 | IGS KSBD | Highland, CA | 9.0 GWh |
#1758 | Franklinton Solar | Franklinton, NC | 9.0 GWh |
#1759 | Vicksburg Solar | Henderson, NC | 9.0 GWh |
#1760 | Van Slyke Solar Center, LLC | Elm City, NC | 9.0 GWh |
#1761 | Woodland Church Farm | Albertson, NC | 9.0 GWh |
#1762 | Candace Solar | Princeton, NC | 9.0 GWh |
#1763 | Gates Solar LLC | Eure, NC | 9.0 GWh |
#1764 | Washington Airport Solar LLC | Washington, NC | 9.0 GWh |
#1765 | Bantam Solar | Saint Johnsville, NY | 9.0 GWh |
#1766 | Tamworth Holdings | Garland, NC | 9.0 GWh |
#1768 | Moorings Farm 2, LLC | LaGrange, NC | 9.0 GWh |
#1769 | Sonne Two | Newton, NC | 9.0 GWh |
#1770 | Meriwether Farm | Oxford, NC | 9.0 GWh |
#1771 | Mill Pond Solar Farm, LLC | Whiteville, NC | 9.0 GWh |
#1772 | Pollocksville Solar | Pollocksville, NC | 9.0 GWh |
#1773 | Arndt Farm | Claremont, NC | 9.0 GWh |
#1774 | Dragstrip Farm | Hickory, NC | 9.0 GWh |
#1775 | Flat Meeks PV 1 | Robersonville, NC | 9.0 GWh |
#1776 | Flatwood Farm | Moncure, NC | 9.0 GWh |
#1777 | Baldwin | West Baldwin, ME | 9.0 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Kinston Davis Farm.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Albemarle Solar Center LLC | Kinston, NC | 9.1 GWh | 7.1 mi |
Albertson Solar LLC | Albertson, NC | 10.8 GWh | 12.9 mi |
Arba Solar, LLC | Snow Hill, NC | 2.9 GWh | 12.8 mi |
Bondi Solar | Kinston, NC | 9.6 GWh | 8.3 mi |
Crockett Farm | Kinston, NC | 9.1 GWh | 5.2 mi |
Hood Farm Solar, LLC | Trenton, NC | 8.8 GWh | 8.3 mi |
Innovative Solar 54 | Kinston, NC | 100.2 GWh | 4 mi |
Innovative Solar 63, LLC | Snow Hill, NC | 8.5 GWh | 12 mi |
Kinston | Kinston, NC | 3.9 GWh | 10.7 mi |
Kinston Solar | Grifton, NC | 6.0 GWh | 13.3 mi |
Lang Solar Farm | La Grange, NC | 9.3 GWh | 8 mi |
Lenoir Farm | Kinston, NC | 8.3 GWh | 7.9 mi |
Lenoir Farm 2 | Kinston, NC | 8.0 GWh | 13.1 mi |
Long Henry Solar | Seven Springs, NC | 4.0 GWh | 14.3 mi |
Moorings Farm | New Hope, NC | 8.1 GWh | 12.1 mi |
Moorings Farm 2, LLC | LaGrange, NC | 9.0 GWh | 12.1 mi |
Scarlet Solar | La Grange, NC | 3.8 GWh | 9.8 mi |
Smithfield Packaged Meats Corp. | Kinston, NC | 1.5 GWh | 3.6 mi |
Thornton PV1 | Snow Hill, NC | 8.4 GWh | 12.3 mi |
Wyse Fork Solar Farm, LLC | Dover, NC | 3.5 GWh | 7.9 mi |