Kingston
Swan Pond Rd. PO Box 2000, Kingston, TN 37763Plant Summary Information
Kingston is ranked #8 out of 82 power plants in Tennessee in terms of total annual net electricity generation.
Kingston is comprised of 9 generators and generated 1.0 TWh during the 3-month period between December 2023 to March 2024.
Plant Name | Kingston |
---|---|
Utility Name | Tennessee Valley Authority |
Location | Roane County, TN |
Initial Operation Date | February 1954 |
Last Update | Mar 2024 |
Annual Generation | 2.9 TWh |
Annual Consumption | 35.7 M MMBtu |
Ranked #429 out of 11,249 Power Plants Nationwide | |
Ranked #65 out of 134 Subbituminous Coal Power Plants Nationwide | |
Ranked #8 out of 82 Tennessee Power Plants | |
Ranked #2 out of 2 Tennessee Subbituminous Coal Power Plants | |
Fuel Types | Subbituminous Coal : 62.4% Bituminous Coal : 37.2% |
Map of Kingston
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Kingston.
Monthly Net Generation for Kingston
Kingston Details
Summary Information | |
---|---|
Plant Name | Kingston (3407) |
Plant Address | Swan Pond Rd. PO Box 2000 Kingston, TN 37763 |
Utility | Tennessee Valley Authority (18642) |
Latitude, Longitude | 35.8992, -84.5194 |
Generation Dates on File | Jan 2001 to Mar 2024 |
Initial Operation Date | February 1954 |
Annual Generation | 2.9 TWh |
Fuel Types | Subbituminous Coal : 62.4% Bituminous Coal : 37.2% |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Regulated |
NERC Region | SERC |
Balancing Authority | Tennessee Valley Authority (TVA) |
NAICS Code | Utilities (22) |
Sector | Electric Utility (1) |
Water Source | Clinch And Emory Rivers |
Ash Impoundment | Yes Not Lined Operating |
Transmission / Distribution Owner | Tennessee Valley Authority (18642) TN |
Grid Voltage | 161.00 kV |
Energy Storage | No |
Generator 1 Details Operating February 1954
Technology | Conventional Steam Coal |
---|---|
Prime Mover | Steam Turbine |
Ownership | Single Owner |
Nameplate Capacity | 175 MW |
Nameplate Power Factor | 0.9 |
Summer Capacity | 132 MW |
Winter Capacity | 135 MW |
Minimum Load | 55 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | February 1954 |
Planned Retirement | December 2027 |
---|---|
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Subbituminous Coal / Bituminous Coal |
Startup Source | Distillate Fuel Oil |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | OVER |
Pulverized Coal Technology | Yes |
Subcritical Technology | Yes |
Multiple Fuels | Yes |
Generator 2 Details Operating April 1954
Technology | Conventional Steam Coal |
---|---|
Prime Mover | Steam Turbine |
Ownership | Single Owner |
Nameplate Capacity | 175 MW |
Nameplate Power Factor | 0.9 |
Summer Capacity | 132 MW |
Winter Capacity | 135 MW |
Minimum Load | 55 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | April 1954 |
Planned Retirement | December 2027 |
---|---|
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Subbituminous Coal / Bituminous Coal |
Startup Source | Distillate Fuel Oil |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | OVER |
Pulverized Coal Technology | Yes |
Subcritical Technology | Yes |
Multiple Fuels | Yes |
Generator 3 Details Operating June 1954
Technology | Conventional Steam Coal |
---|---|
Prime Mover | Steam Turbine |
Ownership | Single Owner |
Nameplate Capacity | 175 MW |
Nameplate Power Factor | 0.9 |
Summer Capacity | 132 MW |
Winter Capacity | 135 MW |
Minimum Load | 55 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | June 1954 |
Planned Retirement | December 2027 |
---|---|
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Subbituminous Coal / Bituminous Coal |
Startup Source | Distillate Fuel Oil |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | OVER |
Pulverized Coal Technology | Yes |
Subcritical Technology | Yes |
Multiple Fuels | Yes |
Generator 4 Details Operating July 1954
Technology | Conventional Steam Coal |
---|---|
Prime Mover | Steam Turbine |
Ownership | Single Owner |
Nameplate Capacity | 175 MW |
Nameplate Power Factor | 0.9 |
Summer Capacity | 132 MW |
Winter Capacity | 135 MW |
Minimum Load | 55 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | July 1954 |
Planned Retirement | December 2027 |
---|---|
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Subbituminous Coal / Bituminous Coal |
Startup Source | Distillate Fuel Oil |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | OVER |
Pulverized Coal Technology | Yes |
Subcritical Technology | Yes |
Multiple Fuels | Yes |
Generator 5 Details Operating January 1955
Technology | Conventional Steam Coal |
---|---|
Prime Mover | Steam Turbine |
Ownership | Single Owner |
Nameplate Capacity | 200 MW |
Nameplate Power Factor | 0.9 |
Summer Capacity | 174 MW |
Winter Capacity | 176 MW |
Minimum Load | 73 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | January 1955 |
Planned Retirement | December 2027 |
---|---|
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Subbituminous Coal / Bituminous Coal |
Startup Source | Distillate Fuel Oil |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | OVER |
Pulverized Coal Technology | Yes |
Subcritical Technology | Yes |
Multiple Fuels | Yes |
Generator 9 Details Operating December 1955
Technology | Conventional Steam Coal |
---|---|
Prime Mover | Steam Turbine |
Ownership | Single Owner |
Nameplate Capacity | 200 MW |
Nameplate Power Factor | 0.9 |
Summer Capacity | 174 MW |
Winter Capacity | 176 MW |
Minimum Load | 73 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | December 1955 |
Planned Retirement | December 2026 |
---|---|
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Subbituminous Coal / Bituminous Coal |
Startup Source | Distillate Fuel Oil |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | OVER |
Pulverized Coal Technology | Yes |
Subcritical Technology | Yes |
Multiple Fuels | Yes |
Generator 6 Details Operating March 1955
Technology | Conventional Steam Coal |
---|---|
Prime Mover | Steam Turbine |
Ownership | Single Owner |
Nameplate Capacity | 200 MW |
Nameplate Power Factor | 0.9 |
Summer Capacity | 174 MW |
Winter Capacity | 176 MW |
Minimum Load | 73 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | March 1955 |
Planned Retirement | December 2027 |
---|---|
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Subbituminous Coal / Bituminous Coal |
Startup Source | Distillate Fuel Oil |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | OVER |
Pulverized Coal Technology | Yes |
Subcritical Technology | Yes |
Multiple Fuels | Yes |
Generator 7 Details Operating May 1955
Technology | Conventional Steam Coal |
---|---|
Prime Mover | Steam Turbine |
Ownership | Single Owner |
Nameplate Capacity | 200 MW |
Nameplate Power Factor | 0.9 |
Summer Capacity | 174 MW |
Winter Capacity | 176 MW |
Minimum Load | 73 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | May 1955 |
Planned Retirement | December 2026 |
---|---|
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Subbituminous Coal / Bituminous Coal |
Startup Source | Distillate Fuel Oil |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | OVER |
Pulverized Coal Technology | Yes |
Subcritical Technology | Yes |
Multiple Fuels | Yes |
Generator 8 Details Operating August 1955
Technology | Conventional Steam Coal |
---|---|
Prime Mover | Steam Turbine |
Ownership | Single Owner |
Nameplate Capacity | 200 MW |
Nameplate Power Factor | 0.9 |
Summer Capacity | 174 MW |
Winter Capacity | 176 MW |
Minimum Load | 73 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | August 1955 |
Planned Retirement | December 2026 |
---|---|
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Subbituminous Coal / Bituminous Coal |
Startup Source | Distillate Fuel Oil |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | OVER |
Pulverized Coal Technology | Yes |
Subcritical Technology | Yes |
Multiple Fuels | Yes |
Kingston Plant Owners
Owner Name | Address | Generator | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Subbituminous Coal.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#55 | Edgewater | Sheboygan, WI | 2.3 TWh |
#56 | Hawthorn | Kansas City, MO | 2.8 TWh |
#57 | Flint Creek | Gentry, AR | 2.2 TWh |
#58 | Naughton | Kemmerer, WY | 3.2 TWh |
#59 | Wyodak | Gillette, WY | 2.0 TWh |
#60 | John Twitty Energy Center | Springfield, MO | 2.2 TWh |
#61 | Cholla | Joseph City, AZ | 2.0 TWh |
#62 | Big Stone | Big Stone City, SD | 1.9 TWh |
#63 | Brame Energy Center | Lena, LA | 4.5 TWh |
#64 | R S Nelson | Westlake, LA | 1.9 TWh |
#66 | Big Cajun 2 | New Roads, LA | 2.7 TWh |
#67 | Lawrence Energy Center | Lawrence, KS | 1.9 TWh |
#68 | Holcomb | Holcomb, KS | 1.5 TWh |
#69 | Victor J Daniel Jr | Escatawpa, MS | 10.0 TWh |
#70 | Powerton | Pekin, IL | 1.5 TWh |
#71 | Sikeston Power Station | Sikeston, MO | 1.5 TWh |
#72 | Northeastern | Oologah, OK | 4.0 TWh |
#73 | North Omaha | Omaha, NE | 1.6 TWh |
#74 | Michigan City | Michigan City, IN | 1.8 TWh |
#75 | George Neal North | Sergeant Bluff, IA | 1.3 TWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Kingston.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Apalachia | Reliance, TN | 486.7 GWh | 52.1 mi |
Buffalo Mountain Energy Center | Oliver Springs, TN | 17.7 GWh | 18.5 mi |
Bull Run | Clinton, TN | 767.5 GWh | 22 mi |
Calderwood | Tallassee, TN | 689.7 GWh | 41.3 mi |
Cheoah | Tapoco, NC | 563.6 GWh | 45.1 mi |
Chestnut Ridge Gas Recovery | Heiskell, TN | 24.4 GWh | 31.1 mi |
Chilhowee | Tallassee, TN | 184.4 GWh | 35.9 mi |
Douglas Dam | Dandridge, TN | 451.8 GWh | 55 mi |
Fontana Dam | Fontana Dam, NC | 1.1 TWh | 50.7 mi |
Fort Loudoun | Lenoir City, TN | 874.1 GWh | 17.2 mi |
Hiwassee Dam | Murphy, NC | 248.4 GWh | 55.2 mi |
Melton Hill | Lenoir City, TN | 146.3 GWh | 12.3 mi |
Norris Dam | Norris, TN | 497.8 GWh | 32.8 mi |
Ocoee 1 | Benton, TN | 97.5 GWh | 56.1 mi |
Ocoee 2 | Benton, TN | 90.9 GWh | 56.5 mi |
Primient Loudon Plant | Loudon, TN | 409.2 GWh | 15.9 mi |
Santeetlah | Robbinsville, NC | 173.0 GWh | 48.2 mi |
University of Tennessee Steam Plant | Knoxville, TN | 36.7 GWh | 33.4 mi |
Watts Bar Hydro | Spring City, TN | 1.0 TWh | 24.4 mi |
Watts Bar Nuclear Plant | Spring City, TN | 20.4 TWh | 25.5 mi |