King Mountain Wind Ranch 1
120 E. 5th Street, McCamey, TX 79752Plant Summary Information
King Mountain Wind Ranch 1 is ranked #95 out of 219 wind farms in Texas in terms of total annual net electricity generation.
King Mountain Wind Ranch 1 generated 126.1 GWh during the 3-month period between September 2024 to December 2024.
Plant Name | King Mountain Wind Ranch 1 |
---|---|
Utility Name | FPL Energy Upton Wind LP |
Location | Upton County, TX |
Initial Operation Date | June 2001 |
Last Update | Dec 2024 |
Annual Generation | 547.7 GWh |
Annual Consumption | 2.1 M MMBtu |
Ranked #1,203 out of 11,949 Power Plants Nationwide | |
Ranked #309 out of 1,354 Wind Power Plants Nationwide | |
Ranked #225 out of 769 Texas Power Plants | |
Ranked #95 out of 219 Texas Wind Power Plants | |
Fuel Types | Wind |
Map of King Mountain Wind Ranch 1
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for King Mountain Wind Ranch 1.
Monthly Net Generation for King Mountain Wind Ranch 1
King Mountain Wind Ranch 1 Details
Summary Information | |
---|---|
Plant Name | King Mountain Wind Ranch 1 (55581) |
Plant Address | 120 E. 5th Street, McCamey, TX 79752 |
Utility | FPL Energy Upton Wind LP (6354) |
Latitude, Longitude | 31.2092, -102.2417 |
Generation Dates on File | Aug 2001 to Dec 2024 |
Initial Operation Date | June 2001 |
Annual Generation | 547.7 GWh |
Fuel Types | Wind |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | TRE |
Balancing Authority | Electric Reliability Council of Texas, Inc. (ERCO) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | |
Ash Impoundment | No |
Transmission / Distribution Owner | AEP Texas North Company (20404) TX |
Grid Voltage | 138.00 kV |
Energy Storage | No |
Generator EXIS Details Operating June 2001
Technology | Onshore Wind Turbine |
---|---|
Prime Mover | Wind Turbine, Onshore |
Ownership | Single Owner |
Nameplate Capacity | 278 MW |
Summer Capacity | 278 MW |
Winter Capacity | 278 MW |
Minimum Load | 14.1 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | June 2001 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Wind |
Solid Fuel Gasification | No |
Turbines/Hydrokinetic Buoys | 214 |
Turbine Details | |
Number Of Turbines | 214 |
---|---|
Predominant Turbine Manufacturer | Siemens |
Predominant Turbine Model Number | SWT-1.3-62 |
Design Wind Speed | 19 MPH |
Wind Quality Class | 2 - Medium Wind |
Turbine Hub Height Feet | 203.4 |
King Mountain Wind Ranch 1 Plant Owners
Owner Name | Address | Ownership | |
---|---|---|---|
We couldn't locate any owners for this plant |
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Wind.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#299 | Old Trail Wind Farm | Ellsworth, IL | 566.1 GWh |
#300 | Bishop Hill Energy LLC | Cambridge, IL | 564.1 GWh |
#301 | Panorama Wind, LLC | Grover, CO | 562.4 GWh |
#302 | FPL Energy Ashtabula Wind LLC | Luverne, ND | 561.6 GWh |
#303 | Marengo Wind Plant | Dayton, WA | 560.6 GWh |
#304 | Stella Wind Farm | Armstrong, TX | 556.4 GWh |
#305 | Headwaters Wind Farm II LLC | Losanville, IN | 552.6 GWh |
#306 | King Creek Wind Farm 1, LLC | Throckmorton, TX | 552.5 GWh |
#307 | Carroll Wind Farm | Carroll, IA | 548.8 GWh |
#308 | High Trail Wind Farm LLC | Ellsworth, IL | 548.5 GWh |
#310 | Rattlesnake Power, LLC | Brady, TX | 547.7 GWh |
#311 | Old Settler Wind | Floydada, TX | 547.7 GWh |
#312 | Mountain Breeze Wind, LLC | Grover, CO | 547.2 GWh |
#313 | New Mexico Wind Energy Center | House, NM | 546.7 GWh |
#314 | Green River Wind Farm | Deer Grove, IL | 545.2 GWh |
#315 | Wildcat Creek Wind Farm LLC | Gainesville, TX | 544.4 GWh |
#316 | Spinning Spur Wind II | Adrian, TX | 543.9 GWh |
#317 | Frontier Windpower | Newkirk, OK | 541.6 GWh |
#318 | Cimarron Bend III | Minneola, KS | 538.8 GWh |
#319 | Grant Wind, LLC | Medford, OK | 538.6 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding King Mountain Wind Ranch 1.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Alamo 6 | Fort Stockton, TX | 237.9 GWh | 15 mi |
Appaloosa Run Wind | Rankin, TX | 708.8 GWh | 24.5 mi |
Castle Gap Solar Hybrid | McCarney, TX | 396.1 GWh | 3.6 mi |
CED Crane Solar | Crane, TX | 409.9 GWh | 5.2 mi |
Desert Sky | Iraan, TX | 462.3 GWh | 22.1 mi |
East Pecos Solar | McCamey, TX | 247.4 GWh | 14.6 mi |
Emerald Grove | Crane, TX | 278.7 GWh | 10.6 mi |
Greasewood II LLC | Girvin, TX | 178.4 GWh | 22.7 mi |
Greasewood Solar | Fort Stockton, TX | 168.8 GWh | 19.1 mi |
High Lonesome Wind Power, LLC Hybrid | Rankin, TX | 1.2 TWh | 21.5 mi |
Midway Solar - TX | Fort Stockton, TX | 316.7 GWh | 14.8 mi |
NWP Indian Mesa Wind Farm | Iraan, TX | 197.8 GWh | 19.3 mi |
Pearl Solar | Fort Stockton, TX | 101.2 GWh | 15.4 mi |
RE Maplewood | McCamey, TX | 561.0 GWh | 16.1 mi |
Roadrunner, LLC Hybrid | McCamey, TX | 1.0 TWh | 3 mi |
Shamrock Wind | TBD, TX | 857.1 GWh | 42 mi |
Sherbino II | Ft. Stockton, TX | 533.6 GWh | 34 mi |
Upton County Solar | McCamey, TX | 309.5 GWh | 3.6 mi |
Woodward Mountain I | Girvin, TX | 175.7 GWh | 20.5 mi |
Woodward Mountain II | Girvin, TX | 168.8 GWh | 20.5 mi |