King Cove
10000 Windy Walkway, King Cove, AK 99612Plant Summary Information
King Cove is ranked #28 out of 33 hydroelectric power plants in Alaska in terms of total annual net electricity generation.
King Cove is comprised of 6 generators and generated 1.3 GWh during the 3-month period between September 2023 to December 2023.
Plant Name | King Cove |
---|---|
Utility Name | City of King Cove |
Location | Aleutians East Borough, AK |
Initial Operation Date | February 1980 |
Last Update | Dec 2023 |
Annual Generation | 4.5 GWh |
Annual Consumption | 23.5 k MMBtu |
Ranked #7,883 out of 11,852 Power Plants Nationwide | |
Ranked #1,234 out of 1,371 Water Power Plants Nationwide | |
Ranked #70 out of 130 Alaska Power Plants | |
Ranked #28 out of 33 Alaska Water Power Plants | |
Fuel Types | Water : 79.9% Distillate Fuel Oil : 20.1% |
Map of King Cove
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for King Cove.
Monthly Net Generation for King Cove
King Cove Details
Summary Information | |
---|---|
Plant Name | King Cove (7493) |
Plant Address | 10000 Windy Walkway, King Cove, AK 99612 |
Utility | City of King Cove (9897) |
Latitude, Longitude | 55.06168, -162.3103 |
Generation Dates on File | Jan 2005 to Dec 2023 |
Initial Operation Date | February 1980 |
Annual Generation | 4.5 GWh |
Fuel Types | Water : 79.9% Distillate Fuel Oil : 20.1% |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Regulated |
NERC Region | |
Balancing Authority | () |
NAICS Code | Utilities (22) |
Sector | Electric Utility (1) |
Water Source | Delta Creek |
Ash Impoundment | No |
Transmission / Distribution Owner | City of King Cove (9897) AK |
Grid Voltage | 480.00 kV |
Energy Storage | No |
Generator 1 Details Operating February 1980
Technology | All Other |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Single Owner |
Nameplate Capacity | 0.3 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 0.3 MW |
Winter Capacity | 0.3 MW |
Minimum Load | 0.2 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | February 1980 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Other Fuel |
Solid Fuel Gasification | No |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Cofire Fuels | No |
Generator 5 Details Operating February 1980
Technology | Petroleum Liquids |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Single Owner |
Nameplate Capacity | 0.3 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 0.3 MW |
Winter Capacity | 0.3 MW |
Minimum Load | 0.2 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | February 1980 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Distillate Fuel Oil |
Solid Fuel Gasification | No |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Cofire Fuels | No |
Generator 2 Details Operating January 1986
Technology | Petroleum Liquids |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Single Owner |
Nameplate Capacity | 0.5 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 0.4 MW |
Winter Capacity | 0.4 MW |
Minimum Load | 0.2 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | January 1986 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Distillate Fuel Oil |
Solid Fuel Gasification | No |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Cofire Fuels | No |
Generator 3 Details Operating June 1992
Technology | All Other |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Single Owner |
Nameplate Capacity | 0.7 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 0.6 MW |
Winter Capacity | 0.6 MW |
Minimum Load | 0.6 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | June 1992 |
---|---|
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Other Fuel |
Solid Fuel Gasification | No |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator 4 Details Operating February 1995
Technology | Conventional Hydroelectric |
---|---|
Prime Mover | Hydroelectric Turbine |
Ownership | Single Owner |
Nameplate Capacity | 0.8 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 0.7 MW |
Winter Capacity | 0.2 MW |
Minimum Load | 0.6 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | February 1995 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Water |
Solid Fuel Gasification | No |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Generator 6 Details Operating August 2017
Technology | Conventional Hydroelectric |
---|---|
Prime Mover | Hydroelectric Turbine |
Ownership | Single Owner |
Nameplate Capacity | 0.4 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 0.4 MW |
Winter Capacity | 0.4 MW |
Minimum Load | 0.2 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | August 2017 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Water |
Time From Cold Shutdown To Full Load | 10M |
King Cove Plant Owners
Owner Name | Address | Generator | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Water.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#1224 | Diamond Island Plant | Watertown, NY | 3.8 GWh |
#1225 | Cascade Dam | Grand Rapids, MI | 3.8 GWh |
#1226 | Lateral 10 Ventures | Buhl, ID | 3.8 GWh |
#1227 | Waterloo Hydroelectric Project | Waterloo, NY | 3.8 GWh |
#1228 | Constantine | Constantine, MI | 3.8 GWh |
#1229 | Boyds Mill Hydro | Ware Shoals, SC | 3.8 GWh |
#1230 | Yaleville | Norfolk, NY | 3.7 GWh |
#1231 | Upper Pacolet Hydro | Pacolet, SC | 3.7 GWh |
#1232 | El Dorado Hydro Elk Creek | New Meadows, ID | 3.6 GWh |
#1233 | Clifton Dam 3 Power Station | Converse, SC | 3.6 GWh |
#1235 | Queens Creek | Topton, NC | 3.6 GWh |
#1236 | Ottauquechee Hydro | N. Hartland, VT | 3.5 GWh |
#1237 | Mascoma Hydro | W. Lebanon, NH | 3.5 GWh |
#1238 | Tenth Street | Norwich, CT | 3.5 GWh |
#1239 | Luray Hydro Station | Luray, VA | 3.5 GWh |
#1240 | Flambeau Crowley Rapids Project | Park Falls, WI | 3.5 GWh |
#1241 | Deer Island Treatment Plant | Winthrop, MA | 37.3 GWh |
#1242 | French Paper Hydro | Niles, MI | 3.4 GWh |
#1243 | Last Chance | Grace, ID | 3.4 GWh |
#1244 | Boltonville Hydro Associates | Boltonville, VT | 3.4 GWh |
Nearby Power Plants
Below are closest 1 power plants surrounding King Cove.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Sand Point | Sand Point, AK | 3.3 GWh | 74 mi |