Keys Energy Center
10322 North Keys Road, Brandywine, MD 20613Plant Summary Information
Keys Energy Center is ranked #2 out of 179 power plants in Maryland in terms of total annual net electricity generation.
Keys Energy Center is comprised of 3 generators and generated 1.4 TWh during the 3-month period between June 2024 to September 2024.
Plant Name | Keys Energy Center |
---|---|
Utility Name | PSEG Keys Energy Center, LLC |
Location | Prince George's County, MD |
Initial Operation Date | July 2018 |
Last Update | Sep 2024 |
Annual Generation | 4.8 TWh |
Annual Consumption | 36.8 M MMBtu |
Ranked #224 out of 11,852 Power Plants Nationwide | |
Ranked #112 out of 2,254 Natural Gas Power Plants Nationwide | |
Ranked #2 out of 179 Maryland Power Plants | |
Ranked #1 out of 18 Maryland Natural Gas Power Plants | |
Fuel Types | Natural Gas |
Map of Keys Energy Center
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Keys Energy Center.
Monthly Net Generation for Keys Energy Center
Keys Energy Center Details
Summary Information | |
---|---|
Plant Name | Keys Energy Center (60302) |
Plant Address | 10322 North Keys Road, Brandywine, MD 20613 |
Utility | PSEG Keys Energy Center, LLC (60100) |
Latitude, Longitude | 38.69552, -76.82779 |
Generation Dates on File | Jul 2018 to Sep 2024 |
Initial Operation Date | July 2018 |
Annual Generation | 4.8 TWh |
Fuel Types | Natural Gas |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | RFC |
Balancing Authority | PJM Interconnection, LLC (PJM) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | Mataponi Creek |
Ash Impoundment | No |
Transmission / Distribution Owner | Potomac Electric Power Co (15270) MD |
Grid Voltage | 525.00 kV |
Energy Storage | No |
Natural Gas Information | |
Pipeline Name | DOMINION TRANSMISSION INCORPORATED |
Pipeline Notes | The current pipeline connection has been changed from Dominion to Eastern Gas Transmission and Storage Co. |
Natural Gas Storage | No |
Generator 10 Details Operating July 2018
Technology | Natural Gas Fired Combined Cycle |
---|---|
Prime Mover | Combined Cycle Steam Part |
Unit Code | CC1 |
Ownership | Single Owner |
Duct Burners | Yes |
RTO ISO LMP Node Designation | CHELTENH 19 KV STG10 GEN |
Nameplate Capacity | 359.6 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 763 MW |
Winter Capacity | 799 MW |
Minimum Load | 280 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | July 2018 |
Combined Heat & Power | No |
---|---|
Sector Name | IPP Non-CHP (2) |
Energy Source | Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 12H |
Subcritical Technology | No |
Planned Net Summer Capacity Uprate | 3 MW |
Planned Net Winter Capacity Uprate | 3 MW |
Planned Uprate | December 2026 |
Other Planned Modifications | No |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator 11 Details Operating July 2018
Technology | Natural Gas Fired Combined Cycle |
---|---|
Prime Mover | Combined Cycle Combustion Turbine Part |
Unit Code | CC1 |
Ownership | Single Owner |
Can Bypass Heat Recovery Steam Generator | Yes |
RTO ISO LMP Node Designation | CHELTENH 19 KV STG10 GEN |
Nameplate Capacity | 235.5 MW |
Nameplate Power Factor | 0.85 |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | July 2018 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Natural Gas |
---|---|
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 1H |
Planned Net Summer Capacity Uprate | 20 MW |
Planned Net Winter Capacity Uprate | 20 MW |
Planned Uprate | December 2026 |
Other Planned Modifications | Yes |
Other Modifications | October 2027 |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator 12 Details Operating July 2018
Technology | Natural Gas Fired Combined Cycle |
---|---|
Prime Mover | Combined Cycle Combustion Turbine Part |
Unit Code | CC1 |
Ownership | Single Owner |
Can Bypass Heat Recovery Steam Generator | Yes |
RTO ISO LMP Node Designation | CHELTENH 19 KV STG10 GEN |
Nameplate Capacity | 235.5 MW |
Nameplate Power Factor | 0.85 |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | July 2018 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Natural Gas |
---|---|
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 1H |
Planned Net Summer Capacity Uprate | 20 MW |
Planned Net Winter Capacity Uprate | 20 MW |
Planned Uprate | December 2026 |
Other Planned Modifications | Yes |
Other Modifications | October 2027 |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Keys Energy Center Plant Owners
Owner Name | Address | Generator | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Natural Gas.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#102 | Brandy Branch | Baldwin, FL | 5.1 TWh |
#103 | Rio Nogales Power Project | Seguin, TX | 5.0 TWh |
#104 | Pasadena Cogeneration | Pasadena, TX | 5.0 TWh |
#105 | Ouachita | Sterlington, LA | 5.0 TWh |
#106 | TVA Southaven Combined Cycle | Southaven, MS | 5.0 TWh |
#107 | Plaquemine Cogeneration Plant | Plaquemine, LA | 5.0 TWh |
#108 | CPV Valley Energy Center | Wawayanda, NY | 5.0 TWh |
#109 | Redbud Power Plant | Luther, OK | 4.9 TWh |
#110 | H L Culbreath Bayside Power Station | Tampa, FL | 4.9 TWh |
#111 | Jasper | Hardeeville, SC | 4.9 TWh |
#113 | West Riverside Energy Center | Beloit, WI | 4.8 TWh |
#114 | Caledonia | Steens, MS | 4.8 TWh |
#115 | Potomac Energy Center, LLC | Leesburg, VA | 4.8 TWh |
#116 | High Desert Power Plant | Victorville, CA | 4.6 TWh |
#117 | Tenaska Virginia Generating Station | Scottsville, VA | 4.6 TWh |
#118 | Lowman Energy Center | Leroy, AL | 4.6 TWh |
#119 | Dynegy Moss Landing Power Plant Hybrid | Moss Landing, CA | 4.5 TWh |
#120 | Kiamichi Energy Facility | Kiowa, OK | 4.6 TWh |
#121 | Batesville Generation Facility | Batesville, MS | 4.6 TWh |
#122 | Formosa Utility Venture Ltd | Point Comfort, TX | 4.6 TWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Keys Energy Center.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Bluefin Origination 1 | Brandywine, MD | 3.8 GWh | 2.5 mi |
Brandywine Power Facility | Brandywine, MD | 545.5 GWh | 2.9 mi |
Chalk Point Power | Aquasco, MD | 979.6 GWh | 12.9 mi |
Chalk Point Steam | Aquasco, MD | 1.2 GWh | 12.9 mi |
CPV St Charles Energy Center | Waldorf, MD | 3.9 TWh | 9.4 mi |
First Baptist Church of Glenarden | Upper Marlboro, MD | 2.8 GWh | 8.9 mi |
Herbert Farm Solar | Hughesville, MD | 7.6 GWh | 10.5 mi |
Holly Spring Meadows | District Heights, MD | 656.0 MWh | 12.4 mi |
Kirby Road Solar, LLC | Clinton, MD | 2.6 GWh | 7.7 mi |
MNCPPC Randall Farm | Upper Marlboro, MD | 2.4 GWh | 9.5 mi |
NRG Chalk Point CT | Aquasco, MD | 704.0 MWh | 12.9 mi |
OER Monarch CSG | Upper Marlboro, MD | 3.4 GWh | 7.5 mi |
OER Patuxent CSG | Lothian, MD | 4.2 GWh | 12.6 mi |
Oxon Run CREF | Washington, DC | 3.2 GWh | 12.9 mi |
Rockfish Solar LLC | Waldorf, MD | 14.6 GWh | 7.6 mi |
Sol Phoenix | Capitol Heights, MD | 4.0 GWh | 12.5 mi |
Synergen Panorama, LLC CSG | Fort Washington, MD | 8.1 GWh | 9.5 mi |
Upper Marlboro 1 CSG | Upper Marlboro, MD | 2.8 GWh | 6.6 mi |
WMATA - Naylor Rd. Metro | Temple Hills, MD | 29.0 MWh | 12.8 mi |
WMATA - S. Ave. Carport (East) (CSG) | Hillcrest Heights, MD | 956.0 MWh | 12.8 mi |