Kettleman Solar Project
15300 North Tully Road, Lodi, CA 95220Plant Summary Information
Kettleman Solar Project is ranked #559 out of 799 solar farms in California in terms of total annual net electricity generation.
Kettleman Solar Project generated 458.0 MWh during the 3-month period between September 2023 to December 2023.
Plant Name | Kettleman Solar Project |
---|---|
Utility Name | Ecos Energy LLC |
Location | San Joaquin County, CA |
Initial Operation Date | April 2014 |
Last Update | Dec 2023 |
Annual Generation | 2.7 GWh |
Annual Consumption | 9.6 k MMBtu |
Ranked #9,250 out of 11,852 Power Plants Nationwide | |
Ranked #4,075 out of 5,655 Solar Power Plants Nationwide | |
Ranked #1,279 out of 1,570 California Power Plants | |
Ranked #559 out of 799 California Solar Power Plants | |
Fuel Types | Solar |
Map of Kettleman Solar Project
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Kettleman Solar Project.
Monthly Net Generation for Kettleman Solar Project
Kettleman Solar Project Details
Summary Information | |
---|---|
Plant Name | Kettleman Solar Project (58510) |
Plant Address | 15300 North Tully Road, Lodi, CA 95220 |
Utility | Ecos Energy LLC (58135) |
Latitude, Longitude | 38.12139, -121.14122 |
Generation Dates on File | Apr 2014 to Dec 2023 |
Initial Operation Date | April 2014 |
Annual Generation | 2.7 GWh |
Fuel Types | Solar |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | Yes |
FERC Small Power Producer Docket Number | QF13-649 |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | WECC |
Balancing Authority | California Independent System Operator (CISO) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | |
Ash Impoundment | |
Transmission / Distribution Owner | Pacific Gas & Electric Co (14328) CA |
Grid Voltage | 12.00 kV |
Energy Storage | No |
Generator PV5 Details Operating April 2014
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Single Owner |
Nameplate Capacity | 1 MW |
Summer Capacity | 1 MW |
Winter Capacity | 1 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | April 2014 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Solar |
Solid Fuel Gasification | No |
Solar Details | |
Single Axis Tracking | Yes |
---|---|
Fixed Tilt | Yes |
Azimuth Angle | 180 |
Tilt Angle | 20 |
DC Net Capacity | 1.4 MW |
Crystalline Silicon | Yes |
Net Metering Agreement | No |
Virtual Net Metering Agreement | No |
Kettleman Solar Project Plant Owners
Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#4065 | SCS West Fairchild 011958 Danville, LLC | Danville, IL | 2.7 GWh |
#4066 | CCBC-Catonsville | Catonsville, MD | 2.7 GWh |
#4067 | Syncarpha Halifax Hybrid CSG | Halifax, MA | 2.7 GWh |
#4068 | Hopkinton CSG | Hopkinton, MA | 2.7 GWh |
#4069 | Phoenix Airport Rental Car Center | Phoenix, AZ | 2.7 GWh |
#4070 | Division 1 | Lancaster, CA | 2.7 GWh |
#4071 | Onyx - Lamphear Road CSG | Rome, NY | 2.7 GWh |
#4072 | Deer Creek 2 | Shingle Springs, CA | 2.7 GWh |
#4073 | Freeman Avenue | Andersonville, GA | 2.7 GWh |
#4074 | Westminster | Westminster, VT | 2.7 GWh |
#4076 | West Bridgewater AB CSG | West Bridgewater, MA | 2.7 GWh |
#4077 | Onyx - Saratoga Springs Landfill Solar CSG | Saratoga Springs, NY | 2.7 GWh |
#4078 | L-8 Solar Project | Palmdale, CA | 2.7 GWh |
#4079 | Prologis L.P | Tracy, CA | 2.7 GWh |
#4080 | Google Moffett Park Solar Project | Sunnyvale, CA | 2.7 GWh |
#4081 | Fall River Solar CSG | Fall River, MA | 2.7 GWh |
#4082 | Villa Roma Rd #2 | Delaware, NY | 2.7 GWh |
#4083 | Newton Rumford Landfill | Newton, MA | 2.7 GWh |
#4084 | Town of Uxbridge MA at Commerce Dr | Uxbridge, MA | 2.7 GWh |
#4085 | Regal Ware | West Bend, WI | 2.7 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Kettleman Solar Project.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Amazon - Stockton - Roof (SCK1) - (CA) | Stockton, CA | 3.6 GWh | 14.8 mi |
Ameresco San Joaquin | Linden, CA | 30.9 GWh | 13.1 mi |
Bear Creek Solar | Lodi, CA | 3.9 GWh | 1.1 mi |
Camanche | Clements & Wallace, CA | 58.1 GWh | 9.7 mi |
Combustion Turbine Project No 2 | Lodi, CA | 6.6 GWh | 13.6 mi |
Cosumnes | Herald, CA | 3.8 TWh | 15 mi |
Donaghy-Stockton | Stockton, CA | 2.3 GWh | 14.9 mi |
Foothill Sanitary Landfill - Solar Array | Linden, CA | 8.2 GWh | 12.5 mi |
Lodi | Lodi, CA | 546.0 MWh | 8.8 mi |
Lodi Energy Center | Lodi, CA | 829.1 GWh | 13.6 mi |
Rancho Seco Solar, LLC | Herald, CA | 13.3 GWh | 15.2 mi |
RE McKenzie 1 LLC | Galt, CA | 11.6 GWh | 15.1 mi |
RE McKenzie 2 LLC | Galt, CA | 11.5 GWh | 15.1 mi |
RE McKenzie 3 LLC | Galt, CA | 11.6 GWh | 15.1 mi |
RE McKenzie 4 LLC | Galt, CA | 11.5 GWh | 15.1 mi |
RE McKenzie 5 LLC | Galt, CA | 11.4 GWh | 15.1 mi |
RE McKenzie 6 LLC | Galt, CA | 11.4 GWh | 15.1 mi |
SMUD at Fleshman | Galt, CA | 4.1 GWh | 13.4 mi |
SMUD at Van Conett | Galt, CA | 1.3 GWh | 11.8 mi |
University of the Pacific | Stockton, CA | 6.2 GWh | 13.5 mi |