Kettering Solar 2
45060 1/4 3rd St E, Lancaster, CA 93534Plant Summary Information
Kettering Solar 2 is ranked #672 out of 799 solar farms in California in terms of total annual net electricity generation.
Kettering Solar 2 generated 346.0 MWh during the 3-month period between September 2023 to December 2023.
Plant Name | Kettering Solar 2 |
---|---|
Utility Name | Tesla Inc. |
Location | Los Angeles County, CA |
Initial Operation Date | June 2014 |
Last Update | Dec 2023 |
Annual Generation | 1.7 GWh |
Annual Consumption | 5.9 k MMBtu |
Ranked #10,310 out of 11,852 Power Plants Nationwide | |
Ranked #4,981 out of 5,655 Solar Power Plants Nationwide | |
Ranked #1,410 out of 1,570 California Power Plants | |
Ranked #672 out of 799 California Solar Power Plants | |
Fuel Types | Solar |
Previous Operator |
SolarCity Corporation (2013 to 2015) Tesla Inc. (2016 to 2023) |
Map of Kettering Solar 2
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Kettering Solar 2.
Monthly Net Generation for Kettering Solar 2
Kettering Solar 2 Details
Summary Information | |
---|---|
Plant Name | Kettering Solar 2 (59099) |
Plant Address | 45060 1/4 3rd St E, Lancaster, CA 93534 |
Utility | Tesla Inc. (57313) |
Latitude, Longitude | 34.70028, -118.12361 |
Generation Dates on File | Jun 2014 to Dec 2023 |
Initial Operation Date | June 2014 |
Annual Generation | 1.7 GWh |
Fuel Types | Solar |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | WECC |
Balancing Authority | California Independent System Operator (CISO) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | |
Ash Impoundment | No |
Transmission / Distribution Owner | Southern California Edison Co (17609) CA |
Grid Voltage | 0.48 kV |
Energy Storage | No |
Generator PV1 Details Operating June 2014
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Wholly Owned by Other Entity |
Nameplate Capacity | 1 MW |
Summer Capacity | 1 MW |
Winter Capacity | 1 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | June 2014 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Solar |
Solar Details | |
Fixed Tilt | Yes |
---|---|
Azimuth Angle | 180 |
Tilt Angle | 15 |
DC Net Capacity | 1.1 MW |
Crystalline Silicon | Yes |
Net Metering Agreement | Yes |
Net Metering DC Capacity | 1.1 MW |
Virtual Net Metering Agreement | No |
Kettering Solar 2 Plant Owners
Owner Name | Address | Ownership |
---|---|---|
Mound Solar Owner X, LLC | 6800 Dumbarton Circle, Fremont, CA 94555 | 100.00% |
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#4971 | Lilly Lane | Charlton, MA | 1.7 GWh |
#4972 | 6685 Santa Barbara Ct | Elkridge, MD | 1.7 GWh |
#4973 | Sunderland Solar PV | Sunderland, MA | 1.7 GWh |
#4974 | Farley Road Community Solar | Dudley, MA | 1.7 GWh |
#4975 | Dudley River Solar, LLC CSG | Southbridge, MA | 1.7 GWh |
#4976 | Bizer Creek | Getzville, NY | 1.7 GWh |
#4977 | Barton Acres Solar, LLC CSG | Phillipston, MA | 1.7 GWh |
#4978 | FastSun 19 CSG | Farmington, MN | 1.7 GWh |
#4979 | FastSun 14 CSG | Eagle Lake, MN | 1.7 GWh |
#4980 | Decatur Co. Solar RES (IN) | Greensburg, IN | 1.7 GWh |
#4982 | Lancaster Solar 1 | Lancaster, CA | 1.7 GWh |
#4983 | ALDI DC 2 | South Windsor, CT | 1.7 GWh |
#4984 | Johnston Solar | Town of Johnston, RI | 1.6 GWh |
#4985 | Huneke II CSG | Zumbrota, MN | 1.6 GWh |
#4986 | Jordan Energy-DFA Middlebury Center Plan | Middlebury Center, PA | 1.6 GWh |
#4987 | Geneseo | Geneseo, IL | 7.5 GWh |
#4988 | Dudley River 2 Solar, LLC CSG | Southbridge, MA | 1.6 GWh |
#4989 | Haleon York RDC Solar Facility | York, PA | 1.6 GWh |
#4990 | Clinton Solar | Griswold, CT | 1.6 GWh |
#4991 | Samuel Mickle School | Mickleton, NJ | 1.6 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Kettering Solar 2.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Arrache 4006 | Palmdale, CA | 2.4 GWh | 5.2 mi |
Arrache 4013 | Palmdale, CA | 1.4 GWh | 5.3 mi |
Arrache 8083 | Palmdale, CA | 3.2 GWh | 5.1 mi |
CSP Los Angeles | Lancaster, CA | 5.6 GWh | 5.9 mi |
Division 1 | Lancaster, CA | 2.7 GWh | 0.7 mi |
Division 2 | Lancaster, CA | 1.2 GWh | 0.7 mi |
Division 3 | Lancaster, CA | 1.5 GWh | 0.7 mi |
Foundation CDCR LAC | Lancaster, CA | 4.2 GWh | 5.6 mi |
Green Beanworks D PV | Palmdale, CA | 6.3 GWh | 3.9 mi |
Kettering Solar 1 | Lancaster, CA | 1.6 GWh | 0 mi |
Lancaster Baptist Church | Lancaster, CA | 957.0 MWh | 3.7 mi |
Lancaster Solar 1 | Lancaster, CA | 1.7 GWh | 1.9 mi |
Lancaster Solar 2 | Lancaster, CA | 2.6 GWh | 2.5 mi |
Ma | Lancaster, CA | 4.2 GWh | 3.5 mi |
Morgan Lancaster 1 | Lancaster, CA | 688.0 MWh | 3.6 mi |
Rutan | Palmdale, CA | 2.6 GWh | 4.5 mi |
SEPV Sierra | Lancaster, CA | 14.5 GWh | 2.4 mi |
Solar Oasis LLC | Palmdale, CA | 51.3 GWh | 4.4 mi |
US-TOPCO (Soccer Center) | Lancaster, CA | 7.0 GWh | 3.6 mi |
Vinam | Lancaster, CA | 3.1 GWh | 4.1 mi |