Kern River 3
15115 Sierra Way, Kernville, CA 93238Plant Summary Information
Kern River 3 is ranked #57 out of 222 hydroelectric power plants in California in terms of total annual net electricity generation.
Kern River 3 is comprised of 2 generators and generated 41.7 GWh during the 3-month period between September 2023 to December 2023.
Plant Name | Kern River 3 |
---|---|
Utility Name | Southern California Edison Co |
Location | Kern County, CA |
Initial Operation Date | March 1921 |
Last Update | Dec 2023 |
Annual Generation | 184.5 GWh |
Annual Consumption | 649.1 k MMBtu |
Ranked #2,414 out of 11,852 Power Plants Nationwide | |
Ranked #231 out of 1,371 Water Power Plants Nationwide | |
Ranked #275 out of 1,570 California Power Plants | |
Ranked #57 out of 222 California Water Power Plants | |
Fuel Types | Water |
Map of Kern River 3
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Kern River 3.
Monthly Net Generation for Kern River 3
Kern River 3 Details
Summary Information | |
---|---|
Plant Name | Kern River 3 (339) |
Plant Address | 15115 Sierra Way, Kernville, CA 93238 |
Utility | Southern California Edison Co (17609) |
Latitude, Longitude | 35.77619, -118.43623 |
Generation Dates on File | Jan 2001 to Dec 2023 |
Initial Operation Date | March 1921 |
Annual Generation | 184.5 GWh |
Fuel Types | Water |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Regulated |
NERC Region | WECC |
Balancing Authority | California Independent System Operator (CISO) |
NAICS Code | Utilities (22) |
Sector | Electric Utility (1) |
Water Source | Kern River |
Ash Impoundment | |
Transmission / Distribution Owner | Southern California Edison Co (17609) CA |
Grid Voltage | 66.00 kV |
Energy Storage | No |
Generator 2 Details Operating March 1921
Technology | Conventional Hydroelectric |
---|---|
Prime Mover | Hydroelectric Turbine |
Ownership | Single Owner |
Nameplate Capacity | 19.8 MW |
Nameplate Power Factor | 0.9 |
Summer Capacity | 19.7 MW |
Winter Capacity | 19.7 MW |
Minimum Load | 0.8 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | March 1921 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Water |
Solid Fuel Gasification | No |
Time From Cold Shutdown To Full Load | 10M |
Generator 1 Details Operating May 1921
Technology | Conventional Hydroelectric |
---|---|
Prime Mover | Hydroelectric Turbine |
Ownership | Single Owner |
Nameplate Capacity | 20.5 MW |
Nameplate Power Factor | 0.9 |
Summer Capacity | 20.5 MW |
Winter Capacity | 20.5 MW |
Minimum Load | 0.8 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | May 1921 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Water |
Solid Fuel Gasification | No |
Time From Cold Shutdown To Full Load | 10M |
Kern River 3 Plant Owners
Owner Name | Address | Generator | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Water.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#221 | Eklutna Hydro Project | Palmer, AK | 197.8 GWh |
#222 | H Neely Henry Dam | Ohatchee, AL | 196.7 GWh |
#223 | Pit 1 | Burney, CA | 195.3 GWh |
#224 | Wilder | Hartford, VT | 192.4 GWh |
#225 | John C Boyle | Keno, OR | 192.0 GWh |
#226 | Vernon Dam | Vernon, VT | 190.6 GWh |
#227 | Cowlitz Falls | Randle, WA | 190.4 GWh |
#228 | Carmen Smith | McKenzie Bridge, OR | 188.6 GWh |
#229 | Lower Salmon | Hagerman, ID | 187.9 GWh |
#230 | Nantahala | Topton, NC | 186.1 GWh |
#232 | Balch 1 | Balch Camp, CA | 184.4 GWh |
#233 | Weiss Dam | Leesburg, AL | 183.2 GWh |
#234 | Pardee | Valley Springs, CA | 181.6 GWh |
#235 | Cheatham | Ashland City, TN | 177.3 GWh |
#236 | Charles E Monty | Lewiston, ME | 176.6 GWh |
#237 | Fremont Canyon | Alcova, WY | 176.3 GWh |
#238 | Osage Dam | Eldon, MO | 176.1 GWh |
#239 | Little Falls (WA) | Ford, WA | 175.8 GWh |
#240 | New Martinsville Hannibal Hydro | New Martinsville, WV | 173.4 GWh |
#241 | Colton | Pierrepont, NY | 171.8 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Kern River 3.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Bear Mountain Limited | Bakersfield, CA | 41.9 GWh | 37 mi |
Castle Rock Vineyards | Delano, CA | 1.7 GWh | 37.8 mi |
CED Ducor 1 | Ducor, CA | 47.7 GWh | 35.8 mi |
CED Ducor 2 | Ducor, CA | 47.2 GWh | 35.7 mi |
CED Ducor 3 | Ducor, CA | 36.1 GWh | 35.1 mi |
CED Ducor 4 | Ducor, CA | 46.9 GWh | 33.5 mi |
Isabella Hydro Project | Lake Isabella, CA | 3.2 GWh | 9.5 mi |
Kern River 1 | Bakersfield, CA | 167.0 GWh | 29.1 mi |
Kern River Eastridge Cogen | Bakersfield, CA | 225.3 GWh | 37.5 mi |
Luciana | Richgrove, CA | 127.7 GWh | 35.2 mi |
Mt Poso Cogeneration | Bakersfield, CA | 267.8 GWh | 34.8 mi |
Nicolis Solar PV Plant | Delano, CA | 43.8 GWh | 35 mi |
North Sky River Energy LLC | Weldon, CA | 386.6 GWh | 32.8 mi |
Porterville 6 and 7 | Porterville, CA | 3.2 GWh | 37.7 mi |
Redcrest Solar Farm | Edison, CA | 28.0 GWh | 37.9 mi |
Rio Bravo Hydro Project | Bakersfield, CA | 30.7 GWh | 32.3 mi |
Sky River Wind Energy Center | Tehachapi, CA | 201.6 GWh | 37.2 mi |
Tropico Solar PV Plant | Delano, CA | 30.0 GWh | 34.9 mi |
Tulare Success Power Project | Porterville, CA | 538.0 MWh | 33.6 mi |
White River Solar 2 | Alpaugh, CA | 49.3 GWh | 34.8 mi |