Kerckhoff 2
Smally Road, Auberry, CA 93602Plant Summary Information
Kerckhoff 2 is ranked #25 out of 222 hydroelectric power plants in California in terms of total annual net electricity generation.
Kerckhoff 2 is comprised of 1 generator and generated 119.0 GWh during the 3-month period between June 2024 to September 2024.
Plant Name | Kerckhoff 2 |
---|---|
Utility Name | Pacific Gas & Electric Co. |
Location | Fresno County, CA |
Initial Operation Date | May 1983 |
Last Update | Sep 2024 |
Annual Generation | 389.8 GWh |
Annual Consumption | 1.3 M MMBtu |
Ranked #1,537 out of 11,852 Power Plants Nationwide | |
Ranked #120 out of 1,371 Water Power Plants Nationwide | |
Ranked #111 out of 1,570 California Power Plants | |
Ranked #25 out of 222 California Water Power Plants | |
Fuel Types | Water |
Previous Operator |
Pacific Gas & Electric Co (2013 to 2016) Pacific Gas & Electric Co. (2017 to 2023) |
Map of Kerckhoff 2
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Kerckhoff 2.
Monthly Net Generation for Kerckhoff 2
Kerckhoff 2 Details
Summary Information | |
---|---|
Plant Name | Kerckhoff 2 (682) |
Plant Address | Smally Road, Auberry, CA 93602 |
Utility | Pacific Gas & Electric Co. (14328) |
Latitude, Longitude | 37.07185, -119.55801 |
Generation Dates on File | Jan 2001 to Sep 2024 |
Initial Operation Date | May 1983 |
Annual Generation | 389.8 GWh |
Fuel Types | Water |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Regulated |
NERC Region | WECC |
Balancing Authority | California Independent System Operator (CISO) |
NAICS Code | Utilities (22) |
Sector | Electric Utility (1) |
Water Source | San Joaquin River |
Ash Impoundment | No |
Transmission / Distribution Owner | Pacific Gas & Electric Co (14328) CA |
Grid Voltage | 115.00 kV |
Energy Storage | No |
Generator 1 Details Operating May 1983
Technology | Conventional Hydroelectric |
---|---|
Prime Mover | Hydroelectric Turbine |
Ownership | Single Owner |
RTO ISO LMP Node Designation | KERCKHOF_7_B1 |
RTO ISO Location Designation For Reporting Wholesale Sales Data | KERCKHOF_7_B1 |
Nameplate Capacity | 139.5 MW |
Nameplate Power Factor | 0.9 |
Summer Capacity | 155 MW |
Winter Capacity | 155 MW |
Minimum Load | 5 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | May 1983 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Water |
Solid Fuel Gasification | No |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Kerckhoff 2 Plant Owners
Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Water.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#110 | Ross | Rockport, WA | 407.9 GWh |
#111 | Comerford | Monroe, NH | 405.1 GWh |
#112 | Bartletts Ferry | Salem, AL | 397.0 GWh |
#113 | Thompson Falls | Thompson Falls, MT | 396.3 GWh |
#114 | Bradley Lake | Homer, AK | 395.1 GWh |
#115 | Rainbow (MT) | Great Falls, MT | 394.9 GWh |
#116 | Markland | Florence, IN | 394.7 GWh |
#117 | Cabot | Montague, MA | 394.4 GWh |
#118 | Big Creek 1 | Big Creek, CA | 393.8 GWh |
#119 | Curtis Palmer Hydroelectric | Corinth, NY | 393.2 GWh |
#121 | Box Canyon | Ione, WA | 383.5 GWh |
#122 | Hartwell Lake | Hartwell, GA | 378.9 GWh |
#123 | Parker Dam | Parker, CA | 378.4 GWh |
#124 | Keswick | Redding, CA | 377.6 GWh |
#125 | C J Strike | Bruneau, ID | 377.1 GWh |
#126 | James B Black | Big Bend, CA | 376.5 GWh |
#127 | Trinity | Weaverville, CA | 370.5 GWh |
#128 | Old Hickory | Hendersonville, TN | 368.7 GWh |
#129 | Smithland Hydroelectric Plant | Smithland, KY | 368.4 GWh |
#130 | Pit 5 | Big Bend, CA | 368.3 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Kerckhoff 2.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
A G Wishon | North Fork, CA | 16.1 GWh | 6.2 mi |
Big Creek 1 | Big Creek, CA | 393.8 GWh | 19.8 mi |
Big Creek 2 | Auberry, CA | 296.2 GWh | 16.4 mi |
Big Creek 2A | Auberry, CA | 536.5 GWh | 16.4 mi |
Big Creek 3 | Auberry, CA | 745.8 GWh | 10.8 mi |
Big Creek 4 | North Fork, CA | 428.0 GWh | 6 mi |
Big Creek 8 | Auberry, CA | 152.9 GWh | 15.8 mi |
Clovis East High School | Clovis, CA | 1.4 GWh | 19.4 mi |
Clovis High School | Clovis, CA | 1.3 GWh | 18.9 mi |
Clovis North High School | Fresno, CA | 1.4 GWh | 16 mi |
CSU Fresno Solar Project | Fresno, CA | 1.1 GWh | 20.8 mi |
Fresno Hoover High School Hybrid | Fresno, CA | 2.1 GWh | 21.1 mi |
Friant Hydro Facility | Friant, CA | 106.2 GWh | 9.5 mi |
J S Eastwood | Shaver Lake, CA | 22.1 GWh | 17.4 mi |
Mammoth Pool | North Fork, CA | 520.8 GWh | 15.9 mi |
Pine Flat | Piedra, CA | 485.0 GWh | 20.9 mi |
Saint Agnes Medical Center | Fresno, CA | 25.5 GWh | 20 mi |
San Joaquin 2 | North Fork, CA | 1.5 GWh | 9.7 mi |
SCCCD - Clovis Community College | Fresno, CA | 2.0 GWh | 16.1 mi |
Site 980 65 | Madera, CA | 6.3 GWh | 18.9 mi |