Kayenta Solar Project
Adjacent to US Route 163, Kayenta, AZ 86504Plant Summary Information
Kayenta Solar Project is ranked #19 out of 99 solar farms in Arizona in terms of total annual net electricity generation.
Kayenta Solar Project generated 21.3 GWh during the 3-month period between December 2023 to March 2024.
Plant Name | Kayenta Solar Project |
---|---|
Utility Name | NGI-Kayenta Solar Lessor I, LLC |
Location | Navajo County, AZ |
Initial Operation Date | May 2017 |
Last Update | Mar 2024 |
Annual Generation | 107.5 GWh |
Annual Consumption | 366.7 k MMBtu |
Ranked #3,044 out of 11,249 Power Plants Nationwide | |
Ranked #497 out of 5,158 Solar Power Plants Nationwide | |
Ranked #56 out of 150 Arizona Power Plants | |
Ranked #19 out of 99 Arizona Solar Power Plants | |
Fuel Types | Solar |
Map of Kayenta Solar Project
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Kayenta Solar Project.
Monthly Net Generation for Kayenta Solar Project
Kayenta Solar Project Details
Summary Information | |
---|---|
Plant Name | Kayenta Solar Project (61268) |
Plant Address | Adjacent to US Route 163 Kayenta, AZ 86504 |
Utility | NGI-Kayenta Solar Lessor I, LLC (60879) |
Latitude, Longitude | 36.77194, -110.26389 |
Generation Dates on File | May 2017 to Mar 2024 |
Initial Operation Date | May 2017 |
Annual Generation | 107.5 GWh |
Fuel Types | Solar |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | WECC |
Balancing Authority | Western Area Power Administration - Desert Southwest Region (WALC) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | |
Ash Impoundment | No |
Transmission / Distribution Owner | Navajo Tribal Utility Authority (13314) AZ |
Grid Voltage | 400.00 kV / 24.90 kV / 69.00 kV |
Energy Storage | No |
Generator PV1 Details Operating May 2017
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Single Owner |
Nameplate Capacity | 27.3 MW |
Summer Capacity | 27.3 MW |
Winter Capacity | 27.3 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | May 2017 |
---|---|
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Solar |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Multiple Fuels | No |
Solar Details | |
Single Axis Tracking | Yes |
---|---|
Azimuth Angle | 90 |
Tilt Angle | 50 |
DC Net Capacity | 37.6 MW |
Crystalline Silicon | Yes |
Net Metering Agreement | No |
Virtual Net Metering Agreement | No |
Generator PV2 Details Operating August 2019
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Single Owner |
Nameplate Capacity | 28 MW |
Summer Capacity | 28 MW |
Winter Capacity | 28 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | August 2019 |
---|---|
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Solar |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Multiple Fuels | No |
Solar Details | |
Single Axis Tracking | Yes |
---|---|
Azimuth Angle | 90 |
Tilt Angle | 50 |
DC Net Capacity | 38.7 MW |
Crystalline Silicon | Yes |
Net Metering Agreement | No |
Virtual Net Metering Agreement | No |
Kayenta Solar Project Plant Owners
Owner Name | Address | Generator | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#487 | Brightside | Beeville, TX | 111.2 GWh |
#488 | Marshall Solar Energy Project | Marshall, MN | 111.2 GWh |
#489 | Monroe Solar Facility | Monroe, NC | 110.6 GWh |
#490 | Brantley Solar | Spring Hope, NC | 109.9 GWh |
#491 | Hooper Solar | Mosca, CO | 109.8 GWh |
#492 | Bullock Solar, LLC | Manson, NC | 109.1 GWh |
#493 | Titan Solar | Deer Trail, CO | 108.4 GWh |
#494 | RE Gaskell West 2 LLC | Rosamond, CA | 108.2 GWh |
#495 | Assembly Solar Project | Venice Township, MI | 107.7 GWh |
#496 | Stanly Solar, LLC | Albemarle, NC | 107.7 GWh |
#498 | Innovative Solar 54 | Kinston, NC | 107.4 GWh |
#499 | Pavant Solar, LLC | Fillmore, UT | 106.6 GWh |
#500 | Elevation Solar C | Lancaster, CA | 106.1 GWh |
#501 | Eastover Solar | Eastover, SC | 105.9 GWh |
#502 | Grange Hall Solar | Wimauma, FL | 105.7 GWh |
#503 | Edwards Sanborn S1 | Mojave, CA | 102.8 GWh |
#504 | Meherrin Solar | Skippers, VA | 105.5 GWh |
#505 | Pearl Solar | Fort Stockton, TX | 105.1 GWh |
#506 | Vancourt Solar Interconnections | La Feria, TX | 105.0 GWh |
#507 | Iris Solar LLC | Franklinton, LA | 103.2 GWh |
Nearby Power Plants
Below are closest 10 power plants surrounding Kayenta Solar Project.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Boulder | Boulder, UT | 20.1 GWh | 105.8 mi |
Cholla | Joseph City, AZ | 2.0 TWh | 126.6 mi |
City of Gallup Solar | Gallup, NM | 14.9 GWh | 119.7 mi |
Four Corners | Fruitland, NM | 8.3 TWh | 98.9 mi |
Glen Canyon Dam | Page, AZ | 3.8 TWh | 68.4 mi |
Latigo Wind Park | Monticello, UT | 163.7 GWh | 91.4 mi |
McPhee | Cortez, CO | 867.8 MWh | 108.3 mi |
Red Mesa Solar Project | Red Mesa, UT | 192.7 GWh | 52.9 mi |
SMPA Solar 1 Community Solar | Bedrock, CO | 2.0 GWh | 131.6 mi |
Towaoc | Cortez, CO | 8.0 GWh | 103.6 mi |