Juniper Solar (FL)
41795 Deems Road, Zephyrhills, FL 33540Plant Summary Information
Juniper Solar (FL) is ranked #93 out of 171 solar farms in Florida in terms of total annual net electricity generation.
Juniper Solar (FL) generated 42.7 GWh during the 3-month period between May 2024 to August 2024.
Plant Name | Juniper Solar (FL) |
---|---|
Utility Name | Tampa Electric Co |
Location | Pasco County, FL |
Initial Operation Date | December 2023 |
Last Update | Aug 2024 |
Annual Generation | 116.9 GWh |
Annual Consumption | 398.8 k MMBtu |
Ranked #2,993 out of 11,835 Power Plants Nationwide | |
Ranked #528 out of 5,643 Solar Power Plants Nationwide | |
Ranked #167 out of 279 Florida Power Plants | |
Ranked #93 out of 171 Florida Solar Power Plants | |
Fuel Types | Solar |
Map of Juniper Solar (FL)
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Juniper Solar (FL).
Monthly Net Generation for Juniper Solar (FL)
Juniper Solar (FL) Details
Summary Information | |
---|---|
Plant Name | Juniper Solar (FL) (65683) |
Plant Address | 41795 Deems Road, Zephyrhills, FL 33540 |
Utility | Tampa Electric Co (18454) |
Latitude, Longitude | 28.18157, -82.15533 |
Generation Dates on File | Dec 2023 to Aug 2024 |
Initial Operation Date | December 2023 |
Annual Generation | 116.9 GWh |
Fuel Types | Solar |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Regulated |
NERC Region | SERC |
Balancing Authority | Tampa Electric Company (TEC) |
NAICS Code | Utilities (22) |
Sector | Electric Utility (1) |
Water Source | |
Ash Impoundment | |
Transmission / Distribution Owner | Tampa Electric Co (18454) FL |
Grid Voltage | 69.00 kV |
Energy Storage | No |
Generator 1 Details Operating December 2023
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Single Owner |
Nameplate Capacity | 70 MW |
Nameplate Power Factor | 0.95 |
Summer Capacity | 70 MW |
Winter Capacity | 70 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | December 2023 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Solar |
Solar Details | |
Single Axis Tracking | Yes |
---|---|
Fixed Tilt | No |
Azimuth Angle | 180 |
DC Net Capacity | 85.6 MW |
Thin Film CDTE | Yes |
Net Metering Agreement | No |
Virtual Net Metering Agreement | No |
Juniper Solar (FL) Plant Owners
Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#518 | Ranchland Solar, LLC | Moyock, NC | 118.4 GWh |
#519 | Hooper Solar | Mosca, CO | 118.3 GWh |
#520 | Laurel Oaks Solar | Plant City, FL | 118.3 GWh |
#521 | Fort Drum Energy Center | Vero Beach, FL | 118.1 GWh |
#522 | FPL Flowers Creek Solar Energy Center | Altha, FL | 118.1 GWh |
#523 | Orchard | Ft. Pierce, FL | 118.0 GWh |
#524 | Borden Solar Farm | Madera, CA | 117.8 GWh |
#525 | RE Camelot LLC | Mojave, CA | 117.6 GWh |
#526 | Little Bear 5 | Mendota, CA | 117.5 GWh |
#527 | Debary Solar Power Plant | DeBary, FL | 117.3 GWh |
#529 | Sweetbay Solar Center | North of Indiantown, FL | 116.6 GWh |
#530 | OE_MS6 | St.Artesia, MS | 114.9 GWh |
#531 | OE_GA3 | Camilla, GA | 116.0 GWh |
#532 | Pioneer Trail Solar Energy Center | New Smyrna Beach, FL | 115.6 GWh |
#533 | Macho Springs | Deming, NM | 115.5 GWh |
#534 | Terrill Creek | Green Cove Springs, FL | 114.9 GWh |
#535 | LA3 West Baton Rouge Solar Facility | West Baton Rouge, LA | 114.3 GWh |
#536 | SEGS IX | Hinkley, CA | 114.2 GWh |
#537 | Antelope DSR 1 | Lancaster, CA | 114.2 GWh |
#538 | Nestlewood Solar | Hamersville, OH | 114.1 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Juniper Solar (FL).
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Bartow Solar Energy LLC | Bartow, FL | 12.7 GWh | 27.1 mi |
Bonnie Mine Solar | Bartow, FL | 56.2 GWh | 22.6 mi |
C D McIntosh Jr | Lakeland, FL | 2.5 TWh | 15.8 mi |
Cutrale Citrus Juices USA II | Auburndale, FL | 33.4 GWh | 23.5 mi |
Dover Solar | Dover, FL | 42.3 GWh | 15.8 mi |
Goldfinch | Lakeland, FL | 2.2 GWh | 15.4 mi |
H L Culbreath Bayside Power Station | Tampa, FL | 4.9 TWh | 25 mi |
Hillsborough County Resource Recovery | Tampa, FL | 178.9 GWh | 19.3 mi |
IKEA Tampa 042 | Tampa, FL | 1.5 GWh | 23.1 mi |
Lakeland Electric Co. (FL)-Airport 1 | Lakeland, FL | 2.0 GWh | 14.9 mi |
Larsen Memorial | Lakeland, FL | 237.6 GWh | 16.8 mi |
Laurel Oaks Solar | Plant City, FL | 118.3 GWh | 18.4 mi |
LKL BLBD, LLC | Lakeland, FL | 8.1 GWh | 11.6 mi |
Magnolia Solar | Mulberry, FL | 136.5 GWh | 19.4 mi |
McKay Bay Facility | Tampa, FL | 69.8 GWh | 22.8 mi |
Mosaic Co Bartow Facility | Bartow, FL | 122.0 GWh | 23.8 mi |
Mosaic Co Tampa Facility | Riverview, FL | 133.7 GWh | 26.4 mi |
Mosaic New Wales Operations | Mulberry, FL | 413.0 GWh | 24.9 mi |
Mountain View Solar (FL) | Dade City, FL | 102.9 GWh | 15.5 mi |
Osprey Energy Center Power Plant | Auburndale, FL | 2.5 TWh | 23 mi |