Jumbo Hill Wind Project
8404 SW 100, Andrews, TX 79714Plant Summary Information
Jumbo Hill Wind Project is ranked #76 out of 218 wind farms in Texas in terms of total annual net electricity generation.
Jumbo Hill Wind Project generated 136.1 GWh during the 3-month period between July 2024 to October 2024.
Plant Name | Jumbo Hill Wind Project |
---|---|
Utility Name | Engie North America |
Location | Andrews County, TX |
Initial Operation Date | March 2020 |
Last Update | Oct 2024 |
Annual Generation | 595.8 GWh |
Annual Consumption | 2.2 M MMBtu |
Ranked #1,109 out of 11,866 Power Plants Nationwide | |
Ranked #255 out of 1,345 Wind Power Plants Nationwide | |
Ranked #200 out of 758 Texas Power Plants | |
Ranked #76 out of 218 Texas Wind Power Plants | |
Fuel Types | Wind |
Map of Jumbo Hill Wind Project
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Jumbo Hill Wind Project.
Monthly Net Generation for Jumbo Hill Wind Project
Jumbo Hill Wind Project Details
Summary Information | |
---|---|
Plant Name | Jumbo Hill Wind Project (62630) |
Plant Address | 8404 SW 100, Andrews, TX 79714 |
Utility | Engie North America (56201) |
Latitude, Longitude | 32.386, -102.949 |
Generation Dates on File | Apr 2020 to Oct 2024 |
Initial Operation Date | March 2020 |
Annual Generation | 595.8 GWh |
Fuel Types | Wind |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | TRE |
Balancing Authority | Electric Reliability Council of Texas, Inc. (ERCO) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | |
Ash Impoundment | |
Transmission / Distribution Owner | Oncor Electric Delivery Company LLC (44372) TX |
Grid Voltage | 138.00 kV |
Energy Storage | No |
Generator WTGS1 Details Operating March 2020
Technology | Onshore Wind Turbine |
---|---|
Prime Mover | Wind Turbine, Onshore |
Ownership | Wholly Owned by Other Entity |
Nameplate Capacity | 160.7 MW |
Summer Capacity | 160.7 MW |
Winter Capacity | 160.7 MW |
Minimum Load | 2.8 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | March 2020 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Wind |
Turbines/Hydrokinetic Buoys | 57 |
Turbine Details | |
Number Of Turbines | 57 |
---|---|
Predominant Turbine Manufacturer | GE |
Predominant Turbine Model Number | 2.82-127 |
Design Wind Speed | 17.7 MPH |
Wind Quality Class | 2 - Medium Wind |
Turbine Hub Height Feet | 290 |
Jumbo Hill Wind Project Plant Owners
Owner Name | Address | Ownership |
---|---|---|
Jumbo Hill Wind Project, LLC | 1990 Post Oak BLVD., Suite 1900, Houston, TX 77056 | 100.00% |
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Wind.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#245 | Solano Wind | Rio Vista, CA | 612.1 GWh |
#246 | Frontier Windpower II | Blackwell, OK | 610.8 GWh |
#247 | South Plains Wind Phase I | Floydada, TX | 610.2 GWh |
#248 | King Creek Wind Farm 2, LLC | Throckmorton, TX | 609.5 GWh |
#249 | Bison 4 Wind Energy Center | New Salem, ND | 608.4 GWh |
#250 | Sweetwater Wind 4 LLC | Roscoe, TX | 606.1 GWh |
#251 | Golden Hill Wind | Wasco, OR | 604.1 GWh |
#252 | Tatanka Ridge | Toronto, SD | 603.3 GWh |
#253 | El Algodon Alto Wind Farm, LLC | Mathis, TX | 602.4 GWh |
#254 | Foxtail Wind, LLC | Forbes, ND | 596.0 GWh |
#256 | North Hurlburt Wind LLC | Arlington, OR | 595.3 GWh |
#257 | Chapman Ranch Wind I | Corpus Christi, TX | 595.2 GWh |
#258 | Pattern Panhandle Wind 2 LLC | Panhandle, TX | 595.1 GWh |
#259 | Cedar Springs II | Douglas, WY | 593.8 GWh |
#260 | South Hurlburt Wind LLC | Arlington, OR | 593.8 GWh |
#261 | Cedar Creek II | New Raymer, CO | 593.3 GWh |
#262 | Limestone Wind Project | Coolidge, TX | 593.1 GWh |
#263 | Limon Wind I | Limon, CO | 592.2 GWh |
#264 | Raymond Wind Farm, LLC | Lyford, TX | 591.9 GWh |
#265 | Astra Wind Farm | Happy, TX | 591.8 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Jumbo Hill Wind Project.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
2W Permian Solar Project Hybrid | Andrews, TX | 900.6 GWh | 30.8 mi |
Bakke | Andrews, TX | 877.0 MWh | 24.7 mi |
Cunningham | Hobbs, NM | 1.8 TWh | 32.6 mi |
Ector County Energy Center | Goldsmith, TX | 425.6 GWh | 30.5 mi |
Frankel | Andrews, TX | 645.0 MWh | 9.7 mi |
Goldsmith | Goldsmith, TX | 670.0 MWh | 33.8 mi |
Hobbs Generating Station | Hobbs, NM | 3.2 TWh | 31.6 mi |
Lapetus | Andrews, TX | 189.1 GWh | 16.9 mi |
Maddox | Hobbs, NM | 702.0 GWh | 30.6 mi |
Mustang Station | Denver City, TX | 2.3 TWh | 42.3 mi |
Notrees Windpower Hybrid | Goldsmith, TX | 242.3 GWh | 27.9 mi |
Oxy Renewable Energy - Goldsmith | Goldsmith, TX | 42.7 GWh | 32.3 mi |
Phoebe Solar | Kermit, TX | 512.7 GWh | 37.8 mi |
Prospero Solar | Andrews, TX | 747.3 GWh | 9.3 mi |
Prospero Solar II | Andrews, TX | 677.2 GWh | 9.7 mi |
SPS1 Dollarhide | Jal, NM | 22.1 GWh | 21 mi |
SPS2 Jal | Jal, NM | 18.9 GWh | 19.6 mi |
SPS3 Lea | Eunice, NM | 23.0 GWh | 22.6 mi |
SPS4 Monument | Monument, NM | 22.3 GWh | 29.1 mi |
Tumbleweed | Andrews, TX | 903.0 MWh | 23 mi |