Jordan Hydroelectric Project
2080 Jordan Dam Road, Moncure, NC 27559Plant Summary Information
Jordan Hydroelectric Project is ranked #29 out of 36 hydroelectric power plants in North Carolina in terms of total annual net electricity generation.
Jordan Hydroelectric Project is comprised of 2 generators and generated 1.3 GWh during the 3-month period between September 2022 to December 2022.
Plant Name | Jordan Hydroelectric Project |
---|---|
Utility Name | Jordan Hydroelectric LTD PTP |
Location | Chatham County, NC |
Initial Operation Date | January 2012 |
Last Update | Dec 2022 |
Annual Generation | 5.2 GWh |
Annual Consumption | 22.9 k MMBtu |
Ranked #7,593 out of 11,852 Power Plants Nationwide | |
Ranked #1,150 out of 1,371 Water Power Plants Nationwide | |
Ranked #661 out of 863 North Carolina Power Plants | |
Ranked #29 out of 36 North Carolina Water Power Plants | |
Fuel Types | Water |
Map of Jordan Hydroelectric Project
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Jordan Hydroelectric Project.
Monthly Net Generation for Jordan Hydroelectric Project
Jordan Hydroelectric Project Details
Summary Information | |
---|---|
Plant Name | Jordan Hydroelectric Project (58390) |
Plant Address | 2080 Jordan Dam Road, Moncure, NC 27559 |
Utility | Jordan Hydroelectric LTD PTP (58378) |
Latitude, Longitude | 35.65472, -79.06833 |
Generation Dates on File | Jan 2013 to Dec 2022 |
Initial Operation Date | January 2012 |
Annual Generation | 5.2 GWh |
Fuel Types | Water |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | Yes |
FERC Small Power Producer Docket Number | 97101000 |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | SERC |
Balancing Authority | Duke Energy Carolinas (DUK) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | B.E. Jordan Lake |
Ash Impoundment | No |
Transmission / Distribution Owner | Duke Energy Carolinas, LLC (5416) NC |
Grid Voltage | 23.00 kV |
Energy Storage | No |
Generator EMOD Details OA January 2012
Technology | Conventional Hydroelectric |
---|---|
Prime Mover | Hydroelectric Turbine |
Ownership | Single Owner |
Nameplate Capacity | 2.2 MW |
Nameplate Power Factor | 0.9 |
Summer Capacity | 2.2 MW |
Winter Capacity | 2.2 MW |
Minimum Load | 0.2 MW |
Uprate/Derate Completed | No |
Status | OA |
---|---|
First Operation Date | January 2012 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Water |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Generator WMOD Details OA August 2012
Technology | Conventional Hydroelectric |
---|---|
Prime Mover | Hydroelectric Turbine |
Ownership | Single Owner |
Nameplate Capacity | 2.2 MW |
Nameplate Power Factor | 0.9 |
Summer Capacity | 2.2 MW |
Winter Capacity | 2.2 MW |
Minimum Load | 0.2 MW |
Uprate/Derate Completed | No |
Status | OA |
---|---|
First Operation Date | August 2012 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Water |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Jordan Hydroelectric Project Plant Owners
Owner Name | Address | Generator | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Water.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#1140 | Tannery Island Power | Carthage, NY | 5.4 GWh |
#1141 | Drop 1 | Holtville, CA | 5.4 GWh |
#1142 | McPhee | Cortez, CO | 5.4 GWh |
#1143 | Crystal Falls | Crystal Falls, MI | 5.4 GWh |
#1144 | Stiles | Oconto Falls, WI | 5.4 GWh |
#1145 | Newport Hydro | Newport, NY | 5.3 GWh |
#1146 | Cosgrove Intake and Power Station | Clinton, MA | 5.3 GWh |
#1147 | Matilda Hamilton Fee Hydroelectric Station | Ravenna, KY | 5.3 GWh |
#1148 | Ottumwa City of | Ottumwa, IA | 5.3 GWh |
#1149 | Big Thompson | Loveland, CO | 5.3 GWh |
#1151 | Mt Ida Hydroelectric | Troy, NY | 5.2 GWh |
#1152 | Port Leyden Hydroelectric Project | Port Leyden, NY | 5.2 GWh |
#1153 | Perris | Perris, CA | 5.2 GWh |
#1154 | Lower Beaver Falls Project | Beaver Falls, NY | 5.2 GWh |
#1155 | Messalonskee 5 | Waterville, ME | 5.1 GWh |
#1156 | Thundermist Hydro | Providence, RI | 5.1 GWh |
#1157 | Lake Mathews | Riverside, CA | 5.1 GWh |
#1158 | Foothills Hydro Plant | Littleton, CO | 5.1 GWh |
#1159 | Tallassee Hydro Project | Clarke, GA | 5.1 GWh |
#1160 | Alice Falls Hydro Project | Keeseville, NY | 5.0 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Jordan Hydroelectric Project.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
1025 Traveller Solar, LLC | Sanford, NC | 8.9 GWh | 16 mi |
Arborgate Solar | Pittsboro, NC | 9.6 GWh | 5.2 mi |
Balsam | Sanford, NC | 8.8 GWh | 14.8 mi |
Boaz Farm Solar | Sanford, NC | 8.9 GWh | 13.4 mi |
Broadway Road Solar, LLC | Sanford, NC | 4.0 GWh | 13.7 mi |
Cohen Farm Solar, LLC | Sanford, NC | 9.7 GWh | 9.8 mi |
Cotten Farm, LLC | Sanford, NC | 9.6 GWh | 11.4 mi |
Cougar Solar, LLC | Sanford, NC | 637.0 MWh | 14.7 mi |
Elm Solar, LLC | Sanford, NC | 9.4 GWh | 15.5 mi |
Farrington Farm | Chapel Hill, NC | 1.5 GWh | 12.5 mi |
Flatwood Farm | Moncure, NC | 9.0 GWh | 5 mi |
Harris | New Hill, NC | 7.7 TWh | 6.5 mi |
Kathleen Solar | Fuquay Varina, NC | 10.0 GWh | 17.8 mi |
Meadowlark Solar | Dunn, NC | 9.5 GWh | 7.5 mi |
Moncure Farm LLC | Moncure, NC | 6.1 GWh | 6.3 mi |
Sweetgum Solar | Sanford, NC | 9.2 GWh | 15 mi |
Tinker (NC) | Moncure, NC | 7.1 GWh | 4.5 mi |
Univ of NC Chapel Hill Cogen Facility | Chapel Hill, NC | 45.6 GWh | 17.4 mi |
Vickers | Chapel Hill, NC | 3.7 GWh | 11.7 mi |
Wake County LFG Facility | Apex, NC | 57.9 GWh | 12.1 mi |