Jonesboro City Water & Light Plant
1400 Hanley Drive, Jonesboro, AR 72403Plant Summary Information
Jonesboro City Water & Light Plant is ranked #35 out of 71 power plants in Arkansas in terms of total annual net electricity generation.
Jonesboro City Water & Light Plant is comprised of 5 generators and generated 34.6 GWh during the 3-month period between September 2022 to December 2022.
Plant Name | Jonesboro City Water & Light Plant |
---|---|
Utility Name | City Water and Light Plant |
Location | Craighead County, AR |
Initial Operation Date | July 1999 |
Last Update | Dec 2022 |
Annual Generation | 100.9 GWh |
Annual Consumption | 1.1 M MMBtu |
Ranked #3,123 out of 11,249 Power Plants Nationwide | |
Ranked #910 out of 2,188 Natural Gas Power Plants Nationwide | |
Ranked #35 out of 71 Arkansas Power Plants | |
Ranked #10 out of 21 Arkansas Natural Gas Power Plants | |
Fuel Types | Natural Gas : 98.6% Distillate Fuel Oil : 1.4% |
Map of Jonesboro City Water & Light Plant
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Jonesboro City Water & Light Plant.
Monthly Net Generation for Jonesboro City Water & Light Plant
Jonesboro City Water & Light Plant Details
Summary Information | |
---|---|
Plant Name | Jonesboro City Water & Light Plant (56505) |
Plant Address | 1400 Hanley Drive Jonesboro, AR 72403 |
Utility | City Water and Light Plant (9879) |
Latitude, Longitude | 35.84856, -90.72538 |
Generation Dates on File | Jan 2006 to Dec 2022 |
Initial Operation Date | July 1999 |
Annual Generation | 100.9 GWh |
Fuel Types | Natural Gas : 98.6% Distillate Fuel Oil : 1.4% |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Regulated |
NERC Region | SERC |
Balancing Authority | Midcontinent Independent Transmission System Operator, Inc.. (MISO) |
NAICS Code | Utilities (22) |
Sector | Electric Utility (1) |
Water Source | Municipality |
Ash Impoundment | No |
Transmission / Distribution Owner | City Water and Light Plant (9879) AR |
Grid Voltage | 69.00 kV |
Energy Storage | No |
Natural Gas Information | |
Local Distribution Company (LDC) | Other - See pipeline notes. |
Pipeline Name |
Other - Please explain in pipeline notes below. Other - Please explain in pipeline notes below. Other - Please explain in pipeline notes below. |
Pipeline Notes | No connections to LDC |
Natural Gas Storage | No |
Generator SN01 Details Operating July 1999
Technology | Natural Gas Fired Combustion Turbine |
---|---|
Prime Mover | Combustion Turbine |
Ownership | Single Owner |
RTO ISO LMP Node Designation | EAI.CWL_A |
Nameplate Capacity | 24.5 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 20 MW |
Winter Capacity | 23 MW |
Minimum Load | 10 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | July 1999 |
---|---|
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Natural Gas / Distillate Fuel Oil |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 1H |
Multiple Fuels | Yes |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | Yes |
Multifuel Details | |
Switch When Operating | Yes |
---|---|
Net Summer Capacity With Natural Gas | 20 MW |
Net Winter Capacity With Natural Gas | 23 MW |
Net Summer Capacity With Oil | 20 MW |
Net Winter Capacity With Oil | 22 MW |
Time To Switch From Gas To Oil | 1H |
Time To Switch From Oil To Gas | 1H |
Factors That Limit Switching | Yes |
Storage Limits | Yes |
Air Permit Limits | Yes |
Generator SN02 Details Operating July 1999
Technology | Natural Gas Fired Combustion Turbine |
---|---|
Prime Mover | Combustion Turbine |
Ownership | Single Owner |
RTO ISO LMP Node Designation | EAI.CWL_B |
Nameplate Capacity | 21.4 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 19 MW |
Winter Capacity | 22 MW |
Minimum Load | 10 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | July 1999 |
---|---|
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Natural Gas / Distillate Fuel Oil |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 1H |
Multiple Fuels | Yes |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | Yes |
Multifuel Details | |
Switch When Operating | Yes |
---|---|
Net Summer Capacity With Natural Gas | 19 MW |
Net Winter Capacity With Natural Gas | 22 MW |
Net Summer Capacity With Oil | 19 MW |
Net Winter Capacity With Oil | 21.5 MW |
Time To Switch From Gas To Oil | 1H |
Time To Switch From Oil To Gas | 1H |
Factors That Limit Switching | Yes |
Storage Limits | Yes |
Air Permit Limits | Yes |
Generator SN04 Details Operating May 2000
Technology | Natural Gas Fired Combustion Turbine |
---|---|
Prime Mover | Combustion Turbine |
Ownership | Single Owner |
RTO ISO LMP Node Designation | EAI.CWL_C |
Nameplate Capacity | 60.5 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 46 MW |
Winter Capacity | 49 MW |
Minimum Load | 15 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | May 2000 |
---|---|
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Natural Gas / Distillate Fuel Oil |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 1H |
Multiple Fuels | Yes |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | Yes |
Multifuel Details | |
Switch When Operating | Yes |
---|---|
Net Summer Capacity With Natural Gas | 46 MW |
Net Winter Capacity With Natural Gas | 47.5 MW |
Net Summer Capacity With Oil | 46 MW |
Net Winter Capacity With Oil | 46.5 MW |
Time To Switch From Gas To Oil | 1H |
Time To Switch From Oil To Gas | 1H |
Factors That Limit Switching | Yes |
Storage Limits | Yes |
Air Permit Limits | Yes |
Generator SN06 Details Operating May 2003
Technology | Natural Gas Fired Combustion Turbine |
---|---|
Prime Mover | Combustion Turbine |
Ownership | Single Owner |
RTO ISO LMP Node Designation | EAI.CWL_D |
Nameplate Capacity | 57.4 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 46 MW |
Winter Capacity | 49 MW |
Minimum Load | 15 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | May 2003 |
---|---|
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Natural Gas / Distillate Fuel Oil |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 1H |
Multiple Fuels | Yes |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | Yes |
Multifuel Details | |
Switch When Operating | Yes |
---|---|
Net Summer Capacity With Natural Gas | 46 MW |
Net Winter Capacity With Natural Gas | 48.5 MW |
Net Summer Capacity With Oil | 46 MW |
Net Winter Capacity With Oil | 47.5 MW |
Time To Switch From Gas To Oil | 1H |
Time To Switch From Oil To Gas | 1H |
Factors That Limit Switching | Yes |
Storage Limits | Yes |
Air Permit Limits | Yes |
Generator SN07 Details Operating May 2007
Technology | Natural Gas Fired Combustion Turbine |
---|---|
Prime Mover | Combustion Turbine |
Ownership | Single Owner |
RTO ISO LMP Node Designation | EAI.CWL_E |
Nameplate Capacity | 60.5 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 46 MW |
Winter Capacity | 49 MW |
Minimum Load | 15 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | May 2007 |
---|---|
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 1H |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Jonesboro City Water & Light Plant Plant Owners
Owner Name | Address | Generator | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Natural Gas.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#900 | PCA, Filer City Mill | Filer City, MI | 102.4 GWh |
#901 | Indeck Olean Energy Center | Olean, NY | 102.6 GWh |
#902 | McCartney | Strafford, MO | 101.5 GWh |
#903 | Archbald Power Station | Archbald, PA | 114.2 GWh |
#904 | DeBary | DeBary, FL | 123.2 GWh |
#905 | Black Mountain Generating Station | Golden Valley, AZ | 101.2 GWh |
#906 | SJRR Power LLC | Houston, TX | 101.1 GWh |
#907 | Graphic Packaging International Augusta Mill | Augusta, GA | 433.2 GWh |
#908 | DeRidder Mill | DeRidder, LA | 444.0 GWh |
#909 | Nearman Creek | Kansas, KS | 857.4 GWh |
#911 | University Park South | University Park, IL | 99.1 GWh |
#912 | Energy Center Dover | Dover, DE | 99.0 GWh |
#913 | Purdue CHP | West Lafayette, IN | 98.6 GWh |
#914 | Mill Creek (SC) | Blacksburg, SC | 132.4 GWh |
#915 | Pixelle Specialty Solutions LLC - Spring Grove Facility | Spring Grove, PA | 444.7 GWh |
#916 | San Jacinto County Peaking Facility | Shepherd, TX | 97.4 GWh |
#917 | CML&P Generating Facility No. 2 | Coffeyville, KS | 97.2 GWh |
#918 | Mooreland | Mooreland, OK | 97.0 GWh |
#919 | Pio Pico Energy Center | San Diego, CA | 96.6 GWh |
#920 | Macon Energy Center | Macon, MO | 96.1 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Jonesboro City Water & Light Plant.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Allen | Memphis, TN | 6.3 TWh | 62.6 mi |
Big Cypress Solar, LLC | Crawfordsville, AR | 89.2 GWh | 42 mi |
Clay County Electrical Cooperative | Corning, AR | 2.2 GWh | 39.7 mi |
Craighead Electric Solar One | Brookland, AR | 2.3 GWh | 10.2 mi |
Dell Power Station | Dell, AR | 3.3 TWh | 39.2 mi |
Farmers Electric Cooperative | Newport, AR | 2.3 GWh | 32.1 mi |
Forrest City- Eldridge Road | Forrest City, AR | 2.2 GWh | 56.2 mi |
Forrest City- Prison Site | Forrest City, AR | 2.2 GWh | 60.2 mi |
Independence Steam Electric Station | Newark, AR | 5.7 TWh | 40.1 mi |
Kennett | Kennett, MO | 6.3 GWh | 46.1 mi |
Millington Solar Farm | Millington, TN | 112.5 GWh | 59.8 mi |
Newport Solar Project | Newport, AR | 139.7 GWh | 28.7 mi |
Paragould Reciprocating | Paragould, AR | 551.6 MWh | 17.1 mi |
Paragould Turbine | Paragould, AR | 156.4 MWh | 17.1 mi |
Plum Point Energy Station | Osceola, AR | 3.5 TWh | 45.4 mi |
SR Innovation - NIKE PV | Memphis, TN | 3.8 GWh | 57.2 mi |
St Francis Energy Facility | Campbell, MO | 1.3 TWh | 59.3 mi |
White River Lock and Dam 1 | Batesville, AR | 15.8 GWh | 51.5 mi |
White River Lock and Dam 2 | Locust Grove, AR | 15.8 GWh | 58.7 mi |
White River Lock and Dam 3 | Marcella, AR | 31.5 GWh | 63 mi |