Jonesboro City Water & Light Plant
1400 Hanley Drive, Jonesboro, AR 72403Plant Summary Information
Jonesboro City Water & Light Plant is ranked #40 out of 73 power plants in Arkansas in terms of total annual net electricity generation.
Jonesboro City Water & Light Plant is comprised of 5 generators and generated 10.0 GWh during the 3-month period between September 2023 to December 2023.
Plant Name | Jonesboro City Water & Light Plant |
---|---|
Utility Name | City Water and Light Plant |
Location | Craighead County, AR |
Initial Operation Date | July 1999 |
Last Update | Dec 2023 |
Annual Generation | 84.7 GWh |
Annual Consumption | 1.0 M MMBtu |
Ranked #3,356 out of 11,835 Power Plants Nationwide | |
Ranked #945 out of 2,253 Natural Gas Power Plants Nationwide | |
Ranked #40 out of 73 Arkansas Power Plants | |
Ranked #12 out of 22 Arkansas Natural Gas Power Plants | |
Fuel Types | Natural Gas |
Map of Jonesboro City Water & Light Plant
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Jonesboro City Water & Light Plant.
Monthly Net Generation for Jonesboro City Water & Light Plant
Jonesboro City Water & Light Plant Details
Summary Information | |
---|---|
Plant Name | Jonesboro City Water & Light Plant (56505) |
Plant Address | 1400 Hanley Drive, Jonesboro, AR 72403 |
Utility | City Water and Light Plant (9879) |
Latitude, Longitude | 35.84856, -90.72538 |
Generation Dates on File | Jan 2006 to Dec 2023 |
Initial Operation Date | July 1999 |
Annual Generation | 84.7 GWh |
Fuel Types | Natural Gas |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Regulated |
NERC Region | SERC |
Balancing Authority | Midcontinent Independent Transmission System Operator, Inc.. (MISO) |
NAICS Code | Utilities (22) |
Sector | Electric Utility (1) |
Water Source | Municipality |
Ash Impoundment | No |
Transmission / Distribution Owner | City Water and Light Plant (9879) AR |
Grid Voltage | 69.00 kV |
Energy Storage | No |
Natural Gas Information | |
Local Distribution Company (LDC) | Other - See pipeline notes. |
Pipeline Name |
Other - Please explain in pipeline notes below. Other - Please explain in pipeline notes below. Other - Please explain in pipeline notes below. |
Pipeline Notes | No connections to LDC |
Natural Gas Storage | No |
Generator SN01 Details Operating July 1999
Technology | Natural Gas Fired Combustion Turbine |
---|---|
Prime Mover | Combustion Turbine |
Ownership | Single Owner |
RTO ISO LMP Node Designation | EAI.CWL_A |
Nameplate Capacity | 24.5 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 20 MW |
Winter Capacity | 23 MW |
Minimum Load | 10 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | July 1999 |
---|---|
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Natural Gas / Distillate Fuel Oil |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 1H |
Multiple Fuels | Yes |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | Yes |
Multifuel Details | |
Switch When Operating | Yes |
---|---|
Net Summer Capacity With Natural Gas | 20 MW |
Net Winter Capacity With Natural Gas | 23 MW |
Net Summer Capacity With Oil | 20 MW |
Net Winter Capacity With Oil | 22 MW |
Time To Switch From Gas To Oil | 1H |
Time To Switch From Oil To Gas | 1H |
Factors That Limit Switching | Yes |
Storage Limits | Yes |
Air Permit Limits | Yes |
Generator SN02 Details Operating July 1999
Technology | Natural Gas Fired Combustion Turbine |
---|---|
Prime Mover | Combustion Turbine |
Ownership | Single Owner |
RTO ISO LMP Node Designation | EAI.CWL_B |
Nameplate Capacity | 21.4 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 19 MW |
Winter Capacity | 22 MW |
Minimum Load | 10 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | July 1999 |
---|---|
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Natural Gas / Distillate Fuel Oil |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 1H |
Multiple Fuels | Yes |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | Yes |
Multifuel Details | |
Switch When Operating | Yes |
---|---|
Net Summer Capacity With Natural Gas | 19 MW |
Net Winter Capacity With Natural Gas | 22 MW |
Net Summer Capacity With Oil | 19 MW |
Net Winter Capacity With Oil | 21.5 MW |
Time To Switch From Gas To Oil | 1H |
Time To Switch From Oil To Gas | 1H |
Factors That Limit Switching | Yes |
Storage Limits | Yes |
Air Permit Limits | Yes |
Generator SN04 Details Operating May 2000
Technology | Natural Gas Fired Combustion Turbine |
---|---|
Prime Mover | Combustion Turbine |
Ownership | Single Owner |
RTO ISO LMP Node Designation | EAI.CWL_C |
Nameplate Capacity | 60.5 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 46 MW |
Winter Capacity | 49 MW |
Minimum Load | 15 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | May 2000 |
---|---|
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Natural Gas / Distillate Fuel Oil |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 1H |
Multiple Fuels | Yes |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | Yes |
Multifuel Details | |
Switch When Operating | Yes |
---|---|
Net Summer Capacity With Natural Gas | 46 MW |
Net Winter Capacity With Natural Gas | 47.5 MW |
Net Summer Capacity With Oil | 46 MW |
Net Winter Capacity With Oil | 46.5 MW |
Time To Switch From Gas To Oil | 1H |
Time To Switch From Oil To Gas | 1H |
Factors That Limit Switching | Yes |
Storage Limits | Yes |
Air Permit Limits | Yes |
Generator SN06 Details Operating May 2003
Technology | Natural Gas Fired Combustion Turbine |
---|---|
Prime Mover | Combustion Turbine |
Ownership | Single Owner |
RTO ISO LMP Node Designation | EAI.CWL_D |
Nameplate Capacity | 57.4 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 46 MW |
Winter Capacity | 49 MW |
Minimum Load | 15 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | May 2003 |
---|---|
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Natural Gas / Distillate Fuel Oil |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 1H |
Multiple Fuels | Yes |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | Yes |
Multifuel Details | |
Switch When Operating | Yes |
---|---|
Net Summer Capacity With Natural Gas | 46 MW |
Net Winter Capacity With Natural Gas | 48.5 MW |
Net Summer Capacity With Oil | 46 MW |
Net Winter Capacity With Oil | 47.5 MW |
Time To Switch From Gas To Oil | 1H |
Time To Switch From Oil To Gas | 1H |
Factors That Limit Switching | Yes |
Storage Limits | Yes |
Air Permit Limits | Yes |
Generator SN07 Details Operating May 2007
Technology | Natural Gas Fired Combustion Turbine |
---|---|
Prime Mover | Combustion Turbine |
Ownership | Single Owner |
RTO ISO LMP Node Designation | EAI.CWL_E |
Nameplate Capacity | 60.5 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 46 MW |
Winter Capacity | 49 MW |
Minimum Load | 15 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | May 2007 |
---|---|
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 1H |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Jonesboro City Water & Light Plant Plant Owners
Owner Name | Address | Generator | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Natural Gas.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#935 | Wayne County | Goldsboro, NC | 90.7 GWh |
#936 | Clayville | Vineland, NJ | 87.4 GWh |
#937 | Macon Energy Center | Macon, MO | 87.3 GWh |
#938 | Howard Down | Vineland, NJ | 87.2 GWh |
#939 | Mooreland | Mooreland, OK | 86.8 GWh |
#940 | Ashdown | Ashdown, AR | 561.1 GWh |
#941 | Iowa State University | Ames, IA | 86.8 GWh |
#942 | Winchester Power Park | Winchester, TX | 86.2 GWh |
#943 | Pixelle Specialty Solutions LLC - Chillicothe Facility | Chillicothe, OH | 205.6 GWh |
#944 | Gravel Neck | Surry, VA | 89.3 GWh |
#946 | NASA Johnson Space Center CHP | Houston, TX | 84.5 GWh |
#947 | Sky Global Power One | Rock Island, TX | 83.7 GWh |
#948 | University Park South | University Park, IL | 83.4 GWh |
#949 | Wheatland Generating Facility | Wheatland, IN | 83.3 GWh |
#950 | CP Kelco San Diego Plant | San Diego, CA | 83.2 GWh |
#951 | Central Utility Plant at White Oak | Silver Spring, MD | 83.0 GWh |
#952 | West Marinette 34 | Peshtigo, WI | 82.9 GWh |
#953 | Paddys Run | Louisville, KY | 82.6 GWh |
#954 | Generate Colchester Fuel Cells, LLC | Colchester, CT | 82.3 GWh |
#955 | Pinelawn Power LLC | West Babylon, NY | 81.7 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Jonesboro City Water & Light Plant.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Big Cypress Solar, LLC | Crawfordsville, AR | 311.3 GWh | 42 mi |
Clay County Electrical Cooperative | Corning, AR | 2.3 GWh | 39.7 mi |
Craighead Electric Solar One | Brookland, AR | 2.3 GWh | 10.2 mi |
Crooked Lake Solar, LLC | Blytheville, AR | 161.0 GWh | 52.9 mi |
Dell Power Station | Dell, AR | 4.1 TWh | 39.2 mi |
Farmers Electric Cooperative | Newport, AR | 2.2 GWh | 32.1 mi |
Forrest City- Eldridge Road | Forrest City, AR | 2.1 GWh | 56.2 mi |
Forrest City- Prison Site | Forrest City, AR | 2.1 GWh | 60.2 mi |
Independence Steam Electric Station | Newark, AR | 5.9 TWh | 40.1 mi |
Kennett | Kennett, MO | 2.5 GWh | 46.1 mi |
Millington Solar Farm | Millington, TN | 100.0 GWh | 59.8 mi |
Newport Solar Project | Newport, AR | 330.0 GWh | 28.7 mi |
Paragould Reciprocating | Paragould, AR | 649.0 MWh | 17.1 mi |
Paragould Solar Farm | Paragould, AR | 3.3 GWh | 18.1 mi |
Paragould Turbine | Paragould, AR | 161.0 MWh | 17.1 mi |
Plum Point Energy Station | Osceola, AR | 3.0 TWh | 45.4 mi |
SR Innovation - NIKE PV | Memphis, TN | 3.5 GWh | 57.2 mi |
St Francis Energy Facility | Campbell, MO | 2.0 TWh | 59.3 mi |
White River Lock and Dam 1 | Batesville, AR | 15.2 GWh | 51.5 mi |
White River Lock and Dam 2 | Locust Grove, AR | 15.2 GWh | 58.7 mi |