Johnsonville

Hwy 70 PO Box 259, New Johnsonville, TN 37134

Plant Summary Information

Johnsonville is ranked #13 out of 84 power plants in Tennessee in terms of total annual net electricity generation.

Johnsonville is comprised of 20 generators and generated 298.9 GWh during the 3-month period between June 2024 to September 2024.

Plant NameJohnsonville
Utility NameTennessee Valley Authority
LocationHumphreys County, TN
Initial Operation DateOctober 1951
Last Update Sep 2024
Annual Generation 693.8 GWh
Annual Consumption 10.1 M MMBtu
Ranked #983 out of 11,852 Power Plants Nationwide
Ranked #503 out of 2,254 Natural Gas Power Plants Nationwide
Ranked #13 out of 84 Tennessee Power Plants
Ranked #4 out of 16 Tennessee Natural Gas Power Plants
Fuel Types Natural Gas : 99.5% Distillate Fuel Oil : 0.5%

Map of Johnsonville

Full Screen Map

Register Now for Comprehensive Access

Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Johnsonville.

Create Your Account Today

Monthly Net Generation for Johnsonville

Johnsonville Details

Summary Information
Plant NameJohnsonville (3406)
Plant AddressHwy 70 PO Box 259, New Johnsonville, TN 37134
UtilityTennessee Valley Authority (18642)
Latitude, Longitude36.0278, -87.9861
Generation Dates on FileJan 2001 to Sep 2024
Initial Operation DateOctober 1951
Annual Generation 693.8 GWh
Fuel Types Natural Gas : 99.5% Distillate Fuel Oil : 0.5%
 
Federal Energy Regulatory Commission (FERC) Information
FERC Cogeneration StatusNo
FERC Small Power Producer StatusNo
FERC Exempt Wholesale Generator StatusNo
Regulatory Information
Regulatory StatusRegulated
NERC RegionSERC
Balancing AuthorityTennessee Valley Authority (TVA)
NAICS CodeUtilities (22)
Sector Electric Utility (1)
Water SourceTennessee River
Ash Impoundment Yes   Not Lined   Operating
Transmission / Distribution OwnerTennessee Valley Authority (18642) TN
Grid Voltage 161.00 kV
Energy StorageNo
 
Natural Gas Information
Pipeline Name TENNESSEE GAS PIPELINE COMPANY
Natural Gas StorageNo

Generator G10 Details Operating June 1975

TechnologyNatural Gas Fired Combustion Turbine
Prime MoverCombustion Turbine
OwnershipSingle Owner
Nameplate Capacity68 MW
Nameplate Power Factor0.9
Summer Capacity47.1 MW
Winter Capacity62.5 MW
Minimum Load25 MW
Uprate/Derate Completed No
StatusOperating
First Operation DateJune 1975
Planned RetirementDecember 2024
Combined Heat & Power No
Sector NameElectric Utility (1)
Energy SourceNatural Gas / Distillate Fuel Oil
Solid Fuel Gasification No
Carbon Capture TechnologyNo
Time From Cold Shutdown To Full Load10M
Multiple FuelsYes
Cofire FuelsNo
Switch Between Oil And Natural GasYes
Multifuel Details
Switch When OperatingNo
Net Summer Capacity With Natural Gas47.1 MW
Net Winter Capacity With Natural Gas62.5 MW
Net Summer Capacity With Oil50.3 MW
Net Winter Capacity With Oil66.9 MW
Time To Switch From Gas To Oil1H
Time To Switch From Oil To Gas1H
Factors That Limit SwitchingYes
Air Permit LimitsYes

Generator G11 Details Operating June 1975

TechnologyNatural Gas Fired Combustion Turbine
Prime MoverCombustion Turbine
OwnershipSingle Owner
Nameplate Capacity68 MW
Nameplate Power Factor0.9
Summer Capacity47.1 MW
Winter Capacity62.5 MW
Minimum Load25 MW
Uprate/Derate Completed No
StatusOperating
First Operation DateJune 1975
Planned RetirementDecember 2024
Combined Heat & Power No
Sector NameElectric Utility (1)
Energy SourceNatural Gas / Distillate Fuel Oil
Solid Fuel Gasification No
Carbon Capture TechnologyNo
Time From Cold Shutdown To Full Load10M
Multiple FuelsYes
Cofire FuelsNo
Switch Between Oil And Natural GasYes
Multifuel Details
Switch When OperatingNo
Net Summer Capacity With Natural Gas47.1 MW
Net Winter Capacity With Natural Gas62.5 MW
Net Summer Capacity With Oil50.3 MW
Net Winter Capacity With Oil66.9 MW
Time To Switch From Gas To Oil1H
Time To Switch From Oil To Gas1H
Factors That Limit SwitchingYes
Air Permit LimitsYes

Generator G12 Details Operating June 1975

TechnologyNatural Gas Fired Combustion Turbine
Prime MoverCombustion Turbine
OwnershipSingle Owner
Nameplate Capacity68 MW
Nameplate Power Factor0.9
Summer Capacity47.1 MW
Winter Capacity62.5 MW
Minimum Load25 MW
Uprate/Derate Completed No
StatusOperating
First Operation DateJune 1975
Planned RetirementDecember 2024
Combined Heat & Power No
Sector NameElectric Utility (1)
Energy SourceNatural Gas / Distillate Fuel Oil
Solid Fuel Gasification No
Carbon Capture TechnologyNo
Time From Cold Shutdown To Full Load10M
Multiple FuelsYes
Cofire FuelsNo
Switch Between Oil And Natural GasYes
Multifuel Details
Switch When OperatingNo
Net Summer Capacity With Natural Gas47.1 MW
Net Winter Capacity With Natural Gas62.5 MW
Net Summer Capacity With Oil50.3 MW
Net Winter Capacity With Oil66.9 MW
Time To Switch From Gas To Oil1H
Time To Switch From Oil To Gas1H
Factors That Limit SwitchingYes
Air Permit LimitsYes

Generator G13 Details Operating June 1975

TechnologyNatural Gas Fired Combustion Turbine
Prime MoverCombustion Turbine
OwnershipSingle Owner
Nameplate Capacity68 MW
Nameplate Power Factor0.9
Summer Capacity47.1 MW
Winter Capacity62.5 MW
Minimum Load25 MW
Uprate/Derate Completed No
StatusOperating
First Operation DateJune 1975
Planned RetirementDecember 2024
Combined Heat & Power No
Sector NameElectric Utility (1)
Energy SourceNatural Gas / Distillate Fuel Oil
Solid Fuel Gasification No
Carbon Capture TechnologyNo
Time From Cold Shutdown To Full Load10M
Multiple FuelsYes
Cofire FuelsNo
Switch Between Oil And Natural GasYes
Multifuel Details
Switch When OperatingNo
Net Summer Capacity With Natural Gas47.1 MW
Net Winter Capacity With Natural Gas62.5 MW
Net Summer Capacity With Oil50.3 MW
Net Winter Capacity With Oil66.9 MW
Time To Switch From Gas To Oil1H
Time To Switch From Oil To Gas1H
Factors That Limit SwitchingYes
Air Permit LimitsYes

Generator G14 Details Operating June 1975

TechnologyNatural Gas Fired Combustion Turbine
Prime MoverCombustion Turbine
OwnershipSingle Owner
Nameplate Capacity68 MW
Nameplate Power Factor0.9
Summer Capacity47.1 MW
Winter Capacity62.5 MW
Minimum Load25 MW
Uprate/Derate Completed No
StatusOperating
First Operation DateJune 1975
Planned RetirementDecember 2024
Combined Heat & Power No
Sector NameElectric Utility (1)
Energy SourceNatural Gas / Distillate Fuel Oil
Solid Fuel Gasification No
Carbon Capture TechnologyNo
Time From Cold Shutdown To Full Load10M
Multiple FuelsYes
Cofire FuelsNo
Switch Between Oil And Natural GasYes
Multifuel Details
Switch When OperatingNo
Net Summer Capacity With Natural Gas47.1 MW
Net Winter Capacity With Natural Gas62.5 MW
Net Summer Capacity With Oil50.3 MW
Net Winter Capacity With Oil66.9 MW
Time To Switch From Gas To Oil1H
Time To Switch From Oil To Gas1H
Factors That Limit SwitchingYes
Air Permit LimitsYes

Generator G15 Details Operating June 1975

TechnologyNatural Gas Fired Combustion Turbine
Prime MoverCombustion Turbine
OwnershipSingle Owner
Nameplate Capacity68 MW
Nameplate Power Factor0.9
Summer Capacity47.1 MW
Winter Capacity62.5 MW
Minimum Load25 MW
Uprate/Derate Completed No
StatusOperating
First Operation DateJune 1975
Planned RetirementDecember 2024
Combined Heat & Power No
Sector NameElectric Utility (1)
Energy SourceNatural Gas / Distillate Fuel Oil
Solid Fuel Gasification No
Carbon Capture TechnologyNo
Time From Cold Shutdown To Full Load10M
Multiple FuelsYes
Cofire FuelsNo
Switch Between Oil And Natural GasYes
Multifuel Details
Switch When OperatingNo
Net Summer Capacity With Natural Gas47.1 MW
Net Winter Capacity With Natural Gas62.5 MW
Net Summer Capacity With Oil50.3 MW
Net Winter Capacity With Oil66.9 MW
Time To Switch From Gas To Oil1H
Time To Switch From Oil To Gas1H
Factors That Limit SwitchingYes
Air Permit LimitsYes

Generator G16 Details Operating June 1975

TechnologyNatural Gas Fired Combustion Turbine
Prime MoverCombustion Turbine
OwnershipSingle Owner
Nameplate Capacity68 MW
Nameplate Power Factor0.9
Summer Capacity47.1 MW
Winter Capacity62.5 MW
Minimum Load25 MW
Uprate/Derate Completed No
StatusOperating
First Operation DateJune 1975
Planned RetirementDecember 2024
Combined Heat & Power No
Sector NameElectric Utility (1)
Energy SourceNatural Gas / Distillate Fuel Oil
Solid Fuel Gasification No
Carbon Capture TechnologyNo
Time From Cold Shutdown To Full Load10M
Multiple FuelsYes
Cofire FuelsNo
Switch Between Oil And Natural GasYes
Multifuel Details
Switch When OperatingNo
Net Summer Capacity With Natural Gas47.1 MW
Net Winter Capacity With Natural Gas68.6 MW
Net Summer Capacity With Oil50.3 MW
Net Winter Capacity With Oil66.9 MW
Time To Switch From Gas To Oil1H
Time To Switch From Oil To Gas1H
Factors That Limit SwitchingYes
Air Permit LimitsYes

Generator GT1 Details Operating June 1975

TechnologyNatural Gas Fired Combustion Turbine
Prime MoverCombustion Turbine
OwnershipSingle Owner
Nameplate Capacity68 MW
Nameplate Power Factor0.9
Summer Capacity47.1 MW
Winter Capacity62.5 MW
Minimum Load25 MW
Uprate/Derate Completed No
StatusOperating
First Operation DateJune 1975
Planned RetirementDecember 2024
Combined Heat & Power No
Sector NameElectric Utility (1)
Energy SourceNatural Gas / Distillate Fuel Oil
Solid Fuel Gasification No
Carbon Capture TechnologyNo
Time From Cold Shutdown To Full Load10M
Multiple FuelsYes
Cofire FuelsNo
Switch Between Oil And Natural GasYes
Multifuel Details
Switch When OperatingNo
Net Summer Capacity With Natural Gas47.1 MW
Net Winter Capacity With Natural Gas62.5 MW
Net Summer Capacity With Oil50.3 MW
Net Winter Capacity With Oil66.9 MW
Time To Switch From Gas To Oil1H
Time To Switch From Oil To Gas1H
Factors That Limit SwitchingYes
Air Permit LimitsYes

Generator GT2 Details Operating June 1975

TechnologyNatural Gas Fired Combustion Turbine
Prime MoverCombustion Turbine
OwnershipSingle Owner
Nameplate Capacity68 MW
Nameplate Power Factor0.9
Summer Capacity47.1 MW
Winter Capacity62.5 MW
Minimum Load25 MW
Uprate/Derate Completed No
StatusOperating
First Operation DateJune 1975
Planned RetirementDecember 2024
Combined Heat & Power No
Sector NameElectric Utility (1)
Energy SourceNatural Gas / Distillate Fuel Oil
Solid Fuel Gasification No
Carbon Capture TechnologyNo
Time From Cold Shutdown To Full Load10M
Multiple FuelsYes
Cofire FuelsNo
Switch Between Oil And Natural GasYes
Multifuel Details
Switch When OperatingNo
Net Summer Capacity With Natural Gas47.1 MW
Net Winter Capacity With Natural Gas62.5 MW
Net Summer Capacity With Oil50.3 MW
Net Winter Capacity With Oil66.9 MW
Time To Switch From Gas To Oil1H
Time To Switch From Oil To Gas1H
Factors That Limit SwitchingYes
Air Permit LimitsYes

Generator GT3 Details Operating June 1975

TechnologyNatural Gas Fired Combustion Turbine
Prime MoverCombustion Turbine
OwnershipSingle Owner
Nameplate Capacity68 MW
Nameplate Power Factor0.9
Summer Capacity47.1 MW
Winter Capacity62.5 MW
Minimum Load25 MW
Uprate/Derate Completed No
StatusOperating
First Operation DateJune 1975
Planned RetirementDecember 2024
Combined Heat & Power No
Sector NameElectric Utility (1)
Energy SourceNatural Gas / Distillate Fuel Oil
Solid Fuel Gasification No
Carbon Capture TechnologyNo
Time From Cold Shutdown To Full Load10M
Multiple FuelsYes
Cofire FuelsNo
Switch Between Oil And Natural GasYes
Multifuel Details
Switch When OperatingNo
Net Summer Capacity With Natural Gas47.1 MW
Net Winter Capacity With Natural Gas62.5 MW
Net Summer Capacity With Oil50.3 MW
Net Winter Capacity With Oil66.9 MW
Time To Switch From Gas To Oil1H
Time To Switch From Oil To Gas1H
Factors That Limit SwitchingYes
Air Permit LimitsYes

Generator GT4 Details Operating June 1975

TechnologyNatural Gas Fired Combustion Turbine
Prime MoverCombustion Turbine
OwnershipSingle Owner
Nameplate Capacity68 MW
Nameplate Power Factor0.9
Summer Capacity47.1 MW
Winter Capacity62.5 MW
Minimum Load25 MW
Uprate/Derate Completed No
StatusOperating
First Operation DateJune 1975
Planned RetirementDecember 2024
Combined Heat & Power No
Sector NameElectric Utility (1)
Energy SourceNatural Gas / Distillate Fuel Oil
Solid Fuel Gasification No
Carbon Capture TechnologyNo
Time From Cold Shutdown To Full Load10M
Multiple FuelsYes
Cofire FuelsNo
Switch Between Oil And Natural GasYes
Multifuel Details
Switch When OperatingNo
Net Summer Capacity With Natural Gas47.1 MW
Net Winter Capacity With Natural Gas62.5 MW
Net Summer Capacity With Oil50.3 MW
Net Winter Capacity With Oil66.9 MW
Time To Switch From Gas To Oil1H
Time To Switch From Oil To Gas1H
Factors That Limit SwitchingYes
Air Permit LimitsYes

Generator GT5 Details Operating June 1975

TechnologyNatural Gas Fired Combustion Turbine
Prime MoverCombustion Turbine
OwnershipSingle Owner
Nameplate Capacity68 MW
Nameplate Power Factor0.9
Summer Capacity47.1 MW
Winter Capacity62.5 MW
Minimum Load25 MW
Uprate/Derate Completed No
StatusOperating
First Operation DateJune 1975
Planned RetirementDecember 2024
Combined Heat & Power No
Sector NameElectric Utility (1)
Energy SourceNatural Gas / Distillate Fuel Oil
Solid Fuel Gasification No
Carbon Capture TechnologyNo
Time From Cold Shutdown To Full Load10M
Multiple FuelsYes
Cofire FuelsNo
Switch Between Oil And Natural GasYes
Multifuel Details
Switch When OperatingNo
Net Summer Capacity With Natural Gas47.1 MW
Net Winter Capacity With Natural Gas62.5 MW
Net Summer Capacity With Oil50.3 MW
Net Winter Capacity With Oil66.9 MW
Time To Switch From Gas To Oil1H
Time To Switch From Oil To Gas1H
Factors That Limit SwitchingYes
Air Permit LimitsYes

Generator GT6 Details Operating June 1975

TechnologyNatural Gas Fired Combustion Turbine
Prime MoverCombustion Turbine
OwnershipSingle Owner
Nameplate Capacity68 MW
Nameplate Power Factor0.9
Summer Capacity47.1 MW
Winter Capacity62.5 MW
Minimum Load25 MW
Uprate/Derate Completed No
StatusOperating
First Operation DateJune 1975
Planned RetirementDecember 2024
Combined Heat & Power No
Sector NameElectric Utility (1)
Energy SourceNatural Gas / Distillate Fuel Oil
Solid Fuel Gasification No
Carbon Capture TechnologyNo
Time From Cold Shutdown To Full Load10M
Multiple FuelsYes
Cofire FuelsNo
Switch Between Oil And Natural GasYes
Multifuel Details
Switch When OperatingNo
Net Summer Capacity With Natural Gas47.1 MW
Net Winter Capacity With Natural Gas62.5 MW
Net Summer Capacity With Oil50.3 MW
Net Winter Capacity With Oil66.9 MW
Time To Switch From Gas To Oil1H
Time To Switch From Oil To Gas1H
Factors That Limit SwitchingYes
Air Permit LimitsYes

Generator GT7 Details Operating June 1975

TechnologyNatural Gas Fired Combustion Turbine
Prime MoverCombustion Turbine
OwnershipSingle Owner
Nameplate Capacity68 MW
Nameplate Power Factor0.9
Summer Capacity47.1 MW
Winter Capacity62.5 MW
Minimum Load25 MW
Uprate/Derate Completed No
StatusOperating
First Operation DateJune 1975
Planned RetirementDecember 2024
Combined Heat & Power No
Sector NameElectric Utility (1)
Energy SourceNatural Gas / Distillate Fuel Oil
Solid Fuel Gasification No
Carbon Capture TechnologyNo
Time From Cold Shutdown To Full Load10M
Multiple FuelsYes
Cofire FuelsNo
Switch Between Oil And Natural GasYes
Multifuel Details
Switch When OperatingNo
Net Summer Capacity With Natural Gas47.1 MW
Net Winter Capacity With Natural Gas62.5 MW
Net Summer Capacity With Oil50.3 MW
Net Winter Capacity With Oil66.9 MW
Time To Switch From Gas To Oil1H
Time To Switch From Oil To Gas1H
Factors That Limit SwitchingYes
Air Permit LimitsYes

Generator GT8 Details Operating June 1975

TechnologyNatural Gas Fired Combustion Turbine
Prime MoverCombustion Turbine
OwnershipSingle Owner
Nameplate Capacity68 MW
Nameplate Power Factor0.9
Summer Capacity47.1 MW
Winter Capacity62.5 MW
Minimum Load25 MW
Uprate/Derate Completed No
StatusOperating
First Operation DateJune 1975
Planned RetirementDecember 2024
Combined Heat & Power No
Sector NameElectric Utility (1)
Energy SourceNatural Gas / Distillate Fuel Oil
Solid Fuel Gasification No
Carbon Capture TechnologyNo
Time From Cold Shutdown To Full Load10M
Multiple FuelsYes
Cofire FuelsNo
Switch Between Oil And Natural GasYes
Multifuel Details
Switch When OperatingNo
Net Summer Capacity With Natural Gas47.1 MW
Net Winter Capacity With Natural Gas62.5 MW
Net Summer Capacity With Oil50.3 MW
Net Winter Capacity With Oil66.9 MW
Time To Switch From Gas To Oil1H
Time To Switch From Oil To Gas1H
Factors That Limit SwitchingYes
Air Permit LimitsYes

Generator GT9 Details Operating June 1975

TechnologyNatural Gas Fired Combustion Turbine
Prime MoverCombustion Turbine
OwnershipSingle Owner
Nameplate Capacity68 MW
Nameplate Power Factor0.9
Summer Capacity47.1 MW
Winter Capacity62.5 MW
Minimum Load25 MW
Uprate/Derate Completed No
StatusOperating
First Operation DateJune 1975
Planned RetirementDecember 2024
Combined Heat & Power No
Sector NameElectric Utility (1)
Energy SourceNatural Gas / Distillate Fuel Oil
Carbon Capture TechnologyNo
Time From Cold Shutdown To Full Load10M
Multiple FuelsYes
Cofire FuelsNo
Switch Between Oil And Natural GasYes
Multifuel Details
Switch When OperatingNo
Net Summer Capacity With Natural Gas47.1 MW
Net Winter Capacity With Natural Gas62.5 MW
Net Summer Capacity With Oil50.3 MW
Net Winter Capacity With Oil66.9 MW
Time To Switch From Gas To Oil1H
Time To Switch From Oil To Gas1H
Factors That Limit SwitchingYes
Air Permit LimitsYes

Generator G17 Details Operating July 2000

TechnologyNatural Gas Fired Combustion Turbine
Prime MoverCombustion Turbine
OwnershipSingle Owner
Nameplate Capacity84.5 MW
Nameplate Power Factor0.9
Summer Capacity72.8 MW
Winter Capacity93 MW
Minimum Load56 MW
Uprate/Derate Completed No
StatusOperating
First Operation DateJuly 2000
Combined Heat & Power No
Sector NameElectric Utility (1)
Energy SourceNatural Gas / Distillate Fuel Oil
Solid Fuel Gasification No
Carbon Capture TechnologyNo
Time From Cold Shutdown To Full Load1H
Multiple FuelsYes
Cofire FuelsNo
Switch Between Oil And Natural GasYes
Multifuel Details
Switch When OperatingNo
Net Summer Capacity With Natural Gas72.8 MW
Net Winter Capacity With Natural Gas93 MW
Net Summer Capacity With Oil75.1 MW
Net Winter Capacity With Oil66.9 MW
Time To Switch From Gas To Oil1H
Time To Switch From Oil To Gas1H
Factors That Limit SwitchingYes
Air Permit LimitsYes

Generator G18 Details Operating July 2000

TechnologyNatural Gas Fired Combustion Turbine
Prime MoverCombustion Turbine
OwnershipSingle Owner
Nameplate Capacity84.5 MW
Nameplate Power Factor0.9
Summer Capacity72.8 MW
Winter Capacity93 MW
Minimum Load56 MW
Uprate/Derate Completed No
StatusOperating
First Operation DateJuly 2000
Combined Heat & Power No
Sector NameElectric Utility (1)
Energy SourceNatural Gas / Distillate Fuel Oil
Solid Fuel Gasification No
Carbon Capture TechnologyNo
Time From Cold Shutdown To Full Load1H
Multiple FuelsYes
Cofire FuelsNo
Switch Between Oil And Natural GasYes
Multifuel Details
Switch When OperatingNo
Net Summer Capacity With Natural Gas72.8 MW
Net Winter Capacity With Natural Gas93 MW
Net Summer Capacity With Oil75.1 MW
Net Winter Capacity With Oil66.9 MW
Time To Switch From Gas To Oil1H
Time To Switch From Oil To Gas1H
Factors That Limit SwitchingYes
Air Permit LimitsYes

Generator G19 Details Operating July 2000

TechnologyNatural Gas Fired Combustion Turbine
Prime MoverCombustion Turbine
OwnershipSingle Owner
Nameplate Capacity84.5 MW
Nameplate Power Factor0.9
Summer Capacity72.8 MW
Winter Capacity93 MW
Minimum Load56 MW
Uprate/Derate Completed No
StatusOperating
First Operation DateJuly 2000
Combined Heat & Power No
Sector NameElectric Utility (1)
Energy SourceNatural Gas / Distillate Fuel Oil
Solid Fuel Gasification No
Carbon Capture TechnologyNo
Time From Cold Shutdown To Full Load1H
Multiple FuelsYes
Cofire FuelsNo
Switch Between Oil And Natural GasYes
Multifuel Details
Switch When OperatingNo
Net Summer Capacity With Natural Gas72.8 MW
Net Winter Capacity With Natural Gas93 MW
Net Summer Capacity With Oil75.1 MW
Net Winter Capacity With Oil66.9 MW
Time To Switch From Gas To Oil1H
Time To Switch From Oil To Gas1H
Factors That Limit SwitchingYes
Air Permit LimitsYes

Generator G20 Details Operating July 2000

TechnologyNatural Gas Fired Combustion Turbine
Prime MoverCombustion Turbine
OwnershipSingle Owner
Nameplate Capacity84.5 MW
Nameplate Power Factor0.9
Summer Capacity72.8 MW
Winter Capacity93 MW
Minimum Load56 MW
Uprate/Derate Completed No
StatusOperating
First Operation DateJuly 2000
Combined Heat & Power No
Sector NameElectric Utility (1)
Energy SourceNatural Gas / Distillate Fuel Oil
Solid Fuel Gasification No
Carbon Capture TechnologyNo
Time From Cold Shutdown To Full Load1H
Multiple FuelsYes
Cofire FuelsNo
Switch Between Oil And Natural GasYes
Multifuel Details
Switch When OperatingNo
Net Summer Capacity With Natural Gas72.8 MW
Net Winter Capacity With Natural Gas93 MW
Net Summer Capacity With Oil75.1 MW
Net Winter Capacity With Oil66.9 MW
Time To Switch From Gas To Oil1H
Time To Switch From Oil To Gas1H
Factors That Limit SwitchingYes
Air Permit LimitsYes

Johnsonville Plant Owners

Owner NameAddressGeneratorOwnership
We couldn't locate any owners for this plant

Power Plants with Similar Net Generation

Power plants with a similar annual net generation from Natural Gas.

RankPlant NamePlant LocationAnnual Generation
#493LadysmithWoodford, VA770.0 GWh
#494Bennett MountainMountain Home, ID725.6 GWh
#495FredoniaMt Vernon, WA728.5 GWh
#496Eklutna Generation StationChugiak, AK717.0 GWh
#497San Jacinto Steam Electric StationLa Porte, TX716.0 GWh
#498FrontierOklahoma City, OK713.0 GWh
#499HawthornKansas City, MO3.0 TWh
#500Millennium PowerCharlton, MA711.4 GWh
#501MaddoxHobbs, NM699.8 GWh
#502Axiall Natrium PlantNew Martinsville, WV723.7 GWh
#504Deerhaven Generating StationGainesville, FL692.0 GWh
#505EG178 FacilitySnyder, TX686.9 GWh
#506Martinez RefiningMartinez, CA708.4 GWh
#507Marathon Bay Area CogenMartinez, CA662.3 GWh
#508Mountain CreekDallas, TX654.1 GWh
#509Plant XEarth, TX660.3 GWh
#510Astoria Generating StationAstoria, NY729.8 GWh
#511T H WhartonHouston, TX648.9 GWh
#512SPA Cogen 3Sacramento, CA648.6 GWh
#513J K SmithWinchester, KY641.4 GWh

Nearby Power Plants

Below are closest 20 power plants surrounding Johnsonville.

Plant NamePlant LocationAnnual GenerationDistance
BarkleyKuttawa, KY500.5 GWh69.9 mi
Bi-County Gas ProducersWoodlawn, TN11.2 GWh43.1 mi
CheathamAshland City, TN177.3 GWh47.2 mi
Cumberland (TN)Cumberland City, TN9.4 TWh31.1 mi
Gleason Generating FacilityGleason, TN37.9 GWh38 mi
Kentucky DamGrand Rivers, KY1.1 TWh69.9 mi
OETN1Obion, TN185.1 GWh61.3 mi
Packaging Corp of AmericaCounce, TN410.8 GWh69.6 mi
Pickwick Landing DamPickwick Dam, TN1.1 TWh67.9 mi
Providence SolarMadison, TN27.6 GWh67.1 mi
Selmer Farm LLCSelmer, TN24.2 GWh68.6 mi
Selmer ISelmer, TN24.0 GWh69 mi
Selmer IISelmer, TN10.4 GWh70.2 mi
SR Clarksville II, LLCClarksville, TN62.0 MWh50.6 mi
SR Clarksville, LLCClarksville, TN93.0 MWh50.6 mi
SR Jackson IIJackson, TN2.2 GWh59.7 mi
SR McKellarDenmark, TN133.6 GWh61.3 mi
SR ParisParis, TN12.7 GWh34.6 mi
Vanderbilt University Power PlantNashville, TN94.3 GWh66.5 mi
West CamdenCamden, TN39.0 GWh9 mi