Johnsonville
Hwy 70 PO Box 259, New Johnsonville, TN 37134Plant Summary Information
Johnsonville is ranked #15 out of 84 power plants in Tennessee in terms of total annual net electricity generation.
Johnsonville is comprised of 20 generators and generated 303.8 GWh during the 3-month period between May 2024 to August 2024.
Plant Name | Johnsonville |
---|---|
Utility Name | Tennessee Valley Authority |
Location | Humphreys County, TN |
Initial Operation Date | October 1951 |
Last Update | Aug 2024 |
Annual Generation | 642.8 GWh |
Annual Consumption | 10.2 M MMBtu |
Ranked #1,032 out of 11,835 Power Plants Nationwide | |
Ranked #513 out of 2,253 Natural Gas Power Plants Nationwide | |
Ranked #15 out of 84 Tennessee Power Plants | |
Ranked #4 out of 16 Tennessee Natural Gas Power Plants | |
Fuel Types | Natural Gas : 99.4% Distillate Fuel Oil : 0.6% |
Map of Johnsonville
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Johnsonville.
Monthly Net Generation for Johnsonville
Johnsonville Details
Summary Information | |
---|---|
Plant Name | Johnsonville (3406) |
Plant Address | Hwy 70 PO Box 259, New Johnsonville, TN 37134 |
Utility | Tennessee Valley Authority (18642) |
Latitude, Longitude | 36.0278, -87.9861 |
Generation Dates on File | Jan 2001 to Aug 2024 |
Initial Operation Date | October 1951 |
Annual Generation | 642.8 GWh |
Fuel Types | Natural Gas : 99.4% Distillate Fuel Oil : 0.6% |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Regulated |
NERC Region | SERC |
Balancing Authority | Tennessee Valley Authority (TVA) |
NAICS Code | Utilities (22) |
Sector | Electric Utility (1) |
Water Source | Tennessee River |
Ash Impoundment | Yes Not Lined Operating |
Transmission / Distribution Owner | Tennessee Valley Authority (18642) TN |
Grid Voltage | 161.00 kV |
Energy Storage | No |
Natural Gas Information | |
Pipeline Name | TENNESSEE GAS PIPELINE COMPANY |
Natural Gas Storage | No |
Generator G10 Details Operating June 1975
Technology | Natural Gas Fired Combustion Turbine |
---|---|
Prime Mover | Combustion Turbine |
Ownership | Single Owner |
Nameplate Capacity | 68 MW |
Nameplate Power Factor | 0.9 |
Summer Capacity | 47.1 MW |
Winter Capacity | 62.5 MW |
Minimum Load | 25 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | June 1975 |
Planned Retirement | December 2024 |
---|---|
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Natural Gas / Distillate Fuel Oil |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | Yes |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | Yes |
Multifuel Details | |
Switch When Operating | No |
---|---|
Net Summer Capacity With Natural Gas | 47.1 MW |
Net Winter Capacity With Natural Gas | 62.5 MW |
Net Summer Capacity With Oil | 50.3 MW |
Net Winter Capacity With Oil | 66.9 MW |
Time To Switch From Gas To Oil | 1H |
Time To Switch From Oil To Gas | 1H |
Factors That Limit Switching | Yes |
Air Permit Limits | Yes |
Generator G11 Details Operating June 1975
Technology | Natural Gas Fired Combustion Turbine |
---|---|
Prime Mover | Combustion Turbine |
Ownership | Single Owner |
Nameplate Capacity | 68 MW |
Nameplate Power Factor | 0.9 |
Summer Capacity | 47.1 MW |
Winter Capacity | 62.5 MW |
Minimum Load | 25 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | June 1975 |
Planned Retirement | December 2024 |
---|---|
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Natural Gas / Distillate Fuel Oil |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | Yes |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | Yes |
Multifuel Details | |
Switch When Operating | No |
---|---|
Net Summer Capacity With Natural Gas | 47.1 MW |
Net Winter Capacity With Natural Gas | 62.5 MW |
Net Summer Capacity With Oil | 50.3 MW |
Net Winter Capacity With Oil | 66.9 MW |
Time To Switch From Gas To Oil | 1H |
Time To Switch From Oil To Gas | 1H |
Factors That Limit Switching | Yes |
Air Permit Limits | Yes |
Generator G12 Details Operating June 1975
Technology | Natural Gas Fired Combustion Turbine |
---|---|
Prime Mover | Combustion Turbine |
Ownership | Single Owner |
Nameplate Capacity | 68 MW |
Nameplate Power Factor | 0.9 |
Summer Capacity | 47.1 MW |
Winter Capacity | 62.5 MW |
Minimum Load | 25 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | June 1975 |
Planned Retirement | December 2024 |
---|---|
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Natural Gas / Distillate Fuel Oil |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | Yes |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | Yes |
Multifuel Details | |
Switch When Operating | No |
---|---|
Net Summer Capacity With Natural Gas | 47.1 MW |
Net Winter Capacity With Natural Gas | 62.5 MW |
Net Summer Capacity With Oil | 50.3 MW |
Net Winter Capacity With Oil | 66.9 MW |
Time To Switch From Gas To Oil | 1H |
Time To Switch From Oil To Gas | 1H |
Factors That Limit Switching | Yes |
Air Permit Limits | Yes |
Generator G13 Details Operating June 1975
Technology | Natural Gas Fired Combustion Turbine |
---|---|
Prime Mover | Combustion Turbine |
Ownership | Single Owner |
Nameplate Capacity | 68 MW |
Nameplate Power Factor | 0.9 |
Summer Capacity | 47.1 MW |
Winter Capacity | 62.5 MW |
Minimum Load | 25 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | June 1975 |
Planned Retirement | December 2024 |
---|---|
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Natural Gas / Distillate Fuel Oil |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | Yes |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | Yes |
Multifuel Details | |
Switch When Operating | No |
---|---|
Net Summer Capacity With Natural Gas | 47.1 MW |
Net Winter Capacity With Natural Gas | 62.5 MW |
Net Summer Capacity With Oil | 50.3 MW |
Net Winter Capacity With Oil | 66.9 MW |
Time To Switch From Gas To Oil | 1H |
Time To Switch From Oil To Gas | 1H |
Factors That Limit Switching | Yes |
Air Permit Limits | Yes |
Generator G14 Details Operating June 1975
Technology | Natural Gas Fired Combustion Turbine |
---|---|
Prime Mover | Combustion Turbine |
Ownership | Single Owner |
Nameplate Capacity | 68 MW |
Nameplate Power Factor | 0.9 |
Summer Capacity | 47.1 MW |
Winter Capacity | 62.5 MW |
Minimum Load | 25 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | June 1975 |
Planned Retirement | December 2024 |
---|---|
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Natural Gas / Distillate Fuel Oil |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | Yes |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | Yes |
Multifuel Details | |
Switch When Operating | No |
---|---|
Net Summer Capacity With Natural Gas | 47.1 MW |
Net Winter Capacity With Natural Gas | 62.5 MW |
Net Summer Capacity With Oil | 50.3 MW |
Net Winter Capacity With Oil | 66.9 MW |
Time To Switch From Gas To Oil | 1H |
Time To Switch From Oil To Gas | 1H |
Factors That Limit Switching | Yes |
Air Permit Limits | Yes |
Generator G15 Details Operating June 1975
Technology | Natural Gas Fired Combustion Turbine |
---|---|
Prime Mover | Combustion Turbine |
Ownership | Single Owner |
Nameplate Capacity | 68 MW |
Nameplate Power Factor | 0.9 |
Summer Capacity | 47.1 MW |
Winter Capacity | 62.5 MW |
Minimum Load | 25 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | June 1975 |
Planned Retirement | December 2024 |
---|---|
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Natural Gas / Distillate Fuel Oil |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | Yes |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | Yes |
Multifuel Details | |
Switch When Operating | No |
---|---|
Net Summer Capacity With Natural Gas | 47.1 MW |
Net Winter Capacity With Natural Gas | 62.5 MW |
Net Summer Capacity With Oil | 50.3 MW |
Net Winter Capacity With Oil | 66.9 MW |
Time To Switch From Gas To Oil | 1H |
Time To Switch From Oil To Gas | 1H |
Factors That Limit Switching | Yes |
Air Permit Limits | Yes |
Generator G16 Details Operating June 1975
Technology | Natural Gas Fired Combustion Turbine |
---|---|
Prime Mover | Combustion Turbine |
Ownership | Single Owner |
Nameplate Capacity | 68 MW |
Nameplate Power Factor | 0.9 |
Summer Capacity | 47.1 MW |
Winter Capacity | 62.5 MW |
Minimum Load | 25 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | June 1975 |
Planned Retirement | December 2024 |
---|---|
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Natural Gas / Distillate Fuel Oil |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | Yes |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | Yes |
Multifuel Details | |
Switch When Operating | No |
---|---|
Net Summer Capacity With Natural Gas | 47.1 MW |
Net Winter Capacity With Natural Gas | 68.6 MW |
Net Summer Capacity With Oil | 50.3 MW |
Net Winter Capacity With Oil | 66.9 MW |
Time To Switch From Gas To Oil | 1H |
Time To Switch From Oil To Gas | 1H |
Factors That Limit Switching | Yes |
Air Permit Limits | Yes |
Generator GT1 Details Operating June 1975
Technology | Natural Gas Fired Combustion Turbine |
---|---|
Prime Mover | Combustion Turbine |
Ownership | Single Owner |
Nameplate Capacity | 68 MW |
Nameplate Power Factor | 0.9 |
Summer Capacity | 47.1 MW |
Winter Capacity | 62.5 MW |
Minimum Load | 25 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | June 1975 |
Planned Retirement | December 2024 |
---|---|
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Natural Gas / Distillate Fuel Oil |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | Yes |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | Yes |
Multifuel Details | |
Switch When Operating | No |
---|---|
Net Summer Capacity With Natural Gas | 47.1 MW |
Net Winter Capacity With Natural Gas | 62.5 MW |
Net Summer Capacity With Oil | 50.3 MW |
Net Winter Capacity With Oil | 66.9 MW |
Time To Switch From Gas To Oil | 1H |
Time To Switch From Oil To Gas | 1H |
Factors That Limit Switching | Yes |
Air Permit Limits | Yes |
Generator GT2 Details Operating June 1975
Technology | Natural Gas Fired Combustion Turbine |
---|---|
Prime Mover | Combustion Turbine |
Ownership | Single Owner |
Nameplate Capacity | 68 MW |
Nameplate Power Factor | 0.9 |
Summer Capacity | 47.1 MW |
Winter Capacity | 62.5 MW |
Minimum Load | 25 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | June 1975 |
Planned Retirement | December 2024 |
---|---|
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Natural Gas / Distillate Fuel Oil |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | Yes |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | Yes |
Multifuel Details | |
Switch When Operating | No |
---|---|
Net Summer Capacity With Natural Gas | 47.1 MW |
Net Winter Capacity With Natural Gas | 62.5 MW |
Net Summer Capacity With Oil | 50.3 MW |
Net Winter Capacity With Oil | 66.9 MW |
Time To Switch From Gas To Oil | 1H |
Time To Switch From Oil To Gas | 1H |
Factors That Limit Switching | Yes |
Air Permit Limits | Yes |
Generator GT3 Details Operating June 1975
Technology | Natural Gas Fired Combustion Turbine |
---|---|
Prime Mover | Combustion Turbine |
Ownership | Single Owner |
Nameplate Capacity | 68 MW |
Nameplate Power Factor | 0.9 |
Summer Capacity | 47.1 MW |
Winter Capacity | 62.5 MW |
Minimum Load | 25 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | June 1975 |
Planned Retirement | December 2024 |
---|---|
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Natural Gas / Distillate Fuel Oil |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | Yes |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | Yes |
Multifuel Details | |
Switch When Operating | No |
---|---|
Net Summer Capacity With Natural Gas | 47.1 MW |
Net Winter Capacity With Natural Gas | 62.5 MW |
Net Summer Capacity With Oil | 50.3 MW |
Net Winter Capacity With Oil | 66.9 MW |
Time To Switch From Gas To Oil | 1H |
Time To Switch From Oil To Gas | 1H |
Factors That Limit Switching | Yes |
Air Permit Limits | Yes |
Generator GT4 Details Operating June 1975
Technology | Natural Gas Fired Combustion Turbine |
---|---|
Prime Mover | Combustion Turbine |
Ownership | Single Owner |
Nameplate Capacity | 68 MW |
Nameplate Power Factor | 0.9 |
Summer Capacity | 47.1 MW |
Winter Capacity | 62.5 MW |
Minimum Load | 25 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | June 1975 |
Planned Retirement | December 2024 |
---|---|
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Natural Gas / Distillate Fuel Oil |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | Yes |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | Yes |
Multifuel Details | |
Switch When Operating | No |
---|---|
Net Summer Capacity With Natural Gas | 47.1 MW |
Net Winter Capacity With Natural Gas | 62.5 MW |
Net Summer Capacity With Oil | 50.3 MW |
Net Winter Capacity With Oil | 66.9 MW |
Time To Switch From Gas To Oil | 1H |
Time To Switch From Oil To Gas | 1H |
Factors That Limit Switching | Yes |
Air Permit Limits | Yes |
Generator GT5 Details Operating June 1975
Technology | Natural Gas Fired Combustion Turbine |
---|---|
Prime Mover | Combustion Turbine |
Ownership | Single Owner |
Nameplate Capacity | 68 MW |
Nameplate Power Factor | 0.9 |
Summer Capacity | 47.1 MW |
Winter Capacity | 62.5 MW |
Minimum Load | 25 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | June 1975 |
Planned Retirement | December 2024 |
---|---|
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Natural Gas / Distillate Fuel Oil |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | Yes |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | Yes |
Multifuel Details | |
Switch When Operating | No |
---|---|
Net Summer Capacity With Natural Gas | 47.1 MW |
Net Winter Capacity With Natural Gas | 62.5 MW |
Net Summer Capacity With Oil | 50.3 MW |
Net Winter Capacity With Oil | 66.9 MW |
Time To Switch From Gas To Oil | 1H |
Time To Switch From Oil To Gas | 1H |
Factors That Limit Switching | Yes |
Air Permit Limits | Yes |
Generator GT6 Details Operating June 1975
Technology | Natural Gas Fired Combustion Turbine |
---|---|
Prime Mover | Combustion Turbine |
Ownership | Single Owner |
Nameplate Capacity | 68 MW |
Nameplate Power Factor | 0.9 |
Summer Capacity | 47.1 MW |
Winter Capacity | 62.5 MW |
Minimum Load | 25 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | June 1975 |
Planned Retirement | December 2024 |
---|---|
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Natural Gas / Distillate Fuel Oil |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | Yes |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | Yes |
Multifuel Details | |
Switch When Operating | No |
---|---|
Net Summer Capacity With Natural Gas | 47.1 MW |
Net Winter Capacity With Natural Gas | 62.5 MW |
Net Summer Capacity With Oil | 50.3 MW |
Net Winter Capacity With Oil | 66.9 MW |
Time To Switch From Gas To Oil | 1H |
Time To Switch From Oil To Gas | 1H |
Factors That Limit Switching | Yes |
Air Permit Limits | Yes |
Generator GT7 Details Operating June 1975
Technology | Natural Gas Fired Combustion Turbine |
---|---|
Prime Mover | Combustion Turbine |
Ownership | Single Owner |
Nameplate Capacity | 68 MW |
Nameplate Power Factor | 0.9 |
Summer Capacity | 47.1 MW |
Winter Capacity | 62.5 MW |
Minimum Load | 25 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | June 1975 |
Planned Retirement | December 2024 |
---|---|
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Natural Gas / Distillate Fuel Oil |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | Yes |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | Yes |
Multifuel Details | |
Switch When Operating | No |
---|---|
Net Summer Capacity With Natural Gas | 47.1 MW |
Net Winter Capacity With Natural Gas | 62.5 MW |
Net Summer Capacity With Oil | 50.3 MW |
Net Winter Capacity With Oil | 66.9 MW |
Time To Switch From Gas To Oil | 1H |
Time To Switch From Oil To Gas | 1H |
Factors That Limit Switching | Yes |
Air Permit Limits | Yes |
Generator GT8 Details Operating June 1975
Technology | Natural Gas Fired Combustion Turbine |
---|---|
Prime Mover | Combustion Turbine |
Ownership | Single Owner |
Nameplate Capacity | 68 MW |
Nameplate Power Factor | 0.9 |
Summer Capacity | 47.1 MW |
Winter Capacity | 62.5 MW |
Minimum Load | 25 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | June 1975 |
Planned Retirement | December 2024 |
---|---|
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Natural Gas / Distillate Fuel Oil |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | Yes |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | Yes |
Multifuel Details | |
Switch When Operating | No |
---|---|
Net Summer Capacity With Natural Gas | 47.1 MW |
Net Winter Capacity With Natural Gas | 62.5 MW |
Net Summer Capacity With Oil | 50.3 MW |
Net Winter Capacity With Oil | 66.9 MW |
Time To Switch From Gas To Oil | 1H |
Time To Switch From Oil To Gas | 1H |
Factors That Limit Switching | Yes |
Air Permit Limits | Yes |
Generator GT9 Details Operating June 1975
Technology | Natural Gas Fired Combustion Turbine |
---|---|
Prime Mover | Combustion Turbine |
Ownership | Single Owner |
Nameplate Capacity | 68 MW |
Nameplate Power Factor | 0.9 |
Summer Capacity | 47.1 MW |
Winter Capacity | 62.5 MW |
Minimum Load | 25 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | June 1975 |
---|---|
Planned Retirement | December 2024 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Natural Gas / Distillate Fuel Oil |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | Yes |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | Yes |
Multifuel Details | |
Switch When Operating | No |
---|---|
Net Summer Capacity With Natural Gas | 47.1 MW |
Net Winter Capacity With Natural Gas | 62.5 MW |
Net Summer Capacity With Oil | 50.3 MW |
Net Winter Capacity With Oil | 66.9 MW |
Time To Switch From Gas To Oil | 1H |
Time To Switch From Oil To Gas | 1H |
Factors That Limit Switching | Yes |
Air Permit Limits | Yes |
Generator G17 Details Operating July 2000
Technology | Natural Gas Fired Combustion Turbine |
---|---|
Prime Mover | Combustion Turbine |
Ownership | Single Owner |
Nameplate Capacity | 84.5 MW |
Nameplate Power Factor | 0.9 |
Summer Capacity | 72.8 MW |
Winter Capacity | 93 MW |
Minimum Load | 56 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | July 2000 |
---|---|
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Natural Gas / Distillate Fuel Oil |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 1H |
Multiple Fuels | Yes |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | Yes |
Multifuel Details | |
Switch When Operating | No |
---|---|
Net Summer Capacity With Natural Gas | 72.8 MW |
Net Winter Capacity With Natural Gas | 93 MW |
Net Summer Capacity With Oil | 75.1 MW |
Net Winter Capacity With Oil | 66.9 MW |
Time To Switch From Gas To Oil | 1H |
Time To Switch From Oil To Gas | 1H |
Factors That Limit Switching | Yes |
Air Permit Limits | Yes |
Generator G18 Details Operating July 2000
Technology | Natural Gas Fired Combustion Turbine |
---|---|
Prime Mover | Combustion Turbine |
Ownership | Single Owner |
Nameplate Capacity | 84.5 MW |
Nameplate Power Factor | 0.9 |
Summer Capacity | 72.8 MW |
Winter Capacity | 93 MW |
Minimum Load | 56 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | July 2000 |
---|---|
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Natural Gas / Distillate Fuel Oil |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 1H |
Multiple Fuels | Yes |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | Yes |
Multifuel Details | |
Switch When Operating | No |
---|---|
Net Summer Capacity With Natural Gas | 72.8 MW |
Net Winter Capacity With Natural Gas | 93 MW |
Net Summer Capacity With Oil | 75.1 MW |
Net Winter Capacity With Oil | 66.9 MW |
Time To Switch From Gas To Oil | 1H |
Time To Switch From Oil To Gas | 1H |
Factors That Limit Switching | Yes |
Air Permit Limits | Yes |
Generator G19 Details Operating July 2000
Technology | Natural Gas Fired Combustion Turbine |
---|---|
Prime Mover | Combustion Turbine |
Ownership | Single Owner |
Nameplate Capacity | 84.5 MW |
Nameplate Power Factor | 0.9 |
Summer Capacity | 72.8 MW |
Winter Capacity | 93 MW |
Minimum Load | 56 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | July 2000 |
---|---|
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Natural Gas / Distillate Fuel Oil |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 1H |
Multiple Fuels | Yes |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | Yes |
Multifuel Details | |
Switch When Operating | No |
---|---|
Net Summer Capacity With Natural Gas | 72.8 MW |
Net Winter Capacity With Natural Gas | 93 MW |
Net Summer Capacity With Oil | 75.1 MW |
Net Winter Capacity With Oil | 66.9 MW |
Time To Switch From Gas To Oil | 1H |
Time To Switch From Oil To Gas | 1H |
Factors That Limit Switching | Yes |
Air Permit Limits | Yes |
Generator G20 Details Operating July 2000
Technology | Natural Gas Fired Combustion Turbine |
---|---|
Prime Mover | Combustion Turbine |
Ownership | Single Owner |
Nameplate Capacity | 84.5 MW |
Nameplate Power Factor | 0.9 |
Summer Capacity | 72.8 MW |
Winter Capacity | 93 MW |
Minimum Load | 56 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | July 2000 |
---|---|
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Natural Gas / Distillate Fuel Oil |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 1H |
Multiple Fuels | Yes |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | Yes |
Multifuel Details | |
Switch When Operating | No |
---|---|
Net Summer Capacity With Natural Gas | 72.8 MW |
Net Winter Capacity With Natural Gas | 93 MW |
Net Summer Capacity With Oil | 75.1 MW |
Net Winter Capacity With Oil | 66.9 MW |
Time To Switch From Gas To Oil | 1H |
Time To Switch From Oil To Gas | 1H |
Factors That Limit Switching | Yes |
Air Permit Limits | Yes |
Johnsonville Plant Owners
Owner Name | Address | Generator | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Natural Gas.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#503 | Martinez Refining | Martinez, CA | 702.3 GWh |
#504 | Deerhaven Generating Station | Gainesville, FL | 673.3 GWh |
#505 | Marathon Bay Area Cogen | Martinez, CA | 661.2 GWh |
#506 | Maddox | Hobbs, NM | 659.1 GWh |
#507 | Topaz Generating | Texas City, TX | 657.2 GWh |
#508 | Mountain Creek | Dallas, TX | 654.1 GWh |
#509 | Plant X | Earth, TX | 660.3 GWh |
#510 | Astoria Generating Station | Astoria, NY | 729.8 GWh |
#511 | Cleveland Cnty Generating Facility | Kings Mountain, NC | 640.9 GWh |
#512 | ExxonMobil Baton Rouge Turbine Generator | Baton Rouge, LA | 639.9 GWh |
#514 | SPA Cogen 3 | Sacramento, CA | 632.0 GWh |
#515 | J K Smith | Winchester, KY | 629.8 GWh |
#516 | Power Station 4 | Texas City, TX | 629.1 GWh |
#517 | Ladysmith | Woodford, VA | 660.1 GWh |
#518 | Greenidge Generation LLC | Dresden, NY | 624.1 GWh |
#519 | Vandolah Power Station | Wauchula, FL | 614.8 GWh |
#520 | Morris Cogeneration LLC | Morris, IL | 611.4 GWh |
#521 | Alliant Energy Neenah | Neenah, WI | 610.1 GWh |
#522 | Masspower | Indian Orchard, MA | 609.1 GWh |
#523 | Gary Works | Gary, IN | 1.2 TWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Johnsonville.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Barkley | Kuttawa, KY | 500.5 GWh | 69.9 mi |
Bi-County Gas Producers | Woodlawn, TN | 11.2 GWh | 43.1 mi |
Cheatham | Ashland City, TN | 177.3 GWh | 47.2 mi |
Cumberland (TN) | Cumberland City, TN | 9.6 TWh | 31.1 mi |
Gleason Generating Facility | Gleason, TN | 37.9 GWh | 38 mi |
Kentucky Dam | Grand Rivers, KY | 1.2 TWh | 69.9 mi |
OETN1 | Obion, TN | 194.4 GWh | 61.3 mi |
Packaging Corp of America | Counce, TN | 409.7 GWh | 69.6 mi |
Pickwick Landing Dam | Pickwick Dam, TN | 1.1 TWh | 67.9 mi |
Providence Solar | Madison, TN | 27.0 GWh | 67.1 mi |
Selmer Farm LLC | Selmer, TN | 24.9 GWh | 68.6 mi |
Selmer I | Selmer, TN | 22.8 GWh | 69 mi |
Selmer II | Selmer, TN | 10.9 GWh | 70.2 mi |
SR Clarksville II, LLC | Clarksville, TN | 62.0 MWh | 50.6 mi |
SR Clarksville, LLC | Clarksville, TN | 93.0 MWh | 50.6 mi |
SR Jackson II | Jackson, TN | 2.2 GWh | 59.7 mi |
SR McKellar | Denmark, TN | 137.5 GWh | 61.3 mi |
SR Paris | Paris, TN | 12.7 GWh | 34.6 mi |
Vanderbilt University Power Plant | Nashville, TN | 94.3 GWh | 66.5 mi |
West Camden | Camden, TN | 39.0 GWh | 9 mi |