Johnson County
831 Sparks Dr., Cleburne, TX 76033Plant Summary Information
Johnson County is ranked #76 out of 304 natural gas power plants in Texas in terms of total annual net electricity generation.
Johnson County is comprised of 2 generators and generated 277.8 GWh during the 3-month period between September 2023 to December 2023.
Plant Name | Johnson County |
---|---|
Utility Name | Johnson County Power LLC |
Location | Johnson County, TX |
Initial Operation Date | September 1996 |
Last Update | Dec 2023 |
Annual Generation | 1.1 TWh |
Annual Consumption | 9.2 M MMBtu |
Ranked #695 out of 11,835 Power Plants Nationwide | |
Ranked #422 out of 2,253 Natural Gas Power Plants Nationwide | |
Ranked #113 out of 749 Texas Power Plants | |
Ranked #76 out of 304 Texas Natural Gas Power Plants | |
Fuel Types | Natural Gas |
Previous Operator |
Brazos Electric Power Coop Inc (2013 to 2022) Johnson County Power LLC (2023 to 2023) |
Map of Johnson County
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Johnson County.
Monthly Net Generation for Johnson County
Johnson County Details
Summary Information | |
---|---|
Plant Name | Johnson County (54817) |
Plant Address | 831 Sparks Dr., Cleburne, TX 76033 |
Utility | Johnson County Power LLC (66083) |
Latitude, Longitude | 32.3994, -97.4078 |
Generation Dates on File | Jan 2001 to Dec 2023 |
Initial Operation Date | September 1996 |
Annual Generation | 1.1 TWh |
Fuel Types | Natural Gas |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Regulated |
NERC Region | TRE |
Balancing Authority | Electric Reliability Council of Texas, Inc. (ERCO) |
NAICS Code | Utilities (22) |
Sector | Electric Utility (1) |
Water Source | Municipality |
Ash Impoundment | No |
Transmission / Distribution Owner | Brazos Electric Power Coop Inc (2172) |
Grid Voltage | 138.00 kV |
Energy Storage | No |
Natural Gas Information | |
Local Distribution Company (LDC) | ATMOS ENERGY CORPORATION |
Natural Gas Storage | No |
Generator ST-1 Details Operating November 1996
Technology | Natural Gas Fired Combined Cycle |
---|---|
Prime Mover | Combined Cycle Steam Part |
Unit Code | CC01 |
Ownership | Single Owner |
Duct Burners | Yes |
RTO ISO LMP Node Designation | TEN_CT1_STG |
RTO ISO Location Designation For Reporting Wholesale Sales Data | TEN_CT1_STG |
Nameplate Capacity | 104.4 MW |
Nameplate Power Factor | 0.9 |
Summer Capacity | 104 MW |
Winter Capacity | 104 MW |
Minimum Load | 100 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | November 1996 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 12H |
Multiple Fuels | No |
Cofire Fuels | No |
Generator GT-1 Details Operating September 1996
Technology | Natural Gas Fired Combined Cycle |
---|---|
Prime Mover | Combined Cycle Combustion Turbine Part |
Unit Code | CC01 |
Ownership | Single Owner |
Can Bypass Heat Recovery Steam Generator | No |
RTO ISO LMP Node Designation | TEN_CC1 |
RTO ISO Location Designation For Reporting Wholesale Sales Data | TEN_CC1 |
Nameplate Capacity | 178.2 MW |
Nameplate Power Factor | 0.9 |
Summer Capacity | 163 MW |
Winter Capacity | 174 MW |
Minimum Load | 100 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | September 1996 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Natural Gas / Distillate Fuel Oil |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 1H |
Multiple Fuels | Yes |
Cofire Fuels | Yes |
Switch Between Oil And Natural Gas | Yes |
Multifuel Details | |
Cofire Energy Source | NG / DFO |
---|---|
Switch When Operating | Yes |
Net Summer Capacity With Natural Gas | 163 MW |
Net Winter Capacity With Natural Gas | 174 MW |
Net Summer Capacity With Oil | 163 MW |
Net Winter Capacity With Oil | 174 MW |
Time To Switch From Gas To Oil | 1H |
Time To Switch From Oil To Gas | 1H |
Factors That Limit Switching | Yes |
Air Permit Limits | Yes |
Johnson County Plant Owners
Owner Name | Address | Generator | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Natural Gas.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#412 | Cope | Cope, SC | 1.7 TWh |
#413 | Lonesome Creek Station | Alexander, ND | 1.2 TWh |
#414 | Graham | Graham, TX | 1.2 TWh |
#415 | Riverton | Riverton, KS | 1.1 TWh |
#416 | Panoche Energy Center | Firebaugh, CA | 1.1 TWh |
#417 | Bowline Point | West Haverstraw, NY | 1.1 TWh |
#418 | Shell Deer Park | Deer Park, TX | 1.4 TWh |
#419 | Tiger Bay | Ft. Meade, FL | 1.1 TWh |
#420 | Air Products Port Arthur | Port Arthur, TX | 1.2 TWh |
#421 | Wilkes | Avinger, TX | 1.1 TWh |
#423 | West Lorain | Lorain, OH | 1.1 TWh |
#424 | Stryker Creek | Jacksonville, TX | 1.1 TWh |
#425 | Ocean State Power II | Harrisville, RI | 1.1 TWh |
#426 | Kyrene | Tempe, AZ | 1.1 TWh |
#427 | El Centro Hybrid | El Centro, CA | 1.1 TWh |
#428 | Arthur Kill Generating Station | Staten Island, NY | 1.1 TWh |
#429 | Blythe Energy Inc | Blythe, CA | 1.1 TWh |
#430 | Deer Creek Station | White, SD | 1.1 TWh |
#431 | Michigan Power LP | Ludington, MI | 1.1 TWh |
#432 | Faribault Energy Park | Faribault, MN | 1.1 TWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Johnson County.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Arlington Outlet Hydroelectric Generator | Fort Worth, TX | 6.9 MWh | 19.1 mi |
BPL Files Solar | Itasca, TX | 282.2 GWh | 24.6 mi |
Comanche Peak | Glen Rose, TX | 19.7 TWh | 23.1 mi |
DeCordova Steam Electric Station | Granbury, TX | 95.5 GWh | 17.1 mi |
Ellis Solar LLC | Midlothian, TX | 122.1 GWh | 21.1 mi |
Handley | Fort Worth, TX | 969.0 GWh | 25.2 mi |
Midlothian Energy Facility | Midlothian, TX | 6.0 TWh | 20.8 mi |
OTHERTraditionClearfork | Fort Worth, TX | 42.0 MWh | 21.3 mi |
TPE Whitney Solar, LLC | Kopperl, TX | 18.8 GWh | 24.4 mi |
WAL284 | Mansfield, TX | 356.0 MWh | 20.3 mi |
WAL3284 | Arlington, TX | 313.0 MWh | 21.8 mi |
WAL3631 | Crowley, TX | 365.0 MWh | 12.9 mi |
WAL3773 | Fort Worth, TX | 371.0 MWh | 25.7 mi |
WAL4509 | Tarrant, TX | 353.0 MWh | 19.6 mi |
WAL5312 | Fort Worth, TX | 296.0 MWh | 26.8 mi |
WAL940 | Westworth Village, TX | 338.0 MWh | 24.6 mi |
WAL972 | Fort Worth, TX | 287.0 MWh | 28.5 mi |
Westside Landfill Gas Recovery | Aledo, TX | 22.0 GWh | 23.7 mi |
Wolf Hollow I LP | Granbury, TX | 3.0 TWh | 19.4 mi |
Wolf Hollow II | Granbury, TX | 7.2 TWh | 19.5 mi |