John Hopkins Middle School Microgrid
701 16th Street S, St Petersburg, FL 33705Plant Summary Information
John Hopkins Middle School Microgrid is ranked #171 out of 171 solar farms in Florida in terms of total annual net electricity generation.
John Hopkins Middle School Microgrid generated 39.0 MWh during the 3-month period between September 2023 to December 2023.
Plant Name | John Hopkins Middle School Microgrid |
---|---|
Utility Name | Duke Energy Florida, LLC |
Location | Pinellas County, FL |
Initial Operation Date | September 2023 |
Last Update | Dec 2023 |
Annual Generation | 39.0 MWh |
Annual Consumption | 133 MMBtu |
Ranked #11,582 out of 11,835 Power Plants Nationwide | |
Ranked #5,621 out of 5,643 Solar Power Plants Nationwide | |
Ranked #278 out of 279 Florida Power Plants | |
Ranked #171 out of 171 Florida Solar Power Plants | |
Fuel Types | Solar |
Map of John Hopkins Middle School Microgrid
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for John Hopkins Middle School Microgrid.
Monthly Net Generation for John Hopkins Middle School Microgrid
John Hopkins Middle School Microgrid Details
Summary Information | |
---|---|
Plant Name | John Hopkins Middle School Microgrid (64752) |
Plant Address | 701 16th Street S, St Petersburg, FL 33705 |
Utility | Duke Energy Florida, LLC (6455) |
Latitude, Longitude | 27.76793, -82.65477 |
Generation Dates on File | Dec 2023 to Dec 2023 |
Initial Operation Date | September 2023 |
Annual Generation | 39.0 MWh |
Fuel Types | Solar |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Regulated |
NERC Region | SERC |
Balancing Authority | Duke Energy Florida Inc (FPC) |
NAICS Code | Utilities (22) |
Sector | Electric Utility (1) |
Water Source | |
Ash Impoundment | |
Transmission / Distribution Owner | Duke Energy Florida, LLC (6455) FL |
Grid Voltage | 12.47 kV |
Energy Storage | Yes |
Generator ES1 Details Operating November 2023
Technology | Batteries |
---|---|
Prime Mover | Battery |
Ownership | Single Owner |
Nameplate Capacity | 2.5 MW |
Summer Capacity | 2.5 MW |
Winter Capacity | 2.5 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | November 2023 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Electricity used for energy storage |
Time From Cold Shutdown To Full Load | 10M |
Energy Storage Details | |
Nameplate Energy Capacity MWH | 18 |
---|---|
Maximum Charge Rate | 2.5 MW |
Maximum Discharge Rate | 2.5 MW |
Storage Technology | LIB |
Nameplate Reactive Power Rating | 3 |
Storage Enclosure Type | CS |
System Peak Shaving | P |
Backup Power | Yes |
Excess Wind And Solar Generation | Yes |
DC Coupled | Yes |
Direct Support Of Another Unit | Yes |
Direct Support Plant Id | 64752 |
Direct Support Gen Id | PV1 |
Support T D Asset | No |
Generator PV1 Details Operating September 2023
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Single Owner |
Nameplate Capacity | 0.8 MW |
Summer Capacity | 0.8 MW |
Winter Capacity | 0.8 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | September 2023 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Solar |
Solar Details | |
Fixed Tilt | Yes |
---|---|
Azimuth Angle | 180 |
Tilt Angle | 7 |
DC Net Capacity | 1 MW |
Crystalline Silicon | Yes |
Net Metering Agreement | No |
Virtual Net Metering Agreement | No |
John Hopkins Middle School Microgrid Plant Owners
Owner Name | Address | Generator | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#5611 | USS Giveback Solar LLC (CSG) | Pueblo, CO | 60.0 MWh |
#5612 | Framingham State University Plant | Framingham, MA | 72.0 MWh |
#5613 | MN Buffalo Lake 212-2 LLC (CSG) | Buffalo Lake, MN | 59.0 MWh |
#5614 | Acushnet MA 1 | Acushnet, MA | 59.0 MWh |
#5615 | Wolverine Solar | Maynard, MN | 59.0 MWh |
#5616 | Bay Avenue CDG | Elizabeth, NJ | 56.0 MWh |
#5617 | Crafton Hills College Solar Farm | Yucaipa, CA | 55.0 MWh |
#5618 | ADP Parsippany NJ | Parsippany, NJ | 46.0 MWh |
#5619 | Houston Solar | Houston, AK | 46.0 MWh |
#5620 | M. G. Emmett J. Bean Federal Center | Indianapolis, IN | 40.9 MWh |
#5622 | Tooele Army Depot(CSG) | Tooele, UT | 2.8 GWh |
#5623 | Bayer - Whippany, NJ | Whippany, NJ | 32.0 MWh |
#5624 | Lemonweir (Oak 1) | Mauston, WI | 30.0 MWh |
#5625 | WMATA - Naylor Rd. Metro | Temple Hills, MD | 29.0 MWh |
#5626 | Park Solar | Woodbridge, CT | 20.0 MWh |
#5627 | Pierre Solar | Pierre, SD | 17.0 MWh |
#5628 | Glenville Solar (CSG) | Glenville, NY | 17.0 MWh |
#5629 | Bluff Prairie (Vernon) | De Soto, WI | 17.0 MWh |
#5630 | Richmond Hill | Richmond, ME | 16.0 MWh |
#5631 | Webster Creek (Oak 2) | New Lisbon, WI | 14.0 MWh |
Nearby Power Plants
Below are closest 20 power plants surrounding John Hopkins Middle School Microgrid.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Bayboro | St. Petersburg, FL | 4.5 GWh | 1.4 mi |
Big Bend | Apollo Beach, FL | 7.7 TWh | 15.5 mi |
Big Bend Agrivoltaics | Apollo Beach, FL | 1.5 GWh | 15.6 mi |
Big Bend Floating Solar I | Gibsonton, FL | 1.7 GWh | 15.9 mi |
Big Bend II Solar | Apollo Beach, FL | 82.1 GWh | 16.2 mi |
H L Culbreath Bayside Power Station | Tampa, FL | 4.9 TWh | 17.1 mi |
Hillsborough County Resource Recovery | Tampa, FL | 178.9 GWh | 23.1 mi |
IKEA Tampa 042 | Tampa, FL | 1.5 GWh | 18.7 mi |
Little Manatee River Solar | Ruskin, FL | 134.8 GWh | 15.8 mi |
Lockheed Martin Solar System | Oldsmar, FL | 2.9 GWh | 19.4 mi |
Manatee | Parrish, FL | 7.0 TWh | 22 mi |
Manatee Solar Energy Center | Parrish, FL | 13.9 GWh | 21.4 mi |
McKay Bay Facility | Tampa, FL | 69.8 GWh | 19 mi |
Mosaic Co Tampa Facility | Riverview, FL | 133.7 GWh | 17.4 mi |
P L Bartow | St. Petersburg, FL | 6.2 TWh | 7.1 mi |
Pinellas County Resource Recovery | St. Petersburg, FL | 420.7 GWh | 7.4 mi |
Riverside Solar | Ruskin, FL | 106.4 GWh | 12.6 mi |
TIA Solar | Tampa, FL | 3.2 GWh | 15.6 mi |
Tropicana Products Bradent | Bradenton, FL | 188.1 GWh | 20.7 mi |
Wimauma Solar | Wimauma, FL | 135.6 GWh | 24.1 mi |