John Day
HWY 84 exit, Rufus, OR 97050Plant Summary Information
John Day is ranked #5 out of 1,371 hydroelectric power plants nationwide in terms of total annual net electricity generation.
John Day is comprised of 16 generators and generated 1.7 TWh during the 3-month period between May 2024 to August 2024.
Plant Name | John Day |
---|---|
Utility Name | USACE Northwestern Division |
Location | Sherman County, OR |
Initial Operation Date | August 1968 |
Last Update | Aug 2024 |
Annual Generation | 6.9 TWh |
Annual Consumption | 25.4 M MMBtu |
Ranked #133 out of 11,835 Power Plants Nationwide | |
Ranked #5 out of 1,371 Water Power Plants Nationwide | |
Ranked #1 out of 255 Oregon Power Plants | |
Ranked #1 out of 60 Oregon Water Power Plants | |
Fuel Types | Water |
Map of John Day
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for John Day.
Monthly Net Generation for John Day
John Day Details
Summary Information | |
---|---|
Plant Name | John Day (3082) |
Plant Address | HWY 84 exit, Rufus, OR 97050 |
Utility | USACE Northwestern Division (19400) |
Latitude, Longitude | 45.71644, -120.69408 |
Generation Dates on File | Jan 2001 to Aug 2024 |
Initial Operation Date | August 1968 |
Annual Generation | 6.9 TWh |
Fuel Types | Water |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Regulated |
NERC Region | WECC |
Balancing Authority | Bonneville Power Administration (BPAT) |
NAICS Code | Utilities (22) |
Sector | Electric Utility (1) |
Water Source | Columbia River |
Ash Impoundment | No |
Transmission / Distribution Owner | Bonneville Power Administration (1738) OR |
Grid Voltage | 500.00 kV |
Energy Storage | No |
Generator 3 Details Operating November 1968
Technology | Conventional Hydroelectric |
---|---|
Prime Mover | Hydroelectric Turbine |
Ownership | Single Owner |
Nameplate Capacity | 135 MW |
Nameplate Power Factor | 0.95 |
Summer Capacity | 129 MW |
Winter Capacity | 129 MW |
Minimum Load | 52 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | November 1968 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Water |
Time From Cold Shutdown To Full Load | 10M |
Other Planned Modifications | No |
Multiple Fuels | No |
Generator 4 Details OA December 1968
Technology | Conventional Hydroelectric |
---|---|
Prime Mover | Hydroelectric Turbine |
Ownership | Single Owner |
Nameplate Capacity | 135 MW |
Nameplate Power Factor | 0.95 |
Summer Capacity | 118 MW |
Winter Capacity | 118 MW |
Minimum Load | 52 MW |
Uprate/Derate Completed | No |
Status | OA |
---|---|
First Operation Date | December 1968 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Water |
Time From Cold Shutdown To Full Load | 10M |
Other Planned Modifications | No |
Multiple Fuels | No |
Generator 1 Details Operating August 1968
Technology | Conventional Hydroelectric |
---|---|
Prime Mover | Hydroelectric Turbine |
Ownership | Single Owner |
Nameplate Capacity | 135 MW |
Nameplate Power Factor | 0.95 |
Summer Capacity | 135 MW |
Winter Capacity | 135 MW |
Minimum Load | 52 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | August 1968 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Water |
Time From Cold Shutdown To Full Load | 10M |
Other Planned Modifications | No |
Multiple Fuels | No |
Generator 2 Details Operating September 1968
Technology | Conventional Hydroelectric |
---|---|
Prime Mover | Hydroelectric Turbine |
Ownership | Single Owner |
Nameplate Capacity | 135 MW |
Nameplate Power Factor | 0.95 |
Summer Capacity | 135 MW |
Winter Capacity | 135 MW |
Minimum Load | 52 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | September 1968 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Water |
Time From Cold Shutdown To Full Load | 10M |
Other Planned Modifications | No |
Multiple Fuels | No |
Generator 5 Details Operating February 1969
Technology | Conventional Hydroelectric |
---|---|
Prime Mover | Hydroelectric Turbine |
Ownership | Single Owner |
Nameplate Capacity | 135 MW |
Nameplate Power Factor | 0.95 |
Summer Capacity | 135 MW |
Winter Capacity | 135 MW |
Minimum Load | 52 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | February 1969 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Water |
Time From Cold Shutdown To Full Load | 10M |
Other Planned Modifications | No |
Multiple Fuels | No |
Generator 6 Details Operating March 1969
Technology | Conventional Hydroelectric |
---|---|
Prime Mover | Hydroelectric Turbine |
Ownership | Single Owner |
Nameplate Capacity | 135 MW |
Nameplate Power Factor | 0.95 |
Summer Capacity | 135 MW |
Winter Capacity | 135 MW |
Minimum Load | 52 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | March 1969 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Water |
Time From Cold Shutdown To Full Load | 10M |
Other Planned Modifications | No |
Multiple Fuels | No |
Generator 7 Details Out of Service April 1969
Technology | Conventional Hydroelectric |
---|---|
Prime Mover | Hydroelectric Turbine |
Ownership | Single Owner |
Nameplate Capacity | 135 MW |
Nameplate Power Factor | 0.95 |
Summer Capacity | 135 MW |
Winter Capacity | 135 MW |
Minimum Load | 52 MW |
Uprate/Derate Completed | No |
Status | Out of Service |
---|---|
First Operation Date | April 1969 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Water |
Time From Cold Shutdown To Full Load | 10M |
Other Planned Modifications | No |
Multiple Fuels | No |
Generator 8 Details Operating June 1969
Technology | Conventional Hydroelectric |
---|---|
Prime Mover | Hydroelectric Turbine |
Ownership | Single Owner |
Nameplate Capacity | 135 MW |
Nameplate Power Factor | 0.95 |
Summer Capacity | 118 MW |
Winter Capacity | 118 MW |
Minimum Load | 52 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | June 1969 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Water |
Time From Cold Shutdown To Full Load | 10M |
Other Planned Modifications | No |
Multiple Fuels | No |
Generator 9 Details Operating August 1969
Technology | Conventional Hydroelectric |
---|---|
Prime Mover | Hydroelectric Turbine |
Ownership | Single Owner |
Nameplate Capacity | 135 MW |
Nameplate Power Factor | 0.95 |
Summer Capacity | 118 MW |
Winter Capacity | 118 MW |
Minimum Load | 52 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | August 1969 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Water |
Time From Cold Shutdown To Full Load | 10M |
Other Planned Modifications | No |
Multiple Fuels | No |
Generator 10 Details Operating September 1969
Technology | Conventional Hydroelectric |
---|---|
Prime Mover | Hydroelectric Turbine |
Ownership | Single Owner |
Nameplate Capacity | 135 MW |
Nameplate Power Factor | 0.95 |
Summer Capacity | 135 MW |
Winter Capacity | 135 MW |
Minimum Load | 52 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | September 1969 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Water |
Time From Cold Shutdown To Full Load | 10M |
Other Planned Modifications | No |
Multiple Fuels | No |
Generator 13 Details Operating December 1970
Technology | Conventional Hydroelectric |
---|---|
Prime Mover | Hydroelectric Turbine |
Ownership | Single Owner |
Nameplate Capacity | 135 MW |
Nameplate Power Factor | 0.95 |
Summer Capacity | 135 MW |
Winter Capacity | 135 MW |
Minimum Load | 52 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | December 1970 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Water |
Time From Cold Shutdown To Full Load | 10M |
Other Planned Modifications | No |
Multiple Fuels | No |
Generator 11 Details Operating March 1970
Technology | Conventional Hydroelectric |
---|---|
Prime Mover | Hydroelectric Turbine |
Ownership | Single Owner |
Nameplate Capacity | 135 MW |
Nameplate Power Factor | 0.95 |
Summer Capacity | 118 MW |
Winter Capacity | 118 MW |
Minimum Load | 52 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | March 1970 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Water |
Time From Cold Shutdown To Full Load | 10M |
Other Planned Modifications | No |
Multiple Fuels | No |
Generator 12 Details Operating May 1970
Technology | Conventional Hydroelectric |
---|---|
Prime Mover | Hydroelectric Turbine |
Ownership | Single Owner |
Nameplate Capacity | 135 MW |
Nameplate Power Factor | 0.95 |
Summer Capacity | 118 MW |
Winter Capacity | 118 MW |
Minimum Load | 52 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | May 1970 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Water |
Time From Cold Shutdown To Full Load | 10M |
Other Planned Modifications | No |
Multiple Fuels | No |
Generator 14 Details Operating January 1971
Technology | Conventional Hydroelectric |
---|---|
Prime Mover | Hydroelectric Turbine |
Ownership | Single Owner |
Nameplate Capacity | 135 MW |
Nameplate Power Factor | 0.95 |
Summer Capacity | 118 MW |
Winter Capacity | 118 MW |
Minimum Load | 52 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | January 1971 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Water |
Time From Cold Shutdown To Full Load | 10M |
Other Planned Modifications | No |
Multiple Fuels | No |
Generator 15 Details Operating October 1971
Technology | Conventional Hydroelectric |
---|---|
Prime Mover | Hydroelectric Turbine |
Ownership | Single Owner |
Nameplate Capacity | 135 MW |
Nameplate Power Factor | 0.95 |
Summer Capacity | 135 MW |
Winter Capacity | 135 MW |
Minimum Load | 52 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | October 1971 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Water |
Time From Cold Shutdown To Full Load | 10M |
Other Planned Modifications | No |
Multiple Fuels | No |
Generator 16 Details Operating December 1971
Technology | Conventional Hydroelectric |
---|---|
Prime Mover | Hydroelectric Turbine |
Ownership | Single Owner |
Nameplate Capacity | 135 MW |
Nameplate Power Factor | 0.95 |
Summer Capacity | 135 MW |
Winter Capacity | 135 MW |
Minimum Load | 52 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | December 1971 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Water |
Time From Cold Shutdown To Full Load | 10M |
Other Planned Modifications | No |
Multiple Fuels | No |
John Day Plant Owners
Owner Name | Address | Generator | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Water.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#1 | Robert Moses Niagara | Lewiston, NY | 15.8 TWh |
#2 | Grand Coulee | Grand Coulee, WA | 15.0 TWh |
#3 | Chief Joseph | Bridgeport, WA | 8.9 TWh |
#4 | Robert Moses Power Dam | Massena, NY | 7.5 TWh |
#6 | The Dalles | The Dalles, OR | 5.4 TWh |
#7 | Rocky Reach | Wenatchee, WA | 4.8 TWh |
#8 | Wanapum | Beverly, WA | 3.9 TWh |
#9 | Priest Rapids | Mattawa, WA | 3.7 TWh |
#10 | McNary | Umatilla, OR | 3.6 TWh |
#11 | Bonneville | Cascade Locks, OR | 3.5 TWh |
#12 | Wells | Pateros, WA | 3.4 TWh |
#13 | Boundary | Metaline, WA | 3.1 TWh |
#14 | Glen Canyon Dam | Page, AZ | 2.8 TWh |
#15 | Shasta | Redding, CA | 2.4 TWh |
#16 | Edward C Hyatt | Oroville, CA | 2.4 TWh |
#17 | Wilson Dam | Muscle Shoals, AL | 2.2 TWh |
#18 | Garrison | Riverside, ND | 2.1 TWh |
#19 | Conowingo | Darlington, MD | 2.1 TWh |
#20 | Brownlee | Cambridge, ID | 2.1 TWh |
#21 | Oahe | Pierre, SD | 2.1 TWh |
Nearby Power Plants
Below are closest 20 power plants surrounding John Day.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Biglow Canyon Wind Farm | Wasco, OR | 926.4 GWh | 6.2 mi |
Golden Hill Wind | Wasco, OR | 584.0 GWh | 10.6 mi |
Goldendale Generating Station | Goldendale, WA | 2.2 TWh | 9.4 mi |
Goodnoe Hills | Goldendale, WA | 223.9 GWh | 9.5 mi |
Harvest Wind Project | Roosevelt, WA | 216.8 GWh | 18 mi |
Hay Canyon Wind Power LLC | Wasco, OR | 175.4 GWh | 14.8 mi |
Klondike Wind Power | Wasco, OR | 30.9 GWh | 13.1 mi |
Klondike Windpower II | Wasco, OR | 229.2 GWh | 11.2 mi |
Klondike Windpower III | Wasco, OR | 681.0 GWh | 13 mi |
Leaning Juniper Wind Power II | Arlington, OR | 378.1 GWh | 21.4 mi |
Linden Wind Energy Project | Goldendale, WA | 116.7 GWh | 4.7 mi |
Lund Hill Solar | Bickleton, WA | 342.2 GWh | 20.2 mi |
PaTu Wind Farm LLC | Wasco, OR | 25.5 GWh | 8.1 mi |
Star Point Wind Project LLC | Wasco, OR | 194.0 GWh | 17.6 mi |
Tuolumne Wind Project | Goldendale, WA | 329.8 GWh | 12.5 mi |
Waste Management Columbia Ridge LFGTE | Arlington, OR | 81.0 GWh | 21.6 mi |
Wheat Field Wind Power Project | Arlington, OR | 190.8 GWh | 18.3 mi |
White Creek Wind Farm | Roosevelt, WA | 446.8 GWh | 18.3 mi |
Windy Flats Wind Project | Centerville, WA | 567.8 GWh | 6.8 mi |
WyEast Solar | Wasco, OR | 19.6 GWh | 10.2 mi |