Jicarilla Solar 1 LLC
405 Indian Rt J36, Dulce, NM 87528Plant Summary Information
Jicarilla Solar 1 LLC is ranked #14 out of 83 solar farms in New Mexico in terms of total annual net electricity generation.
Jicarilla Solar 1 LLC generated 29.6 GWh during the 3-month period between June 2024 to September 2024.
Plant Name | Jicarilla Solar 1 LLC |
---|---|
Utility Name | Repsol Renewables NA |
Location | Rio Arriba County, NM |
Initial Operation Date | July 2023 |
Last Update | Sep 2024 |
Annual Generation | 66.9 GWh |
Annual Consumption | 247.1 k MMBtu |
Ranked #3,594 out of 11,852 Power Plants Nationwide | |
Ranked #708 out of 5,655 Solar Power Plants Nationwide | |
Ranked #56 out of 137 New Mexico Power Plants | |
Ranked #14 out of 83 New Mexico Solar Power Plants | |
Fuel Types | Solar |
Map of Jicarilla Solar 1 LLC
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Jicarilla Solar 1 LLC.
Monthly Net Generation for Jicarilla Solar 1 LLC
Jicarilla Solar 1 LLC Details
Summary Information | |
---|---|
Plant Name | Jicarilla Solar 1 LLC (66163) |
Plant Address | 405 Indian Rt J36, Dulce, NM 87528 |
Utility | Repsol Renewables NA (65265) |
Latitude, Longitude | 36.31675, -107.27763 |
Generation Dates on File | Jul 2023 to Sep 2024 |
Initial Operation Date | July 2023 |
Annual Generation | 66.9 GWh |
Fuel Types | Solar |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | WECC |
Balancing Authority | Public Service Company of New Mexico (PNM) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | |
Ash Impoundment | No |
Transmission / Distribution Owner | Public Service Co of NM (15473) NM |
Grid Voltage | 345.00 kV |
Energy Storage | Yes |
Generator JICB1 Details Operating July 2023
Technology | Batteries |
---|---|
Prime Mover | Battery |
Ownership | Single Owner |
Nameplate Capacity | 20 MW |
Nameplate Power Factor | 0.95 |
Summer Capacity | 20 MW |
Winter Capacity | 20 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | July 2023 |
---|---|
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Electricity used for energy storage |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Energy Storage Details | |
Nameplate Energy Capacity MWH | 80 |
---|---|
Maximum Charge Rate | 20 MW |
Maximum Discharge Rate | 20 MW |
Storage Technology | LIB |
Nameplate Reactive Power Rating | 6.6 |
Storage Enclosure Type | CS |
Load Management | P |
Ac Coupled | Yes |
Direct Support Of Another Unit | No |
Support T D Asset | Yes |
Generator JICS1 Details Operating July 2023
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Single Owner |
Nameplate Capacity | 50 MW |
Nameplate Power Factor | 0.95 |
Summer Capacity | 50 MW |
Winter Capacity | 50 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | July 2023 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Solar |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Solar Details | |
Single Axis Tracking | Yes |
---|---|
DC Net Capacity | 61.8 MW |
Crystalline Silicon | Yes |
Net Metering Agreement | No |
Virtual Net Metering Agreement | No |
Jicarilla Solar 1 LLC Plant Owners
Owner Name | Address | Generator | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#698 | Great Cove Solar II | Saint Thomas, PA | 74.3 GWh |
#699 | San Luis Valley Solar Ranch | Mosca, CO | 73.4 GWh |
#700 | Roadrunner Solar | Santa Teresa, NM | 72.6 GWh |
#701 | SJA Solar LLC-Solterra Monastery CSG | Spencer, MA | 72.5 GWh |
#702 | Edwards Sanborn S4 | Mojave, CA | 71.6 GWh |
#703 | Moody Air Force Base Solar | Valdosta, GA | 72.2 GWh |
#704 | Hoot Lake Solar | Fergus Falls, MN | 71.8 GWh |
#705 | Alpaugh 50 | Alpaugh, CA | 71.7 GWh |
#706 | Bluebell Solar | Sterling City, TX | 71.0 GWh |
#707 | Avalon Solar | Pima, AZ | 70.9 GWh |
#709 | Albany Solar (WI) | Broadhead, WI | 69.7 GWh |
#710 | Three Corners Solar | Unity, ME | 69.3 GWh |
#711 | Chaves County Solar II | Roswell, NM | 68.9 GWh |
#712 | Great Cove Solar | McConnellsburg, PA | 68.0 GWh |
#713 | Central 40 | Newman, CA | 67.9 GWh |
#714 | Caprock Solar 1 LLC | San Jon, NM | 67.5 GWh |
#715 | Innovative Solar 67 | Willard, NC | 66.7 GWh |
#716 | New Market Solar | Sardinia, OH | 66.3 GWh |
#717 | Castle Solar, LLC | Huntington, UT | 66.0 GWh |
#718 | Chevron - Lost Hills Hybrid | Lost Hills, CA | 65.7 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Jicarilla Solar 1 LLC.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Abiquiu Dam | Abiquiu, NM | 47.8 GWh | 47.9 mi |
Alcalde Solar Array | Alcalde, NM | 6.0 GWh | 70.7 mi |
Arroyo Solar Energy Storage Hybrid | Pueblo Pintado, NM | 653.6 GWh | 28.7 mi |
Bluffview | Farmington, NM | 278.9 GWh | 58.9 mi |
Cibola | Seboyeta, NM | 19.2 GWh | 77.1 mi |
Cuba 2.5ac, LLC | Cuba, NM | 6.0 GWh | 27.7 mi |
El Vado Dam | Tierra Amarilla, NM | 1.9 GWh | 35.8 mi |
Encino Solar Energy Center | Rio Rancho Estates, NM | 142.2 GWh | 70.5 mi |
Four Corners | Fruitland, NM | 8.0 TWh | 71.7 mi |
Jicarilla Solar 2 | Dulce, NM | 122.1 GWh | 13.5 mi |
Los Alamos PV Site | Los Alamos, NM | 526.0 MWh | 62 mi |
Navajo Dam | Farmington, NM | 91.4 GWh | 38.6 mi |
NMRD Data Center III, LLC | Rio Ranchero, NM | 138.0 GWh | 69.5 mi |
OE_ESCL | Grants, NM | 180.0 GWh | 77.3 mi |
Red Mesa Wind LLC | Seboyeta, NM | 201.1 GWh | 72.6 mi |
Sandoval Solar Energy Center | Rio Rancho, NM | 15.6 GWh | 76 mi |
Sue Cleveland High School | Rio Rancho, NM | 2.1 GWh | 77.5 mi |
Syncarpha El Rito | El Rito, NM | 3.8 GWh | 60.5 mi |
Vallecito Hydroelectric | Bayfield, CO | 25.7 GWh | 75.2 mi |
Williams Ignacio Natural Gas Plant | Durango, CO | 47.9 GWh | 63.8 mi |