Jicarilla Solar 1 LLC
405 Indian Rt J36, Dulce, NM 87528Plant Summary Information
Jicarilla Solar 1 LLC is ranked #15 out of 85 solar farms in New Mexico in terms of total annual net electricity generation.
Jicarilla Solar 1 LLC generated 17.1 GWh during the 3-month period between November 2024 to February 2025.
Plant Name | Jicarilla Solar 1 LLC |
---|---|
Utility Name | Repsol Renewables NA |
Location | Rio Arriba County, NM |
Initial Operation Date | July 2023 |
Last Update | Feb 2025 |
Annual Generation | 80.5 GWh |
Annual Consumption | 307.6 k MMBtu |
Ranked #3,491 out of 11,993 Power Plants Nationwide | |
Ranked #713 out of 5,778 Solar Power Plants Nationwide | |
Ranked #53 out of 140 New Mexico Power Plants | |
Ranked #15 out of 85 New Mexico Solar Power Plants | |
Fuel Types | Solar |
Map of Jicarilla Solar 1 LLC
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Jicarilla Solar 1 LLC.
Monthly Net Generation for Jicarilla Solar 1 LLC
Jicarilla Solar 1 LLC Details
Summary Information | |
---|---|
Plant Name | Jicarilla Solar 1 LLC (66163) |
Plant Address | 405 Indian Rt J36, Dulce, NM 87528 |
Utility | Repsol Renewables NA (65265) |
Latitude, Longitude | 36.31675, -107.27763 |
Generation Dates on File | Jul 2023 to Feb 2025 |
Initial Operation Date | July 2023 |
Annual Generation | 80.5 GWh |
Fuel Types | Solar |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | WECC |
Balancing Authority | Public Service Company of New Mexico (PNM) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | |
Ash Impoundment | No |
Transmission / Distribution Owner | Public Service Co of NM (15473) NM |
Grid Voltage | 345.00 kV |
Energy Storage | Yes |
Generator JICB1 Details Operating July 2023
Technology | Batteries |
---|---|
Prime Mover | Battery |
Ownership | Single Owner |
Nameplate Capacity | 20 MW |
Nameplate Power Factor | 0.95 |
Summer Capacity | 20 MW |
Winter Capacity | 20 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | July 2023 |
---|---|
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Electricity used for energy storage |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Energy Storage Details | |
Nameplate Energy Capacity MWH | 80 |
---|---|
Maximum Charge Rate | 20 MW |
Maximum Discharge Rate | 20 MW |
Storage Technology | LIB |
Nameplate Reactive Power Rating | 6.6 |
Storage Enclosure Type | CS |
Load Management | P |
Ac Coupled | Yes |
Direct Support Of Another Unit | No |
Support T D Asset | Yes |
Generator JICS1 Details Operating July 2023
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Single Owner |
Nameplate Capacity | 50 MW |
Nameplate Power Factor | 0.95 |
Summer Capacity | 50 MW |
Winter Capacity | 50 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | July 2023 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Solar |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Solar Details | |
Single Axis Tracking | Yes |
---|---|
DC Net Capacity | 61.8 MW |
Crystalline Silicon | Yes |
Net Metering Agreement | No |
Virtual Net Metering Agreement | No |
Jicarilla Solar 1 LLC Plant Owners
Owner Name | Address | Generator | Ownership |
---|---|---|---|
We couldn't locate any owners for this plant |
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#703 | Sunnybrook Solar Project - Hybrid | Scottsburg, VA | 86.9 GWh |
#704 | Red Rock | Red Rock, AZ | 86.8 GWh |
#705 | Black Mesa Solar, LLC | King Hill, ID | 85.7 GWh |
#706 | Edwards Sanborn S3 | Mojave, CA | 81.1 GWh |
#707 | Sycamore Solar | Gretna, VA | 85.5 GWh |
#708 | Little Bear Solar 1, LLC | Mendota, CA | 85.3 GWh |
#709 | Citrus Ridge Solar | Bay Lake, FL | 85.2 GWh |
#710 | Hazlehurst II | Hazlehurst, GA | 84.4 GWh |
#711 | Hazlehurst III | Hazlehurst, GA | 84.0 GWh |
#712 | Grazing Yak Solar | Calhan, CO | 83.9 GWh |
#714 | Otter Creek Solar | Chase City, VA | 83.1 GWh |
#715 | Seville 2 | Ocotillo Wells, CA | 83.0 GWh |
#716 | Spectrum Solar PV Power Project | Las Vegas, NV | 83.0 GWh |
#717 | Great Cove Solar | McConnellsburg, PA | 82.9 GWh |
#718 | Markum Solar Farm | Valley Mills, TX | 82.0 GWh |
#719 | Eden Solar LLC | Ellerbe, NC | 81.2 GWh |
#720 | Quinebaug Solar | Canterbury, CT | 80.7 GWh |
#721 | Broad River Solar, LLC | Mooresboro, NC | 80.6 GWh |
#722 | Fox Creek Solar | Louisburg, NC | 80.6 GWh |
#723 | High River Energy Center, LLC | Florida, NY | 80.5 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Jicarilla Solar 1 LLC.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Abiquiu Dam | Abiquiu, NM | 47.8 GWh | 47.9 mi |
Alcalde Solar Array | Alcalde, NM | 6.0 GWh | 70.7 mi |
Arroyo Solar Energy Storage Hybrid | Pueblo Pintado, NM | 708.5 GWh | 28.7 mi |
Bluffview | Farmington, NM | 297.9 GWh | 58.9 mi |
Cibola | Seboyeta, NM | 19.2 GWh | 77.1 mi |
Cuba 2.5ac, LLC | Cuba, NM | 6.0 GWh | 27.7 mi |
El Vado Dam | Tierra Amarilla, NM | 1.9 GWh | 35.8 mi |
Encino Solar Energy Center | Rio Rancho Estates, NM | 143.8 GWh | 70.5 mi |
Four Corners | Fruitland, NM | 7.3 TWh | 71.7 mi |
Jicarilla Solar 2 | Dulce, NM | 119.8 GWh | 13.5 mi |
Los Alamos PV Site | Los Alamos, NM | 447.0 MWh | 62 mi |
Navajo Dam | Farmington, NM | 91.4 GWh | 38.6 mi |
NMRD Data Center III, LLC | Rio Ranchero, NM | 139.5 GWh | 69.5 mi |
OE_ESCL | Grants, NM | 352.5 GWh | 77.3 mi |
Red Mesa Wind LLC | Seboyeta, NM | 201.1 GWh | 72.6 mi |
San Juan Solar I | Kirtland, NM | 107.0 GWh | 69.8 mi |
Sandoval Solar Energy Center | Rio Rancho, NM | 15.6 GWh | 76 mi |
Syncarpha El Rito | El Rito, NM | 3.8 GWh | 60.5 mi |
Vallecito Hydroelectric | Bayfield, CO | 25.7 GWh | 75.2 mi |
Williams Ignacio Natural Gas Plant | Durango, CO | 48.5 GWh | 63.8 mi |