JBER Landfill Gas Power Plant
58900 Davis Highway, Anchorage, AK 99505Plant Summary Information
JBER Landfill Gas Power Plant is ranked #49 out of 299 landfill gas power plants nationwide in terms of total annual net electricity generation.
JBER Landfill Gas Power Plant is comprised of 5 generators and generated 10.5 GWh during the 3-month period between June 2024 to September 2024.
Plant Name | JBER Landfill Gas Power Plant |
---|---|
Utility Name | Doyon Utilities, LLC |
Location | Anchorage Municipality, AK |
Initial Operation Date | August 2012 |
Last Update | Sep 2024 |
Annual Generation | 41.2 GWh |
Annual Consumption | 461.5 k MMBtu |
Ranked #4,118 out of 11,852 Power Plants Nationwide | |
Ranked #49 out of 299 Landfill Gas Power Plants Nationwide | |
Ranked #27 out of 130 Alaska Power Plants | |
Ranked #1 out of 1 Alaska Landfill Gas Power Plants | |
Fuel Types | Landfill Gas : 99.9% |
Map of JBER Landfill Gas Power Plant
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for JBER Landfill Gas Power Plant.
Monthly Net Generation for JBER Landfill Gas Power Plant
JBER Landfill Gas Power Plant Details
Summary Information | |
---|---|
Plant Name | JBER Landfill Gas Power Plant (58380) |
Plant Address | 58900 Davis Highway, Anchorage, AK 99505 |
Utility | Doyon Utilities, LLC (58368) |
Latitude, Longitude | 61.286, -149.61 |
Generation Dates on File | Jan 2013 to Sep 2024 |
Initial Operation Date | August 2012 |
Annual Generation | 41.2 GWh |
Fuel Types | Landfill Gas : 99.9% |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Regulated |
NERC Region | |
Balancing Authority | () |
NAICS Code | National Security and International Affairs (928) |
Sector | Commercial Non-CHP (4) |
Water Source | |
Ash Impoundment | No |
Transmission / Distribution Owner | Chugach Electric Assn Inc (3522) AK |
Grid Voltage | 34.50 kV |
Energy Storage | No |
Natural Gas Information | |
Local Distribution Company (LDC) | ENSTAR NAT GAS |
Natural Gas Storage | No |
Liquefied Natural Gas Storage | No |
Generator 1 Details Operating August 2012
Technology | Landfill Gas |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Single Owner |
Nameplate Capacity | 2.3 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 1.4 MW |
Winter Capacity | 1.4 MW |
Minimum Load | 1 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | August 2012 |
---|---|
Combined Heat & Power | No |
Sector Name | Commercial Non-CHP (4) |
Energy Source | Landfill Gas / Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | Yes |
Cofire Fuels | Yes |
Switch Between Oil And Natural Gas | No |
Multifuel Details | |
Cofire Energy Source | NG / LFG |
---|
Generator 2 Details Operating August 2012
Technology | Landfill Gas |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Single Owner |
Nameplate Capacity | 2.3 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 1.4 MW |
Winter Capacity | 1.4 MW |
Minimum Load | 1 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | August 2012 |
---|---|
Combined Heat & Power | No |
Sector Name | Commercial Non-CHP (4) |
Energy Source | Landfill Gas / Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | Yes |
Cofire Fuels | Yes |
Switch Between Oil And Natural Gas | No |
Multifuel Details | |
Cofire Energy Source | NG / LFG |
---|
Generator 3 Details Operating August 2012
Technology | Landfill Gas |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Single Owner |
Nameplate Capacity | 2.3 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 1.4 MW |
Winter Capacity | 1.4 MW |
Minimum Load | 1 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | August 2012 |
Combined Heat & Power | No |
---|---|
Sector Name | Commercial Non-CHP (4) |
Energy Source | Landfill Gas / Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Other Combustion Technology | No |
Multiple Fuels | Yes |
Cofire Fuels | Yes |
Switch Between Oil And Natural Gas | No |
Multifuel Details | |
Cofire Energy Source | NG / LFG |
---|
Generator 4 Details Operating August 2012
Technology | Landfill Gas |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Single Owner |
Nameplate Capacity | 2.3 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 1.4 MW |
Winter Capacity | 1.4 MW |
Minimum Load | 1 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | August 2012 |
Combined Heat & Power | No |
---|---|
Sector Name | Commercial Non-CHP (4) |
Energy Source | Landfill Gas / Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Other Combustion Technology | No |
Multiple Fuels | Yes |
Cofire Fuels | Yes |
Switch Between Oil And Natural Gas | No |
Multifuel Details | |
Cofire Energy Source | NG / LFG |
---|
Generator 5 Details Operating August 2013
Technology | Landfill Gas |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Single Owner |
Nameplate Capacity | 2.3 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 1.4 MW |
Winter Capacity | 1.4 MW |
Minimum Load | 1 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | August 2013 |
Combined Heat & Power | No |
---|---|
Sector Name | Commercial Non-CHP (4) |
Energy Source | Landfill Gas / Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Other Combustion Technology | No |
Multiple Fuels | Yes |
Cofire Fuels | Yes |
Switch Between Oil And Natural Gas | No |
Multifuel Details | |
Cofire Energy Source | NG / LFG |
---|
JBER Landfill Gas Power Plant Plant Owners
Owner Name | Address | Generator | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Landfill Gas.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#39 | Waste Management Rolling Meadows LFGTE | Topeka, KS | 45.4 GWh |
#40 | Turnkey Landfill Gas Recovery | Rochester, NH | 44.8 GWh |
#41 | Green Knight Energy Center | Pen Argyl, PA | 44.0 GWh |
#42 | Metro Gas Recovery | Franklin, WI | 43.9 GWh |
#43 | Zimmerman Energy | Argos, IN | 43.5 GWh |
#44 | Brent Run Generating Station | Montrose, MI | 43.4 GWh |
#45 | MM Prince William Energy | Manassas, VA | 43.1 GWh |
#46 | Brunswick Landfill Gas | Lawrenceville, VA | 45.1 GWh |
#47 | Coffin Butte | Corvallis, OR | 42.3 GWh |
#48 | Chaffee Gas Recovery | Chaffee, NY | 41.4 GWh |
#50 | Pioneer Crossing Energy, LLC | Birdsboro, PA | 41.1 GWh |
#51 | JED Solid Waste Mgmt Renewable Energy | St. Cloud, FL | 40.6 GWh |
#52 | Pheasant Run Landfill Gas Recovery | Bristol, WI | 40.5 GWh |
#53 | Georgia LFG Pine Ridge Plant | Griffin, GA | 40.0 GWh |
#54 | CSL Gas Recovery | Pompano Beach, FL | 40.0 GWh |
#55 | MM West Covina | West Covina, CA | 39.9 GWh |
#56 | Coopersville | Coopersville, MI | 39.6 GWh |
#57 | Lakeview Gas Recovery | Erie, PA | 39.5 GWh |
#58 | Altamont Gas Recovery | Livermore, CA | 39.4 GWh |
#59 | West Camden | Camden, TN | 39.0 GWh |
Nearby Power Plants
Below are closest 14 power plants surrounding JBER Landfill Gas Power Plant.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Beluga | Beluga, AK | 9.0 GWh | 47.9 mi |
Bradley Lake | Homer, AK | 395.1 GWh | 113.5 mi |
Cooper Lake | Cooper Landing, AK | 46.4 GWh | 61.8 mi |
Eklutna Generation Station | Chugiak, AK | 717.0 GWh | 14.6 mi |
Eklutna Hydro Project | Palmer, AK | 197.8 GWh | 20.1 mi |
Fire Island Wind | Anchorage, AK | 46.3 GWh | 23.7 mi |
George M Sullivan Generation Plant 2 | Anchorage, AK | 911.3 GWh | 5.3 mi |
Hank Nikkels Plant 1 | Anchorage, AK | 37.1 GWh | 9.6 mi |
Houston Solar | Houston, AK | 46.0 MWh | 21.8 mi |
Nikiski Combined Cycle | Nikiski, AK | 416.8 GWh | 72.7 mi |
Seward (AK) | Seward, AK | 507.0 MWh | 80 mi |
Soldotna | Soldotna, AK | 21.6 GWh | 71.6 mi |
Southcentral Power Project | Anchorage, AK | 905.3 GWh | 12.8 mi |
Tesoro Kenai Cogeneration Plant | Kenai, AK | 48.3 GWh | 72.8 mi |