Jayhawk Wind Energy Center is ranked #31 out of 152 power plants in Kansas in terms of total annual net electricity generation.
Jayhawk Wind Energy Center generated 123.0 GWh during the 3-month period between July 2024 to October 2024.
Plant Name | Jayhawk Wind Energy Center |
---|---|
Utility Name | Invenergy Services LLC |
Location | Crawford County, KS |
Initial Operation Date | December 2021 |
Last Update | Oct 2024 |
Annual Generation | 660.6 GWh |
Annual Consumption | 2.5 M MMBtu |
Ranked #1,026 out of 11,866 Power Plants Nationwide | |
Ranked #218 out of 1,345 Wind Power Plants Nationwide | |
Ranked #31 out of 152 Kansas Power Plants | |
Ranked #24 out of 49 Kansas Wind Power Plants | |
Fuel Types | Wind |
Map of Jayhawk Wind Energy Center
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Jayhawk Wind Energy Center.
Monthly Net Generation for Jayhawk Wind Energy Center
Jayhawk Wind Energy Center Details
Summary Information | |
---|---|
Plant Name | Jayhawk Wind Energy Center (65129) |
Plant Address | 631 Calvary Road, Hepler, KS 66746 |
Utility | Invenergy Services LLC (49893) |
Latitude, Longitude | 37.70446, -95.02982 |
Generation Dates on File | Jan 2022 to Oct 2024 |
Initial Operation Date | December 2021 |
Annual Generation | 660.6 GWh |
Fuel Types | Wind |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | MRO |
Balancing Authority | Southwest Power Pool (SWPP) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | |
Ash Impoundment | No |
Transmission / Distribution Owner | Evergy Kansas Central, Inc (22500) KS |
Grid Voltage | 161.00 kV |
Energy Storage | No |
Generator 65010 Details Operating January 2022
Technology | Onshore Wind Turbine |
---|---|
Prime Mover | Wind Turbine, Onshore |
Ownership | Jointly Owned |
Nameplate Capacity | 197.4 MW |
Summer Capacity | 197.4 MW |
Winter Capacity | 197.4 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | January 2022 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Wind |
Turbines/Hydrokinetic Buoys | 70 |
Turbine Details | |
Number Of Turbines | 70 |
---|---|
Predominant Turbine Manufacturer | GE |
Predominant Turbine Model Number | 2.82-127 |
Design Wind Speed | 18.8 MPH |
Wind Quality Class | 3 - Low Wind |
Turbine Hub Height Feet | 114 |
Jayhawk Wind Energy Center Plant Owners
Owner Name | Address | Ownership |
---|---|---|
Invenergy Services LLC | 1 S. Wacker Dr. Ste. 1800, Chicago, IL 60606 | 10.00% |
WEC Energy Group | 231 W. Michigan St., Milwaukee, WI 53203 | 90.00% |
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Wind.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#208 | West Raymond Wind Farm LLC | Lyford, TX | 681.5 GWh |
#209 | Cedar Point Wind | Limon, CO | 678.6 GWh |
#210 | Tucannon River Wind Farm | Dayton, WA | 678.5 GWh |
#211 | Wildcat Ranch Wind Project | Morton, TX | 678.0 GWh |
#212 | Pattern Gulf Wind | Armstrong, TX | 675.6 GWh |
#213 | Big Sky Wind LLC | Ohio, IL | 674.7 GWh |
#214 | Bearkat | St. Lawrence, TX | 673.9 GWh |
#215 | Hidalgo Wind Farm LLC | McCook, TX | 673.9 GWh |
#216 | Cross Winds Energy Park | Unionville, MI | 669.5 GWh |
#217 | Bloom Wind | Minneola, KS | 669.0 GWh |
#219 | Peetz Table Wind Energy | Peetz, CO | 653.2 GWh |
#220 | Wildcat Wind Farm I, LLC | Elwood, IN | 649.9 GWh |
#221 | North Bend Wind Project, LLC | Highmore, SD | 649.6 GWh |
#222 | BMP Wind (TX) | Baird, TX | 648.7 GWh |
#223 | Sugar Creek Wind One LLC | TBD, IL | 648.1 GWh |
#224 | Bronco Plains Wind II, LLC | Kit Carson, CO | 647.6 GWh |
#225 | Wildorado Wind LLC | Vega, TX | 643.2 GWh |
#226 | Meadow Lake Wind Farm VI LLC | Remington, IN | 642.7 GWh |
#227 | Kelly Creek Wind Project | Cabery, IL | 638.0 GWh |
#228 | Brady II Wind Energy Center | Dickinson, ND | 637.5 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Jayhawk Wind Energy Center.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Burlington (KS) | Burlington, KS | 117.0 MWh | 51.8 mi |
Chanute 2 | Chanute, KS | 79.2 GWh | 23.4 mi |
Chanute 3 | Chanute, KS | 694.0 MWh | 24.5 mi |
East Kansas Agri-Energy, LLC | Garnett, KS | 5.0 GWh | 40.9 mi |
Erie | Erie, KS | 7.0 MWh | 14.8 mi |
Erie Energy Center | Erie, KS | 1.9 GWh | 14.5 mi |
Fredonia | Fredonia, KS | 15.0 MWh | 44.3 mi |
Garnett Municipal | Garnett, KS | 9.0 MWh | 40.8 mi |
Girard | Girard, KS | 185.0 MWh | 17.1 mi |
Iola | Iola, KS | 909.0 MWh | 26.4 mi |
La Cygne | La Cygne, KS | 5.5 TWh | 49.1 mi |
Neosho Ridge Wind Energy Center | Galesburg, KS | 1.3 TWh | 24.3 mi |
Nevada | Nevada, MO | 1.1 GWh | 38.8 mi |
North Fork Ridge Wind Energy Center | Mindenmines, MO | 521.9 GWh | 35.8 mi |
Oak Grove Power Producers | Arcadia, KS | 20.2 GWh | 21.9 mi |
Prairie Queen Wind Farm | Moran, KS | 632.1 GWh | 21.7 mi |
Prosperity Solar Farm CSG | Joplin, MO | 4.0 GWh | 51.6 mi |
Riverton | Riverton, KS | 1.2 TWh | 47.3 mi |
State Line Combined Cycle | Joplin, MO | 2.5 TWh | 49.7 mi |
Wolf Creek Generating Station | Burlington, KS | 9.2 TWh | 51.6 mi |