James H Miller Jr
42050 Porter Road, Quinton, AL 35073Plant Summary Information
James H Miller Jr is ranked #22 out of 11,835 power plants nationwide in terms of total annual net electricity generation.
James H Miller Jr is comprised of 4 generators and generated 4.7 TWh during the 3-month period between May 2024 to August 2024.
Plant Name | James H Miller Jr |
---|---|
Utility Name | Alabama Power Co |
Location | Jefferson County, AL |
Initial Operation Date | October 1978 |
Last Update | Aug 2024 |
Annual Generation | 17.1 TWh |
Annual Consumption | 192.4 M MMBtu |
Ranked #22 out of 11,835 Power Plants Nationwide | |
Ranked #1 out of 132 Subbituminous Coal Power Plants Nationwide | |
Ranked #2 out of 75 Alabama Power Plants | |
Ranked #1 out of 1 Alabama Subbituminous Coal Power Plants | |
Fuel Types | Subbituminous Coal : 99.2% Natural Gas : 0.8% |
Map of James H Miller Jr
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for James H Miller Jr.
Monthly Net Generation for James H Miller Jr
James H Miller Jr Details
Summary Information | |
---|---|
Plant Name | James H Miller Jr (6002) |
Plant Address | 42050 Porter Road, Quinton, AL 35073 |
Utility | Alabama Power Co (195) |
Latitude, Longitude | 33.6319, -87.0597 |
Generation Dates on File | Jan 2001 to Aug 2024 |
Initial Operation Date | October 1978 |
Annual Generation | 17.1 TWh |
Fuel Types | Subbituminous Coal : 99.2% Natural Gas : 0.8% |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Regulated |
NERC Region | SERC |
Balancing Authority | Southern Company Services, Inc. - Trans (SOCO) |
NAICS Code | Utilities (22) |
Sector | Electric Utility (1) |
Water Source | Black Warrior River |
Ash Impoundment | Yes Not Lined Operating |
Transmission / Distribution Owner | Alabama Power Co (195) AL |
Grid Voltage | 500.00 kV |
Energy Storage | No |
Natural Gas Information | |
Pipeline Name | Alabama Gas Corp |
Natural Gas Storage | No |
Generator 1 Details Operating October 1978
Technology | Conventional Steam Coal |
---|---|
Prime Mover | Steam Turbine |
Ownership | Jointly Owned |
Nameplate Capacity | 705.5 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 687.8 MW |
Winter Capacity | 687.8 MW |
Minimum Load | 300 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | October 1978 |
---|---|
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Subbituminous Coal |
Startup Source | Natural Gas |
Solid Fuel Gasification | No |
Time From Cold Shutdown To Full Load | OVER |
Pulverized Coal Technology | Yes |
Subcritical Technology | Yes |
Multiple Fuels | No |
Generator 2 Details Operating May 1985
Technology | Conventional Steam Coal |
---|---|
Prime Mover | Steam Turbine |
Ownership | Jointly Owned |
Nameplate Capacity | 705.5 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 692.7 MW |
Winter Capacity | 692.7 MW |
Minimum Load | 300 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | May 1985 |
---|---|
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Subbituminous Coal |
Startup Source | Natural Gas |
Solid Fuel Gasification | No |
Time From Cold Shutdown To Full Load | OVER |
Pulverized Coal Technology | Yes |
Subcritical Technology | Yes |
Multiple Fuels | No |
Generator 3 Details Operating May 1989
Technology | Conventional Steam Coal |
---|---|
Prime Mover | Steam Turbine |
Ownership | Single Owner |
Nameplate Capacity | 705.5 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 693 MW |
Winter Capacity | 693 MW |
Minimum Load | 300 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | May 1989 |
---|---|
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Subbituminous Coal |
Startup Source | Natural Gas |
Solid Fuel Gasification | No |
Time From Cold Shutdown To Full Load | OVER |
Pulverized Coal Technology | Yes |
Subcritical Technology | Yes |
Multiple Fuels | No |
Generator 4 Details Operating March 1991
Technology | Conventional Steam Coal |
---|---|
Prime Mover | Steam Turbine |
Ownership | Single Owner |
Nameplate Capacity | 705.5 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 704 MW |
Winter Capacity | 704 MW |
Minimum Load | 300 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | March 1991 |
---|---|
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Subbituminous Coal |
Startup Source | Natural Gas |
Solid Fuel Gasification | No |
Time From Cold Shutdown To Full Load | OVER |
Pulverized Coal Technology | Yes |
Subcritical Technology | Yes |
Multiple Fuels | No |
James H Miller Jr Plant Owners
Owner Name | Address | Generator | Ownership |
---|---|---|---|
PowerSouth Energy Cooperative | 2027 E Three Notch St, Andalusia, AL 36421 | Generator 1 | 8.16% |
Alabama Power Co | 600 North 18th Street, Birmingham, AL 35291 | Generator 1 | 91.84% |
PowerSouth Energy Cooperative | 2027 E Three Notch St, Andalusia, AL 36421 | Generator 2 | 8.16% |
Alabama Power Co | 600 North 18th Street, Birmingham, AL 35291 | Generator 2 | 91.84% |
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Subbituminous Coal.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#2 | Labadie | Labadie, MO | 15.7 TWh |
#3 | Martin Lake | Tatum, TX | 11.0 TWh |
#4 | Monroe (MI) | Monroe, MI | 13.0 TWh |
#5 | W A Parish | Thompsons, TX | 11.6 TWh |
#6 | Colstrip | Colstrip, MT | 9.2 TWh |
#7 | Sherburne County | Becker, MN | 7.5 TWh |
#8 | Scherer | Juliette, GA | 7.3 TWh |
#9 | Laramie River Station | Wheatland, WY | 7.2 TWh |
#10 | J H Campbell | West Olive, MI | 7.2 TWh |
#11 | Fayette Power Project | La Grange, TX | 7.0 TWh |
#12 | Jim Bridger | Point of Rocks, WY | 8.4 TWh |
#13 | Gerald Gentleman | Sutherland, NE | 6.7 TWh |
#14 | Baldwin Energy Complex | Baldwin, IL | 6.4 TWh |
#15 | Springerville | Springerville, AZ | 6.4 TWh |
#16 | J K Spruce | San Antonio, TX | 6.1 TWh |
#17 | Nebraska City | Nebraska City, NE | 6.1 TWh |
#18 | Independence Steam Electric Station | Newark, AR | 5.9 TWh |
#19 | Comanche (CO) | Pueblo, CO | 5.7 TWh |
#20 | Walter Scott Jr Energy Center | Council Bluffs, IA | 5.5 TWh |
#21 | La Cygne | La Cygne, KS | 5.5 TWh |
Nearby Power Plants
Below are closest 20 power plants surrounding James H Miller Jr.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
ABC Coke | Tarrant, AL | 83.0 MWh | 16.5 mi |
AMEA Peaking | Sylacauga, AL | 46.3 GWh | 55.2 mi |
ANAD Solar Array | Anniston Army Depot, AL | 10.7 GWh | 62.7 mi |
Bankhead Dam | Northport, AL | 138.7 GWh | 20.9 mi |
Caledonia | Steens, MS | 4.8 TWh | 69.7 mi |
Calhoun Energy Center | Eastaboga, AL | 270.0 GWh | 62.6 mi |
Decatur Energy Center | Decatur, AL | 3.0 TWh | 68.9 mi |
Decatur-Morgan Co LFG Recovery Project | Trinity, AL | 10.7 GWh | 68.6 mi |
E C Gaston | Wilsonville, AL | 3.9 TWh | 43.8 mi |
Guntersville | Guntersville, AL | 453.4 GWh | 66.5 mi |
H Neely Henry Dam | Ohatchee, AL | 196.7 GWh | 58.8 mi |
Holt Dam | Tuscaloosa, AL | 154.5 GWh | 34.4 mi |
Lay Dam | Clanton, AL | 454.7 GWh | 55.8 mi |
Lewis Smith Dam | Jasper, AL | 233.4 GWh | 21.5 mi |
Logan Martin Dam | Vincent, AL | 343.5 GWh | 44 mi |
Mitchell Dam | Verbena, AL | 409.4 GWh | 67.2 mi |
Morgan Energy Center | Decatur, AL | 4.5 TWh | 69.6 mi |
Tenaska Lindsay Hill Generating Station | Billingsley, AL | 1.5 TWh | 70.2 mi |
U S Alliance Coosa Pines | Coosa Pines, AL | 139.3 GWh | 45.6 mi |
Westervelt Moundville Cogen | Moundville, AL | 32.7 GWh | 57.7 mi |