Jacumba Solar Farm
47311 Old Highway 80, Jacumba, CA 91934Plant Summary Information
Jacumba Solar Farm is ranked #201 out of 747 solar farms in California in terms of total annual net electricity generation.
Jacumba Solar Farm generated 10.7 GWh during the 3-month period between September 2022 to December 2022.
Plant Name | Jacumba Solar Farm |
---|---|
Utility Name | AEP Renewables |
Location | San Diego County, CA |
Initial Operation Date | July 2017 |
Last Update | Dec 2022 |
Annual Generation | 41.7 GWh |
Annual Consumption | 151.9 k MMBtu |
Ranked #4,033 out of 11,249 Power Plants Nationwide | |
Ranked #772 out of 5,158 Solar Power Plants Nationwide | |
Ranked #536 out of 1,501 California Power Plants | |
Ranked #201 out of 747 California Solar Power Plants | |
Fuel Types | Solar |
Previous Operator |
Jacumba Solar, LLC (2016 to 2016) AEP Renewables (2017 to 2022) |
Map of Jacumba Solar Farm
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Jacumba Solar Farm.
Monthly Net Generation for Jacumba Solar Farm
Jacumba Solar Farm Details
Summary Information | |
---|---|
Plant Name | Jacumba Solar Farm (60947) |
Plant Address | 47311 Old Highway 80 Jacumba, CA 91934 |
Utility | AEP Renewables (60639) |
Latitude, Longitude | 32.6212, -116.12896 |
Generation Dates on File | Jul 2017 to Dec 2022 |
Initial Operation Date | July 2017 |
Annual Generation | 41.7 GWh |
Fuel Types | Solar |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | WECC |
Balancing Authority | California Independent System Operator (CISO) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | |
Ash Impoundment | No |
Transmission / Distribution Owner | San Diego Gas & Electric Co (16609) CA |
Grid Voltage | 138.00 kV |
Energy Storage | No |
Generator Q644A Details Operating July 2017
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Single Owner |
Nameplate Capacity | 20 MW |
Summer Capacity | 20 MW |
Winter Capacity | 20 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | July 2017 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Solar |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Solar Details | |
Fixed Tilt | Yes |
---|---|
Azimuth Angle | 180 |
Tilt Angle | 25 |
DC Net Capacity | 28.2 MW |
Crystalline Silicon | Yes |
Net Metering Agreement | No |
Virtual Net Metering Agreement | No |
Jacumba Solar Farm Plant Owners
Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#762 | Nicolis Solar PV Plant | Delano, CA | 42.4 GWh |
#763 | Montross Solar | Montross, VA | 42.3 GWh |
#764 | Temperance Solar, LLC | Erie, MI | 42.1 GWh |
#765 | Hyder Solar Hybrid | Hyder, AZ | 42.1 GWh |
#766 | Fusion Solar Center LLC | Baltic, CT | 42.0 GWh |
#767 | Red Rock | Red Rock, AZ | 41.9 GWh |
#768 | RE Rosamond Two LLC | Rosamond, CA | 41.8 GWh |
#769 | DG AMP Solar Bowling Green | Bowling Green, OH | 41.8 GWh |
#770 | Westlands Solar PV Farm | Huron, CA | 41.8 GWh |
#771 | Fort Huachuca Solar PV Project | Sierra Vista, AZ | 41.7 GWh |
#773 | EDF Ph1 Toms River | Tom's River, NJ | 41.7 GWh |
#774 | Stillwater Facility | Fallon, NV | 146.2 GWh |
#775 | Apple Data Center PV | Maiden, NC | 41.6 GWh |
#776 | Apple Data Center - PV2 | Conover, NC | 41.5 GWh |
#777 | Energix Buckingham, LLC | Cumberland, VA | 41.4 GWh |
#778 | Montgomery Solar LLC | Biscoe, NC | 41.4 GWh |
#779 | CPV Maple Hill Solar | Portage, PA | 41.2 GWh |
#780 | Calipatria Solar Farm | Calipatria, CA | 41.2 GWh |
#781 | Pasquotank | Elizabeth City, NC | 40.9 GWh |
#782 | Five Forks Solar | Macon, NC | 40.8 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Jacumba Solar Farm.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Campo Verde Solar | El Centro, CA | 363.2 GWh | 25.1 mi |
Centinela Solar Energy | Calexico, CA | 523.7 GWh | 28.4 mi |
Centinela State Prison | Sacramento, CA | 17.8 GWh | 24.6 mi |
Drew Solar LLC | Calexico, CA | 320.2 GWh | 27.3 mi |
Golden Acorn Casino | Campo, CA | 5.0 GWh | 14.3 mi |
Imperial Solar Energy Center South | Calexico, CA | 302.7 GWh | 27.5 mi |
Imperial Solar Energy Center West | Seeley, CA | 444.2 GWh | 22.9 mi |
Imperial Valley Solar, LLC | Calexico, CA | 354.8 GWh | 31.7 mi |
Kumeyaay Wind | Campo, CA | 143.8 GWh | 13.7 mi |
Mount Signal Solar Farm II | Calexico, CA | 399.8 GWh | 29.3 mi |
Mount Signal Solar Farm V | Calexico, CA | 668.7 GWh | 32.9 mi |
Ocotillo Express LLC | Ocotillo, CA | 613.8 GWh | 10.3 mi |
Ocotillo Wells | Borrego Springs, CA | 35.2 GWh | 31.4 mi |
SEPV Imperial Dixieland East | Imperial, CA | 5.5 GWh | 23.8 mi |
SEPV Imperial Dixieland West | Imperial, CA | 8.1 GWh | 23.6 mi |
Seville 2 | Ocotillo Wells, CA | 89.9 GWh | 34.5 mi |
Tule Wind LLC | Boulevard, CA | 423.1 GWh | 9.8 mi |
USG 1 | El Centro, CA | 3.0 GWh | 19.7 mi |
USG 2 | El Centro, CA | 1.8 GWh | 19.4 mi |
Wistaria Ranch Solar | Calexico, CA | 297.0 GWh | 29.9 mi |