Jackson Generating Station
2219 Chapin St, Jackson, MI 49203Plant Summary Information
Jackson Generating Station is ranked #12 out of 242 power plants in Michigan in terms of total annual net electricity generation.
Jackson Generating Station is comprised of 9 generators and generated 380.5 GWh during the 3-month period between December 2023 to March 2024.
Plant Name | Jackson Generating Station |
---|---|
Utility Name | Consumers Energy Co |
Location | Jackson County, MI |
Initial Operation Date | July 2002 |
Last Update | Mar 2024 |
Annual Generation | 2.0 TWh |
Annual Consumption | 17.3 M MMBtu |
Ranked #526 out of 11,249 Power Plants Nationwide | |
Ranked #324 out of 2,188 Natural Gas Power Plants Nationwide | |
Ranked #12 out of 242 Michigan Power Plants | |
Ranked #7 out of 71 Michigan Natural Gas Power Plants | |
Fuel Types | Natural Gas |
Previous Operator |
AlphaGen Power LLC (2013 to 2014) Consumers Energy Co (2015 to 2022) |
Map of Jackson Generating Station
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Jackson Generating Station.
Monthly Net Generation for Jackson Generating Station
Jackson Generating Station Details
Summary Information | |
---|---|
Plant Name | Jackson Generating Station (55270) |
Plant Address | 2219 Chapin St Jackson, MI 49203 |
Utility | Consumers Energy Co (4254) |
Latitude, Longitude | 42.2488, -84.3767 |
Generation Dates on File | Jul 2002 to Mar 2024 |
Initial Operation Date | July 2002 |
Annual Generation | 2.0 TWh |
Fuel Types | Natural Gas |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | Yes |
FERC Exempt Wholesale Generator Docket Number | 02-110-000; '02-111 |
Regulatory Information | |
---|---|
Regulatory Status | Regulated |
NERC Region | RFC |
Balancing Authority | Midcontinent Independent Transmission System Operator, Inc.. (MISO) |
NAICS Code | Utilities (22) |
Sector | Electric Utility (1) |
Water Source | Municipality |
Ash Impoundment | No |
Transmission / Distribution Owner | ITC Transmission (56068) MI |
Grid Voltage | 138.00 kV |
Energy Storage | No |
Natural Gas Information | |
Pipeline Name | VECTOR PIPELINE CO |
Natural Gas Storage | No |
Generator 7EA Details Operating July 2002
Technology | Natural Gas Fired Combined Cycle |
---|---|
Prime Mover | Combined Cycle Combustion Turbine Part |
Unit Code | CC1 |
Ownership | Single Owner |
Can Bypass Heat Recovery Steam Generator | No |
RTO ISO LMP Node Designation | CONS.CC.PLYM |
RTO ISO Location Designation For Reporting Wholesale Sales Data | CONS.CC.PLYM |
Nameplate Capacity | 79 MW |
Nameplate Power Factor | 0.9 |
Summer Capacity | 72.5 MW |
Winter Capacity | 75.5 MW |
Minimum Load | 45 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | July 2002 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 12H |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator LM1 Details Operating July 2002
Technology | Natural Gas Fired Combined Cycle |
---|---|
Prime Mover | Combined Cycle Combustion Turbine Part |
Unit Code | CC1 |
Ownership | Single Owner |
Can Bypass Heat Recovery Steam Generator | No |
RTO ISO LMP Node Designation | CONS.CC.PLYM |
RTO ISO Location Designation For Reporting Wholesale Sales Data | CONS.CC.PLYM |
Nameplate Capacity | 60 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 46.2 MW |
Winter Capacity | 48.1 MW |
Minimum Load | 12 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | July 2002 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 12H |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator LM2 Details Operating July 2002
Technology | Natural Gas Fired Combined Cycle |
---|---|
Prime Mover | Combined Cycle Combustion Turbine Part |
Unit Code | CC1 |
Ownership | Single Owner |
Can Bypass Heat Recovery Steam Generator | No |
RTO ISO LMP Node Designation | CONS.CC.PLYM |
RTO ISO Location Designation For Reporting Wholesale Sales Data | CONS.CC.PLYM |
Nameplate Capacity | 60 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 45 MW |
Winter Capacity | 46.8 MW |
Minimum Load | 12 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | July 2002 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 12H |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator LM3 Details Operating July 2002
Technology | Natural Gas Fired Combined Cycle |
---|---|
Prime Mover | Combined Cycle Combustion Turbine Part |
Unit Code | CC1 |
Ownership | Single Owner |
Can Bypass Heat Recovery Steam Generator | No |
RTO ISO LMP Node Designation | CONS.CC.PLYM |
RTO ISO Location Designation For Reporting Wholesale Sales Data | CONS.CC.PLYM |
Nameplate Capacity | 60 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 44.3 MW |
Winter Capacity | 46.1 MW |
Minimum Load | 12 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | July 2002 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Natural Gas |
Solid Fuel Gasification | No |
Time From Cold Shutdown To Full Load | 12H |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator LM4 Details Operating July 2002
Technology | Natural Gas Fired Combined Cycle |
---|---|
Prime Mover | Combined Cycle Combustion Turbine Part |
Unit Code | CC1 |
Ownership | Single Owner |
Can Bypass Heat Recovery Steam Generator | No |
RTO ISO LMP Node Designation | CONS.CC.PLYM |
RTO ISO Location Designation For Reporting Wholesale Sales Data | CONS.CC.PLYM |
Nameplate Capacity | 60 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 44.4 MW |
Winter Capacity | 46.2 MW |
Minimum Load | 12 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | July 2002 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Natural Gas |
Solid Fuel Gasification | No |
Time From Cold Shutdown To Full Load | 12H |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator LM5 Details Operating July 2002
Technology | Natural Gas Fired Combined Cycle |
---|---|
Prime Mover | Combined Cycle Combustion Turbine Part |
Unit Code | CC1 |
Ownership | Single Owner |
Can Bypass Heat Recovery Steam Generator | No |
RTO ISO LMP Node Designation | CONS.CC.PLYM |
RTO ISO Location Designation For Reporting Wholesale Sales Data | CONS.CC.PLYM |
Nameplate Capacity | 60 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 42.9 MW |
Winter Capacity | 44.6 MW |
Minimum Load | 12 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | July 2002 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Natural Gas |
Solid Fuel Gasification | No |
Time From Cold Shutdown To Full Load | 12H |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator LM6 Details Operating July 2002
Technology | Natural Gas Fired Combined Cycle |
---|---|
Prime Mover | Combined Cycle Combustion Turbine Part |
Unit Code | CC1 |
Ownership | Single Owner |
Can Bypass Heat Recovery Steam Generator | No |
RTO ISO LMP Node Designation | CONS.CC.PLYM |
RTO ISO Location Designation For Reporting Wholesale Sales Data | CONS.CC.PLYM |
Nameplate Capacity | 60 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 44.6 MW |
Winter Capacity | 46.4 MW |
Minimum Load | 12 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | July 2002 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Natural Gas |
Solid Fuel Gasification | No |
Time From Cold Shutdown To Full Load | 12H |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator ST1 Details Operating July 2002
Technology | Natural Gas Fired Combined Cycle |
---|---|
Prime Mover | Combined Cycle Steam Part |
Unit Code | CC1 |
Ownership | Single Owner |
Duct Burners | Yes |
RTO ISO LMP Node Designation | CONS.CC.PLYM |
RTO ISO Location Designation For Reporting Wholesale Sales Data | CONS.CC.PLYM |
Nameplate Capacity | 105 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 100.6 MW |
Winter Capacity | 104.8 MW |
Minimum Load | 12 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | July 2002 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Natural Gas |
Solid Fuel Gasification | No |
Time From Cold Shutdown To Full Load | 12H |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator ST2 Details Operating July 2002
Technology | Natural Gas Fired Combined Cycle |
---|---|
Prime Mover | Combined Cycle Steam Part |
Unit Code | CC1 |
Ownership | Single Owner |
Duct Burners | Yes |
RTO ISO LMP Node Designation | CONS.CC.PLYM |
RTO ISO Location Designation For Reporting Wholesale Sales Data | CONS.CC.PLYM |
Nameplate Capacity | 105 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 97.3 MW |
Winter Capacity | 101.5 MW |
Minimum Load | 12 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | July 2002 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Natural Gas |
Solid Fuel Gasification | No |
Time From Cold Shutdown To Full Load | 12H |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Jackson Generating Station Plant Owners
Owner Name | Address | Generator | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Natural Gas.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#314 | Athens Generating Plant | Athens, NY | 2.1 TWh |
#315 | West Deptford Energy Station | West Deptford, NJ | 2.1 TWh |
#316 | Coyote Springs | Boardman, OR | 2.1 TWh |
#317 | Sand Hill | Austin, TX | 2.1 TWh |
#318 | Watson Cogeneration | Carson, CA | 2.6 TWh |
#319 | Harry Allen | Las Vegas, NV | 2.1 TWh |
#320 | Jones | Lubbock, TX | 2.1 TWh |
#321 | Anclote | Holiday, FL | 2.1 TWh |
#322 | Mankato Energy Center | Mankato, MN | 2.0 TWh |
#323 | Hay Road | Wilmington, DE | 2.0 TWh |
#325 | River Road Gen Plant | Vancouver, WA | 2.0 TWh |
#326 | Dow St Charles Operations | Taft, LA | 2.0 TWh |
#327 | Houston Chemical Complex Battleground | Houston, TX | 2.0 TWh |
#328 | Treasure Coast Energy Center | Ft. Pierce, FL | 2.0 TWh |
#329 | Sutter Energy Center | Yuba City, CA | 2.0 TWh |
#330 | Mystic Generating Station | Charlestown, MA | 1.9 TWh |
#331 | Desert Star Energy Center | Boulder City, NV | 1.9 TWh |
#332 | C D McIntosh Jr | Lakeland, FL | 1.9 TWh |
#333 | Langley Gulch Power Plant | New Plymouth, ID | 1.8 TWh |
#334 | Urquhart | Beech Island, SC | 1.8 TWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Jackson Generating Station.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
13 Mile Solar, LLC | Battle Creek, MI | 4.2 GWh | 34.8 mi |
Adrian Energy Associates LLC | Adrian, MI | 10.7 GWh | 31.6 mi |
Bullhead Solar, LLC | Fayette, MI | 4.1 GWh | 25.1 mi |
Calhoun Solar | Battle Creek, MI | 350.1 GWh | 34.9 mi |
Cereal City Solar, LLC | Battle Creek, MI | 31.6 GWh | 33.7 mi |
Colfax | Fowlerville, MI | 61.0 MWh | 31.7 mi |
Crescent Wind Park | Hillsdale, MI | 398.6 GWh | 22.3 mi |
Delta Energy Park | Lansing, MI | 1.0 TWh | 33.7 mi |
Delta Solar Power I | Grand Ledge, MI | 14.1 GWh | 35.3 mi |
Delta Solar Power II | Grand Ledge, MI | 27.2 GWh | 35.7 mi |
GRS C&C | Marshall, MI | 22.5 GWh | 33 mi |
Hendershot Solar, LLC | Tecumseh, MI | 4.2 GWh | 31.1 mi |
Hillsdale | Hillsdale, MI | 995.7 MWh | 27.1 mi |
Lansing BWL REO Town Plant | Lansing, MI | 703.3 GWh | 33.7 mi |
Marshall (MI) | Marshall, MI | 553.0 MWh | 28.9 mi |
Spartan PV 1, LLC | East Lansing, MI | 13.1 GWh | 32.7 mi |
T B Simon Power Plant | East Lansing, MI | 262.2 GWh | 32.9 mi |
The Andersons Albion Ethanol LLC | Albion, MI | 65.4 GWh | 21.1 mi |
University of Michigan | Ann Arbor, MI | 242.0 GWh | 32.9 mi |
Warner Lambert | Ann Arbor, MI | 21.9 GWh | 34.5 mi |