J Strom Thurmond
384 Power Plant Road, Clarks Hill, SC 29821Plant Summary Information
J Strom Thurmond is ranked #16 out of 190 power plants in South Carolina in terms of total annual net electricity generation.
J Strom Thurmond is comprised of 7 generators and generated 84.3 GWh during the 3-month period between September 2023 to December 2023.
Plant Name | J Strom Thurmond |
---|---|
Utility Name | USCE-Savannah District |
Location | McCormick County, SC |
Initial Operation Date | January 1953 |
Last Update | Dec 2023 |
Annual Generation | 632.4 GWh |
Annual Consumption | 2.4 M MMBtu |
Ranked #1,047 out of 11,852 Power Plants Nationwide | |
Ranked #62 out of 1,371 Water Power Plants Nationwide | |
Ranked #16 out of 190 South Carolina Power Plants | |
Ranked #1 out of 29 South Carolina Water Power Plants | |
Fuel Types | Water |
Map of J Strom Thurmond
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for J Strom Thurmond.
Monthly Net Generation for J Strom Thurmond
J Strom Thurmond Details
Summary Information | |
---|---|
Plant Name | J Strom Thurmond (3323) |
Plant Address | 384 Power Plant Road, Clarks Hill, SC 29821 |
Utility | USCE-Savannah District (19375) |
Latitude, Longitude | 33.6602, -82.1961 |
Generation Dates on File | Jan 2001 to Dec 2023 |
Initial Operation Date | January 1953 |
Annual Generation | 632.4 GWh |
Fuel Types | Water |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Regulated |
NERC Region | SERC |
Balancing Authority | Southeastern Power Administration (SEPA) |
NAICS Code | Utilities (22) |
Sector | Electric Utility (1) |
Water Source | Savannah River |
Ash Impoundment | No |
Transmission / Distribution Owner | Duke Energy Carolinas, LLC (5416) SC |
Grid Voltage | 115.00 kV |
Energy Storage | No |
Generator 1 Details Operating January 1953
Technology | Conventional Hydroelectric |
---|---|
Prime Mover | Hydroelectric Turbine |
Ownership | Single Owner |
Nameplate Capacity | 51.7 MW |
Nameplate Power Factor | 0.9 |
Summer Capacity | 48 MW |
Winter Capacity | 48 MW |
Minimum Load | 25 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | January 1953 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Water |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Generator 2 Details Operating January 1953
Technology | Conventional Hydroelectric |
---|---|
Prime Mover | Hydroelectric Turbine |
Ownership | Single Owner |
Nameplate Capacity | 51.7 MW |
Nameplate Power Factor | 0.9 |
Summer Capacity | 48 MW |
Winter Capacity | 48 MW |
Minimum Load | 25 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | January 1953 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Water |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Generator 3 Details Operating January 1953
Technology | Conventional Hydroelectric |
---|---|
Prime Mover | Hydroelectric Turbine |
Ownership | Single Owner |
Nameplate Capacity | 51.7 MW |
Nameplate Power Factor | 0.9 |
Summer Capacity | 48 MW |
Winter Capacity | 48 MW |
Minimum Load | 25 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | January 1953 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Water |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Generator 4 Details Operating January 1953
Technology | Conventional Hydroelectric |
---|---|
Prime Mover | Hydroelectric Turbine |
Ownership | Single Owner |
Nameplate Capacity | 51.7 MW |
Nameplate Power Factor | 0.9 |
Summer Capacity | 48 MW |
Winter Capacity | 48 MW |
Minimum Load | 25 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | January 1953 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Water |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Generator 5 Details Operating January 1954
Technology | Conventional Hydroelectric |
---|---|
Prime Mover | Hydroelectric Turbine |
Ownership | Single Owner |
Nameplate Capacity | 51.7 MW |
Nameplate Power Factor | 0.9 |
Summer Capacity | 48 MW |
Winter Capacity | 48 MW |
Minimum Load | 25 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | January 1954 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Water |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Generator 6 Details Operating January 1954
Technology | Conventional Hydroelectric |
---|---|
Prime Mover | Hydroelectric Turbine |
Ownership | Single Owner |
Nameplate Capacity | 51.7 MW |
Nameplate Power Factor | 0.9 |
Summer Capacity | 48 MW |
Winter Capacity | 48 MW |
Minimum Load | 25 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | January 1954 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Water |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Generator 7 Details Operating January 1954
Technology | Conventional Hydroelectric |
---|---|
Prime Mover | Hydroelectric Turbine |
Ownership | Single Owner |
Nameplate Capacity | 51.7 MW |
Nameplate Power Factor | 0.9 |
Summer Capacity | 48 MW |
Winter Capacity | 48 MW |
Minimum Load | 25 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | January 1954 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Water |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
J Strom Thurmond Plant Owners
Owner Name | Address | Generator | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Water.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#52 | Bull Shoals | Mountain Home, AR | 750.5 GWh |
#53 | Big Creek 3 | Auberry, CA | 745.8 GWh |
#54 | Great Lakes Hydro America - ME | Millinocket, ME | 737.2 GWh |
#55 | Gavins Point | Crofton, NE | 715.3 GWh |
#56 | Sidney A Murray Jr Hydroelectric | Vidalia, LA | 707.5 GWh |
#57 | Fort Peck | Fort Peck, MT | 701.2 GWh |
#58 | Gorge | Rockport, WA | 678.1 GWh |
#59 | Fort Loudoun | Lenoir City, TN | 676.5 GWh |
#60 | Chickamauga | Chattanooga, TN | 657.3 GWh |
#61 | Hungry Horse | Columbia Falls, MT | 650.2 GWh |
#63 | Folsom | Folsom, CA | 626.4 GWh |
#64 | Poe | Storrie, CA | 589.5 GWh |
#65 | Swift 1 | Cougar, WA | 567.6 GWh |
#66 | Palisades Dam | Palisades, ID | 564.6 GWh |
#67 | Rock Creek | Storrie, CA | 559.2 GWh |
#68 | Diablo | Rockport, WA | 548.9 GWh |
#69 | Mayfield | Silver Creek, WA | 545.0 GWh |
#70 | Haas | Balch Camp, CA | 541.0 GWh |
#71 | Meldahl Hydroelectric Project | Foster, KY | 539.3 GWh |
#72 | Big Creek 2A | Auberry, CA | 536.5 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding J Strom Thurmond.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Apalachicola | Hephzibah, GA | 5.1 GWh | 23.7 mi |
Augusta Solar | Greenwood, SC | 4.1 GWh | 32.3 mi |
Briarwood | Greenwood, SC | 3.9 GWh | 29.8 mi |
Bulldog Solar LLC | Warrenton, GA | 159.0 GWh | 34.2 mi |
Columbia Bryson | Grovetown, GA | 2.8 GWh | 15.9 mi |
Columbia Substation | Appling, GA | 3.9 GWh | 8.7 mi |
Fort Gordon Solar Facility | Fort Gordon, GA | 55.0 GWh | 19.2 mi |
Gold Mine | Bradley, SC | 3.1 GWh | 28.5 mi |
Graniteville Enterprise Division | Augusta, GA | 254.0 MWh | 17.6 mi |
Graphic Packaging International Augusta Mill | Augusta, GA | 382.7 GWh | 26.9 mi |
Hobnail Solar | Hephzibah, GA | 130.6 GWh | 27.5 mi |
Richard B Russell | Elberton, GA | 318.4 GWh | 34.1 mi |
Richmond County GA S2 LLC | Hephzibah, GA | 5.5 GWh | 24.5 mi |
Richmond Hayes Solar | Augusta, GA | 2.5 GWh | 22.8 mi |
Saluda Solar II | Saluda, SC | 6.3 GWh | 35.7 mi |
Saluda Solar, LLC | Saluda, SC | 12.1 GWh | 31.9 mi |
Shaw Creek Solar, LLC | Aiken, SC | 167.1 GWh | 25.4 mi |
Sibley Mill | Augusta, GA | 8.4 GWh | 16.7 mi |
Stevens Creek | Martinez, GA | 78.9 GWh | 10.7 mi |
Urquhart | Beech Island, SC | 1.4 TWh | 22.6 mi |