J S Eastwood
Hwy 168 Sierra National Forest, Shaver Lake, CA 93664Plant Summary Information
J S Eastwood is ranked #137 out of 221 hydroelectric power plants in California in terms of total annual net electricity generation.
J S Eastwood is comprised of 1 generator and generated -5.0 GWh during the 3-month period between September 2024 to December 2024.
Plant Name | J S Eastwood |
---|---|
Utility Name | Southern California Edison Co |
Location | Fresno County, CA |
Initial Operation Date | December 1987 |
Last Update | Dec 2024 |
Annual Generation | 17.0 GWh |
Annual Consumption | 0 MMBtu |
Ranked #5,311 out of 11,949 Power Plants Nationwide | |
Ranked #804 out of 1,370 Water Power Plants Nationwide | |
Ranked #739 out of 1,577 California Power Plants | |
Ranked #137 out of 221 California Water Power Plants | |
Fuel Types | Water |
Map of J S Eastwood
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for J S Eastwood.
Monthly Net Generation for J S Eastwood
J S Eastwood Details
Summary Information | |
---|---|
Plant Name | J S Eastwood (104) |
Plant Address | Hwy 168 Sierra National Forest, Shaver Lake, CA 93664 |
Utility | Southern California Edison Co (17609) |
Latitude, Longitude | 37.14793, -119.2567 |
Generation Dates on File | Jan 2001 to Dec 2024 |
Initial Operation Date | December 1987 |
Annual Generation | 17.0 GWh |
Fuel Types | Water |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Regulated |
NERC Region | WECC |
Balancing Authority | California Independent System Operator (CISO) |
NAICS Code | Utilities (22) |
Sector | Electric Utility (1) |
Water Source | San Joaquin River |
Ash Impoundment | |
Transmission / Distribution Owner | Southern California Edison Co (17609) CA |
Grid Voltage | 220.00 kV |
Energy Storage | Yes |
Generator 1 Details OA December 1987
Technology | Hydroelectric Pumped Storage |
---|---|
Prime Mover | Pumped Storage |
Ownership | Single Owner |
Nameplate Capacity | 199.8 MW |
Nameplate Power Factor | 0.9 |
Summer Capacity | 199.8 MW |
Winter Capacity | 199.8 MW |
Uprate/Derate Completed | No |
---|---|
Status | OA |
First Operation Date | December 1987 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Water |
Time From Cold Shutdown To Full Load | 10M |
J S Eastwood Plant Owners
Owner Name | Address | Ownership | |
---|---|---|---|
We couldn't locate any owners for this plant |
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Water.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#794 | San Fernando | Sylmar, CA | 17.8 GWh |
#795 | Murphys | Murphys, CA | 17.8 GWh |
#796 | Gardners Falls | Buckland, MA | 17.7 GWh |
#797 | Redbridge | Wilbraham, MA | 17.7 GWh |
#798 | Townsend Hydro | New Brighton, PA | 17.6 GWh |
#799 | Box Canyon Dam | Mount Shasta, CA | 17.3 GWh |
#800 | Benton Falls Associates | Benton, ME | 17.3 GWh |
#801 | Newcastle | Auburn, CA | 17.3 GWh |
#802 | New Lahontan | Fallon, NV | 17.2 GWh |
#803 | Penacook Upper Falls Hydro | Penacook, NH | 17.1 GWh |
#805 | Burton Dam | Clayton, GA | 17.0 GWh |
#806 | Russell D Smith | Othello, WA | 17.0 GWh |
#807 | Black River Hydro Associates | Port Layden, NY | 16.9 GWh |
#808 | Tuxedo | Flat Rock, NC | 16.8 GWh |
#809 | Towaoc | Cortez, CO | 16.8 GWh |
#810 | Etiwanda | Rancho Cucamonga, CA | 16.7 GWh |
#811 | Loud | Oscoda, MI | 16.7 GWh |
#812 | Effley | Croghan, NY | 16.6 GWh |
#813 | Hancock Creek Hydroelectric Project | Snoqualmie, WA | 16.6 GWh |
#814 | South Canal Hydro-1 | Montrose, CO | 16.6 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding J S Eastwood.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
A G Wishon | North Fork, CA | 16.1 GWh | 13.7 mi |
Balch 1 | Balch Camp, CA | 184.4 GWh | 18.9 mi |
Balch 2 | Balch Camp, CA | 489.7 GWh | 19 mi |
Big Creek 1 | Big Creek, CA | 393.8 GWh | 4 mi |
Big Creek 2 | Auberry, CA | 296.2 GWh | 4.5 mi |
Big Creek 2A | Auberry, CA | 413.8 GWh | 4.5 mi |
Big Creek 3 | Auberry, CA | 630.3 GWh | 7.2 mi |
Big Creek 4 | North Fork, CA | 384.1 GWh | 12.9 mi |
Big Creek 8 | Auberry, CA | 152.9 GWh | 5.8 mi |
Clovis North High School | Fresno, CA | 1.4 GWh | 31.9 mi |
Friant Hydro Facility | Friant, CA | 106.2 GWh | 26.7 mi |
Haas | Balch Camp, CA | 459.5 GWh | 20.1 mi |
Kerckhoff 2 | Auberry, CA | 403.8 GWh | 17.4 mi |
Kings River PH | Balch Camp, CA | 206.7 GWh | 18.7 mi |
Kings River Syphon | Sanger, CA | 1.3 GWh | 28.4 mi |
Mammoth Pool | North Fork, CA | 413.6 GWh | 6.7 mi |
Pine Flat | Piedra, CA | 485.0 GWh | 22.1 mi |
Portal | Lakeshore, CA | 21.2 GWh | 9.3 mi |
San Joaquin 2 | North Fork, CA | 1.5 GWh | 13.8 mi |
SCCCD - Clovis Community College | Fresno, CA | 2.0 GWh | 31.9 mi |