J D Kennedy
4215 Talleyrand Ave., Jacksonville, FL 32206Plant Summary Information
J D Kennedy is ranked #51 out of 85 natural gas power plants in Florida in terms of total annual net electricity generation.
J D Kennedy is comprised of 2 generators and generated 26.7 GWh during the 3-month period between September 2023 to December 2023.
Plant Name | J D Kennedy |
---|---|
Utility Name | JEA |
Location | Duval County, FL |
Initial Operation Date | June 2000 |
Last Update | Dec 2023 |
Annual Generation | 183.3 GWh |
Annual Consumption | 2.2 M MMBtu |
Ranked #2,422 out of 11,852 Power Plants Nationwide | |
Ranked #770 out of 2,254 Natural Gas Power Plants Nationwide | |
Ranked #68 out of 279 Florida Power Plants | |
Ranked #51 out of 85 Florida Natural Gas Power Plants | |
Fuel Types | Natural Gas : 99.6% |
Map of J D Kennedy
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for J D Kennedy.
Monthly Net Generation for J D Kennedy
J D Kennedy Details
Summary Information | |
---|---|
Plant Name | J D Kennedy (666) |
Plant Address | 4215 Talleyrand Ave., Jacksonville, FL 32206 |
Utility | JEA (9617) |
Latitude, Longitude | 30.36482, -81.62597 |
Generation Dates on File | Jan 2001 to Dec 2023 |
Initial Operation Date | June 2000 |
Annual Generation | 183.3 GWh |
Fuel Types | Natural Gas : 99.6% |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Regulated |
NERC Region | SERC |
Balancing Authority | JEA (JEA) |
NAICS Code | Utilities (22) |
Sector | Electric Utility (1) |
Water Source | |
Ash Impoundment | |
Transmission / Distribution Owner | JEA (9617) FL |
Grid Voltage | 69.00 kV / 138.00 kV / 26.00 kV |
Energy Storage | No |
Natural Gas Information | |
Local Distribution Company (LDC) | PEOPLES GAS SYS |
Natural Gas Storage | No |
Generator GT37 Details Operating June 2000
Technology | Natural Gas Fired Combustion Turbine |
---|---|
Prime Mover | Combustion Turbine |
Ownership | Single Owner |
RTO ISO LMP Node Designation | FRCC |
RTO ISO Location Designation For Reporting Wholesale Sales Data | FRCC |
Nameplate Capacity | 185 MW |
Nameplate Power Factor | 0.9 |
Summer Capacity | 178.6 MW |
Winter Capacity | 191.2 MW |
Minimum Load | 65 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | June 2000 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Natural Gas / Distillate Fuel Oil |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 1H |
Multiple Fuels | Yes |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | Yes |
Multifuel Details | |
Switch When Operating | Yes |
---|---|
Net Summer Capacity With Natural Gas | 150 MW |
Net Winter Capacity With Natural Gas | 185.9 MW |
Net Summer Capacity With Oil | 178.6 MW |
Net Winter Capacity With Oil | 191.2 MW |
Time To Switch From Gas To Oil | 72H |
Time To Switch From Oil To Gas | 1H |
Factors That Limit Switching | Yes |
Air Permit Limits | Yes |
Generator GT38 Details Operating June 2009
Technology | Natural Gas Fired Combustion Turbine |
---|---|
Prime Mover | Combustion Turbine |
Ownership | Single Owner |
RTO ISO LMP Node Designation | FRCC |
RTO ISO Location Designation For Reporting Wholesale Sales Data | FRCC |
Nameplate Capacity | 185 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 178.6 MW |
Winter Capacity | 191.2 MW |
Minimum Load | 65 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | June 2009 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Natural Gas / Distillate Fuel Oil |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 1H |
Multiple Fuels | Yes |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | Yes |
Multifuel Details | |
Switch When Operating | Yes |
---|---|
Net Summer Capacity With Natural Gas | 150 MW |
Net Winter Capacity With Natural Gas | 185.9 MW |
Net Summer Capacity With Oil | 178.6 MW |
Net Winter Capacity With Oil | 191.2 MW |
Time To Switch From Gas To Oil | 72H |
Time To Switch From Oil To Gas | 1H |
Factors That Limit Switching | Yes |
Air Permit Limits | Yes |
J D Kennedy Plant Owners
Owner Name | Address | Generator | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Natural Gas.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#760 | Arsenal Hill | Shreveport, LA | 188.6 GWh |
#761 | Almond Power Plant | Modesto, CA | 188.4 GWh |
#762 | Tropicana Products Bradent | Bradenton, FL | 188.1 GWh |
#763 | Dansby | Bryan, TX | 187.7 GWh |
#764 | Perryman | Harford County, MD | 196.0 GWh |
#765 | Spring Creek Energy Center | Edmond, OK | 184.6 GWh |
#766 | Klamath Expansion Project | Klamath Falls, OR | 184.3 GWh |
#767 | Robert P Mone Plant | Convoy, OH | 185.0 GWh |
#768 | John Twitty Energy Center | Springfield, MO | 2.1 TWh |
#769 | LEPA Unit No. 1 | Morgan City, LA | 183.2 GWh |
#771 | Tesoro SLC Cogeneration Plant | Salt Lake City, UT | 184.2 GWh |
#772 | Ada Cogeneration LP | Ada, MI | 181.1 GWh |
#773 | Harry D Mattison Gas Plant | Tontitown, AR | 180.5 GWh |
#774 | Red Lion Energy Center | New Castle, DE | 180.3 GWh |
#775 | Clinch River | Cleveland, VA | 179.9 GWh |
#776 | Brunswick Cellulose | Brunswick, GA | 383.9 GWh |
#777 | E W Brown | Harrodsburg, KY | 1.4 TWh |
#778 | Saguaro | Red Rock, AZ | 175.6 GWh |
#779 | Univ Minnesota CHP Plant | Minneapolis, MN | 173.9 GWh |
#780 | Lake Catherine | Jones Mill, AR | 173.5 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding J D Kennedy.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
AEP Jacksonville Solar Project | Duval, FL | 13.9 GWh | 11.6 mi |
Anheuser-Busch Jacksonville | Jacksonville, FL | 69.5 GWh | 4.9 mi |
Baptist Medical Center | Jacksonville, FL | 19.9 GWh | 4.1 mi |
Brandy Branch | Baldwin, FL | 5.1 TWh | 19.4 mi |
Eight Flags Energy | Fernandina Beach, FL | 172.3 GWh | 22.4 mi |
Fernandina Beach Mill | Fernandina Beach, FL | 560.2 GWh | 24.1 mi |
Fernandina Plant | Fernandina Beach, FL | 192.3 GWh | 22.4 mi |
Greenland Energy Center | Jacksonville, FL | 550.6 GWh | 15.6 mi |
Hecate Energy Blair Road LLC | Jacksonville, FL | 6.4 GWh | 13.5 mi |
IKEA Jacksonville Rooftop PV System | Jacksonville, FL | 2.2 GWh | 11.6 mi |
Imeson Solar | Jscksonville, FL | 10.8 GWh | 8.3 mi |
Jacksonville Solar | Jacksonville, FL | 15.1 GWh | 19.9 mi |
Jax LNG | Jacksonville, FL | 30.5 GWh | 4.6 mi |
Nassau Solar Center | Callahan, FL | 131.2 GWh | 18.1 mi |
Naval Submarine Base Kings Bay | Kings Bay, GA | 668.0 MWh | 30 mi |
Northside Generating Station | Jacksonville, FL | 3.0 TWh | 5.7 mi |
Old Plank Road Solar Farm, LLC | Jacksonville, FL | 5.7 GWh | 16 mi |
Seminole Mill | Jacksonville, FL | 128.9 GWh | 4 mi |
Starratt Solar | Jacksonville, FL | 8.8 GWh | 9.1 mi |
Trail Ridge Landfill Gas Recovery | Baldwin, FL | 25.2 GWh | 26.5 mi |