Ivester Wind Farm
15087 205th St, Wellsburg, IA 50680Plant Summary Information
Ivester Wind Farm is ranked #50 out of 124 wind farms in Iowa in terms of total annual net electricity generation.
Ivester Wind Farm generated 95.7 GWh during the 3-month period between November 2024 to February 2025.
Plant Name | Ivester Wind Farm |
---|---|
Utility Name | MidAmerican Energy Co |
Location | Grundy County, IA |
Initial Operation Date | December 2018 |
Last Update | Feb 2025 |
Annual Generation | 350.5 GWh |
Annual Consumption | 1.3 M MMBtu |
Ranked #1,689 out of 11,993 Power Plants Nationwide | |
Ranked #504 out of 1,361 Wind Power Plants Nationwide | |
Ranked #63 out of 275 Iowa Power Plants | |
Ranked #50 out of 124 Iowa Wind Power Plants | |
Fuel Types | Wind |
Map of Ivester Wind Farm
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Ivester Wind Farm.
Monthly Net Generation for Ivester Wind Farm
Ivester Wind Farm Details
Summary Information | |
---|---|
Plant Name | Ivester Wind Farm (61911) |
Plant Address | 15087 205th St, Wellsburg, IA 50680 |
Utility | MidAmerican Energy Co (12341) |
Latitude, Longitude | 42.33327, -92.94644 |
Generation Dates on File | Dec 2018 to Feb 2025 |
Initial Operation Date | December 2018 |
Annual Generation | 350.5 GWh |
Fuel Types | Wind |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Regulated |
NERC Region | MRO |
Balancing Authority | Midcontinent Independent Transmission System Operator, Inc.. (MISO) |
NAICS Code | Utilities (22) |
Sector | Electric Utility (1) |
Water Source | |
Ash Impoundment | |
Transmission / Distribution Owner | ITC Midwest LLC (56161) |
Grid Voltage | 161.00 kV |
Energy Storage | No |
Generator WT1 Details Operating December 2018
Technology | Onshore Wind Turbine |
---|---|
Prime Mover | Wind Turbine, Onshore |
Ownership | Single Owner |
Nameplate Capacity | 90.8 MW |
Summer Capacity | 90 MW |
Winter Capacity | 90 MW |
Minimum Load | 0.1 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | December 2018 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Wind |
Carbon Capture Technology | No |
Turbines/Hydrokinetic Buoys | 35 |
Multiple Fuels | No |
Turbine Details | |
Number Of Turbines | 35 |
---|---|
Predominant Turbine Manufacturer | Siemens |
Predominant Turbine Model Number | SWT-2.625-120 |
Design Wind Speed | 16.8 MPH |
Wind Quality Class | 3 - Low Wind |
Turbine Hub Height Feet | 262.4 |
Ivester Wind Farm Plant Owners
Owner Name | Address | Ownership | |
---|---|---|---|
We couldn't locate any owners for this plant |
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Wind.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#494 | Tatanka Wind Power LLC | Ashley, ND | 359.0 GWh |
#495 | Trimont Area Wind Farm | Trimont, MN | 356.4 GWh |
#496 | Arbuckle Mountain Wind Farm LLC | Davis, OK | 354.6 GWh |
#497 | Seiling Wind II | Seiling, OK | 353.5 GWh |
#498 | Oakfield Wind Project | City of Oakfield, ME | 352.4 GWh |
#499 | Hackberry Wind Farm | Albany, TX | 352.4 GWh |
#500 | Reloj del Sol Wind Farm | San Ygnacio, TX | 351.9 GWh |
#501 | Morning Light Wind Farm | Adair, IA | 351.7 GWh |
#502 | Shady Oaks Wind 2 | Compton, IL | 351.7 GWh |
#503 | Pine River Wind Park | Shepherd, MI | 350.7 GWh |
#505 | High Lonesome Mesa LLC | Willard, NM | 350.1 GWh |
#506 | Blue Sky Green Field Wind Project | Fond du Lac, WI | 349.8 GWh |
#507 | Sac County Wind, LLC | Sac City, IA | 349.8 GWh |
#508 | Barton Windpower LLC | Kensett, IA | 349.7 GWh |
#509 | Buckthorn Wind | Mingus, TX | 346.9 GWh |
#510 | Spinning Spur Wind LLC | Vegas, TX | 346.5 GWh |
#511 | Cameron Wind 1 LLC | Rio Hondo, TX | 346.0 GWh |
#512 | Roscoe Wind Farm LLC | Roscoe, TX | 345.9 GWh |
#513 | Turkey Track Wind Energy LLC | Blackwell, TX | 345.7 GWh |
#514 | Majestic 1 Wind Farm | Panhandle, TX | 345.1 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Ivester Wind Farm.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Alliant SBD 9107 JBS USA | Marshalltown, IA | 35.3 MWh | 19.3 mi |
Cedar Falls Solar Farm | Cedar Falls, IA | 2.3 GWh | 26.9 mi |
Dike City Power Plant | Dike, IA | 60.0 MWh | 18.6 mi |
Electrifarm | Waterloo, IA | 11.6 GWh | 27.8 mi |
FPL Energy Story Wind LLC | Zearing, IA | 589.3 GWh | 23 mi |
Franklin County Solar | Hampton, IA | 13.6 GWh | 29.9 mi |
Franklin County Wind Farm | Iowa Falls, IA | 236.2 GWh | 27.4 mi |
Garden Wind LLC | Zearing, IA | 360.3 GWh | 23.1 mi |
Grundy Center City Light Plant | Grundy Center, IA | 388.1 MWh | 9.1 mi |
Leonardo Wind 1 LLC | Alden, IA | 11.2 GWh | 24.3 mi |
Marshalltown | Marshalltown, IA | 122.1 GWh | 20.2 mi |
Marshalltown Generating Station | Marshalltown, IA | 3.4 TWh | 20.4 mi |
State Center | State Center, IA | 53.0 MWh | 24.5 mi |
Streeter Station | Cedar Falls, IA | 7.5 GWh | 29.1 mi |
Traer Main | Traer, IA | 7.0 MWh | 26.5 mi |
Traer Wind Project | Traer, IA | 5.8 GWh | 28.4 mi |
University of Northern Iowa | Cedar Falls, IA | 21.7 GWh | 27.8 mi |
Vienna Wind Farm | Marshalltown, IA | 403.3 GWh | 14.8 mi |
Wellsburg Wind Project | Wellsburg, IA | 441.8 GWh | 4.1 mi |
Whispering Willow Wind Farm - East | Iowa Falls, IA | 459.4 GWh | 24.4 mi |