Ivanpah 2
100302 Yates Well Road, Nipton, CA 92364Plant Summary Information
Ivanpah 2 is ranked #69 out of 799 solar farms in California in terms of total annual net electricity generation.
Ivanpah 2 generated 78.2 GWh during the 3-month period between June 2024 to September 2024.
Plant Name | Ivanpah 2 |
---|---|
Utility Name | NRG Energy Services |
Location | San Bernardino County, CA |
Initial Operation Date | December 2013 |
Last Update | Sep 2024 |
Annual Generation | 270.0 GWh |
Annual Consumption | 3.4 M MMBtu |
Ranked #1,961 out of 11,852 Power Plants Nationwide | |
Ranked #204 out of 5,655 Solar Power Plants Nationwide | |
Ranked #196 out of 1,570 California Power Plants | |
Ranked #69 out of 799 California Solar Power Plants | |
Fuel Types | Solar : 96.2% Natural Gas : 3.8% |
Map of Ivanpah 2
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Ivanpah 2.
Monthly Net Generation for Ivanpah 2
Ivanpah 2 Details
Summary Information | |
---|---|
Plant Name | Ivanpah 2 (57073) |
Plant Address | 100302 Yates Well Road, Nipton, CA 92364 |
Utility | NRG Energy Services (57499) |
Latitude, Longitude | 35.55611, -115.46861 |
Generation Dates on File | Jan 2014 to Sep 2024 |
Initial Operation Date | December 2013 |
Annual Generation | 270.0 GWh |
Fuel Types | Solar : 96.2% Natural Gas : 3.8% |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | WECC |
Balancing Authority | California Independent System Operator (CISO) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | Wells |
Ash Impoundment | No |
Transmission / Distribution Owner | Southern California Edison Co (17609) CA |
Grid Voltage | 115.00 kV |
Energy Storage | No |
Natural Gas Information | |
Pipeline Name | KERN RIVER GAS TRANSMISSION CO |
Natural Gas Storage | No |
Liquefied Natural Gas Storage | No |
Generator ST1 Details Operating December 2013
Technology | Solar Thermal without Energy Storage |
---|---|
Prime Mover | Steam Turbine |
Ownership | Wholly Owned by Other Entity |
Nameplate Capacity | 133.4 MW |
Nameplate Power Factor | 0.9 |
Summer Capacity | 133.4 MW |
Winter Capacity | 133.4 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | December 2013 |
Combined Heat & Power | No |
---|---|
Sector Name | IPP Non-CHP (2) |
Energy Source | Solar / Natural Gas |
Startup Source | Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 12H |
Multiple Fuels | Yes |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Solar Details | |
Lenses Mirrors | Yes |
---|---|
Dual Axis Tracking | Yes |
Power Tower | Yes |
Ivanpah 2 Plant Owners
Owner Name | Address | Ownership |
---|---|---|
Solar Partners I LLC | 1999 Harrsion StSte 2150, Oakland, CA 94612 | 100.00% |
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#194 | West Line Solar, LLC | City of Eloy, AZ | 268.1 GWh |
#195 | Rancho Seco Solar II, LLC | Twin Cities, CA | 266.9 GWh |
#196 | San Pablo Raceway | Lancaster, CA | 264.8 GWh |
#197 | Bluebell Solar II | Sterling, TX | 264.1 GWh |
#198 | Dougherty County Solar, LLC | Albany, GA | 263.8 GWh |
#199 | Catalina Solar LLC | Rosamond, CA | 262.7 GWh |
#200 | Jackpot Solar, LLC | Twin Falls, ID | 262.1 GWh |
#201 | Sunshine Valley Solar | Armagosa, NV | 260.9 GWh |
#202 | Saint Solar | Coolidge, AZ | 260.6 GWh |
#203 | Hecate Energy Highland LLC | Buford, OH | 260.6 GWh |
#205 | Rabbitbrush Solar, LLC | Rosamond, CA | 256.9 GWh |
#206 | Central Line Solar, LLC | Coolidge, AZ | 259.4 GWh |
#207 | Bellflower Solar 1 | Lewisville, IN | 259.2 GWh |
#208 | Milford Solar 1 | Milford, UT | 257.2 GWh |
#209 | Fish Springs | Reno, NV | 253.6 GWh |
#210 | East Pecos Solar | McCamey, TX | 253.8 GWh |
#211 | Nebula Solar | La Feria, TX | 253.2 GWh |
#212 | Corazon Energy LLC | Rachito Las Lomas, TX | 252.8 GWh |
#213 | OCI Alamo 7 LLC | Haskell, TX | 250.2 GWh |
#214 | Comanche Solar | Pueblo, CO | 249.6 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Ivanpah 2.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Boulder Solar II, LLC | Boulder City, NV | 125.2 GWh | 35.8 mi |
Boulder Solar Power, LLC | Boulder City, NV | 271.6 GWh | 31.5 mi |
CM10 | Boulder City, NV | 19.2 GWh | 31.1 mi |
CM48 | Boulder City, NV | 93.3 GWh | 30.9 mi |
Copper Mountain Solar 2 | Boulder City, NV | 348.7 GWh | 32.5 mi |
Copper Mountain Solar 4, LLC | Boulder City, NV | 214.2 GWh | 31.8 mi |
Copper Mountain Solar 5, LLC | Boulder City, NV | 691.5 GWh | 31.7 mi |
Desert Star Energy Center | Boulder City, NV | 1.2 TWh | 31.1 mi |
Goodsprings Waste Heat Recovery | Jean, NV | 22.0 GWh | 17.8 mi |
Higgins Generating Station | Primm, NV | 2.4 TWh | 7.5 mi |
IGS LAS1 | Henderson, NV | 1.0 GWh | 33.7 mi |
Ivanpah 1 | Nipton, CA | 236.1 GWh | 1.8 mi |
Ivanpah 3 | Nipton, CA | 278.0 GWh | 1.9 mi |
Nevada Solar One | Boulder City, NV | 94.3 GWh | 32.1 mi |
Searchlight Solar | Searchlight, NV | 42.6 GWh | 30.4 mi |
Silver State Solar Power North | Primm, NV | 113.3 GWh | 17.7 mi |
Silver State Solar Power South | Primm Valley, NV | 650.9 GWh | 9.8 mi |
Stateline Solar | Nipton, CA | 618.5 GWh | 4.9 mi |
Techren Solar I LLC | Boulder, NV | 200.5 GWh | 34.4 mi |
Techren Solar III LLC | Boulder, NV | 60.5 GWh | 34.3 mi |