Iron Star Wind Project
11290 Saddle Road, Dodge City, KS 67801Plant Summary Information
Iron Star Wind Project is ranked #26 out of 1,345 wind farms nationwide in terms of total annual net electricity generation.
Iron Star Wind Project generated 307.2 GWh during the 3-month period between July 2024 to October 2024.
Plant Name | Iron Star Wind Project |
---|---|
Utility Name | Engie North America |
Location | Ford County, KS |
Initial Operation Date | December 2021 |
Last Update | Oct 2024 |
Annual Generation | 1.2 TWh |
Annual Consumption | 4.6 M MMBtu |
Ranked #645 out of 11,866 Power Plants Nationwide | |
Ranked #26 out of 1,345 Wind Power Plants Nationwide | |
Ranked #8 out of 152 Kansas Power Plants | |
Ranked #3 out of 49 Kansas Wind Power Plants | |
Fuel Types | Wind |
Map of Iron Star Wind Project
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Iron Star Wind Project.
Monthly Net Generation for Iron Star Wind Project
Iron Star Wind Project Details
Summary Information | |
---|---|
Plant Name | Iron Star Wind Project (64003) |
Plant Address | 11290 Saddle Road, Dodge City, KS 67801 |
Utility | Engie North America (56201) |
Latitude, Longitude | 37.64875, -99.98094 |
Generation Dates on File | Dec 2021 to Oct 2024 |
Initial Operation Date | December 2021 |
Annual Generation | 1.2 TWh |
Fuel Types | Wind |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | MRO |
Balancing Authority | Southwest Power Pool (SWPP) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | |
Ash Impoundment | |
Transmission / Distribution Owner | ITC Great Plains, LLC (56526) |
Grid Voltage | 345.00 kV |
Energy Storage | No |
Generator WTG1 Details Operating December 2021
Technology | Onshore Wind Turbine |
---|---|
Prime Mover | Wind Turbine, Onshore |
Ownership | Single Owner |
Nameplate Capacity | 297.6 MW |
Nameplate Power Factor | 0.95 |
Summer Capacity | 297.6 MW |
Winter Capacity | 297.6 MW |
Minimum Load | 4 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | December 2021 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Wind |
Turbines/Hydrokinetic Buoys | 62 |
Turbine Details | |
Number Of Turbines | 62 |
---|---|
Predominant Turbine Manufacturer | Nordex |
Predominant Turbine Model Number | N149/4.0-4.5 |
Design Wind Speed | 21.5 MPH |
Wind Quality Class | 2 - Medium Wind |
Turbine Hub Height Feet | 351 |
Iron Star Wind Project Plant Owners
Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Wind.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#16 | Palo Alto Wind Farm | Emmetsburg, IA | 1.5 TWh |
#17 | Fowler Ridge Wind Farm LLC | Fowler, IN | 1.4 TWh |
#18 | Beaver Creek Wind | Ogden, IA | 1.4 TWh |
#19 | TB Flats | Medicine Bow, WY | 1.4 TWh |
#20 | Maverick Creek Wind | Eden, TX | 1.4 TWh |
#21 | North English | Montezuma, IA | 1.3 TWh |
#22 | Grande Prairie Wind Farm | O'Neill, NE | 1.3 TWh |
#23 | Lacy Creek Wind Energy Center | Sterling City, TX | 1.3 TWh |
#24 | Neosho Ridge Wind Energy Center | Galesburg, KS | 1.3 TWh |
#25 | Clearwater Wind I | Miles City, MT | 1.3 TWh |
#27 | Inertia Wind Project | Haskell, TX | 1.2 TWh |
#28 | Jordan Creek Wind Farm, LLC | Judyville, IN | 1.2 TWh |
#29 | Santa Rita Wind Energy | Big Lake, TX | 1.2 TWh |
#30 | Thunderhead Wind Energy LLC | Boone, NE | 1.2 TWh |
#31 | High Lonesome Wind Power, LLC Hybrid | Rankin, TX | 1.2 TWh |
#32 | Red Cloud Wind LLC | Corona, NM | 1.2 TWh |
#33 | Mesquite Star | Roscoe, TX | 1.2 TWh |
#34 | Stephens Ranch Wind Energy LLC | O'Donnell, TX | 1.2 TWh |
#35 | Foard City Wind | Crowell, TX | 1.2 TWh |
#36 | Ranchero Wind Farm LLC | Iraan, TX | 1.2 TWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Iron Star Wind Project.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Ashland | Ashland, KS | 27.0 MWh | 33.6 mi |
Bloom Wind | Minneola, KS | 669.0 GWh | 11.6 mi |
Bonanza BioEnergy LLC | Garden City, KS | 5.8 GWh | 51.4 mi |
Cimarron Bend III | Minneola, KS | 543.2 GWh | 19.2 mi |
Cimarron Bend Wind Project I, LLC | Minneola, KS | 852.5 GWh | 20.3 mi |
Cimarron Bend Wind Project II, LLC | Minneola, KS | 825.2 GWh | 20.3 mi |
Cimarron Wind Energy LLC | Cimmaron, KS | 463.7 GWh | 22.6 mi |
Cimarron Windpower II | Cimarron, KS | 475.5 GWh | 27.6 mi |
Ensign Wind LLC | Montezuma, KS | 483.0 GWh | 16.5 mi |
Fort Dodge | Dodge City, KS | 104.8 GWh | 6.1 mi |
Gray County Wind Energy | Montezuma, KS | 304.3 GWh | 21.9 mi |
Greensburg | Greensburg, KS | 13.0 GWh | 35.5 mi |
Ironwood Wind | Spearville, KS | 514.3 GWh | 16.2 mi |
Jameson Energy Center | Garden City, KS | 1.1 GWh | 51 mi |
Jetmore | Jetmore, KS | 61.0 MWh | 30.2 mi |
Meade | Meade, KS | 105.0 MWh | 31.7 mi |
Shooting Star | Mullinville, KS | 192.4 GWh | 30.6 mi |
Spearville | Ford, KS | 208.9 GWh | 19.4 mi |
Spearville 3 LLC | Spearville, KS | 198.2 GWh | 16 mi |
Western Plains Wind Farm | Spearville, KS | 1.1 TWh | 21.8 mi |