Intermountain Power Project
850 Brush Wellman Rd., Delta, UT 84624Plant Summary Information
Intermountain Power Project is ranked #23 out of 129 coal plants nationwide in terms of total annual net electricity generation.
Intermountain Power Project is comprised of 2 generators and generated 2.0 TWh during the 3-month period between June 2024 to September 2024.
Plant Name | Intermountain Power Project |
---|---|
Utility Name | Los Angeles Department of Water & Power |
Location | Millard County, UT |
Initial Operation Date | June 1986 |
Last Update | Sep 2024 |
Annual Generation | 4.4 TWh |
Annual Consumption | 50.8 M MMBtu |
Ranked #248 out of 11,852 Power Plants Nationwide | |
Ranked #23 out of 129 Bituminous Coal Power Plants Nationwide | |
Ranked #2 out of 121 Utah Power Plants | |
Ranked #1 out of 4 Utah Bituminous Coal Power Plants | |
Fuel Types | Bituminous Coal : 84.6% Subbituminous Coal : 15.1% |
Map of Intermountain Power Project
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Intermountain Power Project.
Monthly Net Generation for Intermountain Power Project
Intermountain Power Project Details
Summary Information | |
---|---|
Plant Name | Intermountain Power Project (6481) |
Plant Address | 850 Brush Wellman Rd., Delta, UT 84624 |
Utility | Los Angeles Department of Water & Power (11208) |
Latitude, Longitude | 39.50973, -112.58018 |
Generation Dates on File | Jan 2001 to Sep 2024 |
Initial Operation Date | June 1986 |
Annual Generation | 4.4 TWh |
Fuel Types | Bituminous Coal : 84.6% Subbituminous Coal : 15.1% |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Regulated |
NERC Region | WECC |
Balancing Authority | Los Angeles Department of Water and Power (LDWP) |
NAICS Code | Utilities (22) |
Sector | Electric Utility (1) |
Water Source | DMAD Reservoir |
Ash Impoundment | Yes Lined Operating |
Transmission / Distribution Owner | Intermountain Power Agency (40576) |
Grid Voltage | 500.00 kV / 345.00 kV |
Energy Storage | No |
Generator 1 Details Operating June 1986
Technology | Conventional Steam Coal |
---|---|
Prime Mover | Steam Turbine |
Ownership | Wholly Owned by Other Entity |
Nameplate Capacity | 820 MW |
Nameplate Power Factor | 0.9 |
Summer Capacity | 900 MW |
Winter Capacity | 900 MW |
Minimum Load | 270 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | June 1986 |
Planned Retirement | July 2025 |
Combined Heat & Power | No |
---|---|
Sector Name | Electric Utility (1) |
Energy Source | Bituminous Coal / Subbituminous Coal |
Startup Source | Distillate Fuel Oil |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | OVER |
Pulverized Coal Technology | Yes |
Subcritical Technology | Yes |
Multiple Fuels | Yes |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator 2 Details Operating May 1987
Technology | Conventional Steam Coal |
---|---|
Prime Mover | Steam Turbine |
Ownership | Wholly Owned by Other Entity |
Nameplate Capacity | 820 MW |
Nameplate Power Factor | 0.9 |
Summer Capacity | 900 MW |
Winter Capacity | 900 MW |
Minimum Load | 270 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | May 1987 |
Planned Retirement | July 2025 |
Combined Heat & Power | No |
---|---|
Sector Name | Electric Utility (1) |
Energy Source | Bituminous Coal / Subbituminous Coal |
Startup Source | Distillate Fuel Oil |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | OVER |
Pulverized Coal Technology | Yes |
Subcritical Technology | Yes |
Multiple Fuels | Yes |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Intermountain Power Project Plant Owners
Owner Name | Address | Generator | Ownership |
---|---|---|---|
Intermountain Power Agency | P O Box 51111Room 1263, Los Angeles, CA 90051 | Generator 1 | 100.00% |
Intermountain Power Agency | P O Box 51111Room 1263, Los Angeles, CA 90051 | Generator 2 | 100.00% |
Intermountain Power Agency | P O Box 51111Room 1263, Los Angeles, CA 90051 | Generator 3 | 100.00% |
Intermountain Power Agency | P O Box 51111Room 1263, Los Angeles, CA 90051 | Generator 4 | 100.00% |
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Bituminous Coal.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#13 | Trimble County | Bedford, KY | 8.9 TWh |
#14 | Roxboro | Semora, NC | 5.9 TWh |
#15 | Mountaineer | New Haven, WV | 5.6 TWh |
#16 | Miami Fort | North Bend, OH | 5.1 TWh |
#17 | Clifty Creek | Madison, IN | 5.1 TWh |
#18 | Cayuga | Cayuga, IN | 4.5 TWh |
#19 | Longview Power Plant | Maidsville, WV | 4.4 TWh |
#20 | Kyger Creek | Cheshire, OH | 4.7 TWh |
#21 | FirstEnergy Fort Martin Power Station | Maidsville, WV | 4.3 TWh |
#22 | Crystal River | Crystal River, FL | 16.3 TWh |
#24 | Marshall (NC) | Terrell, NC | 7.3 TWh |
#25 | Warrick | Newburgh, IN | 3.6 TWh |
#26 | Mt Storm | Mount Storm, WV | 3.6 TWh |
#27 | Hunter | Castle Dale, UT | 3.5 TWh |
#28 | James E. Rogers Energy Complex | Cliffside, NC | 5.6 TWh |
#29 | Merom | Sullivan, IN | 3.3 TWh |
#30 | Winyah | Georgetown, SC | 3.3 TWh |
#31 | Bonanza | Vernal, UT | 3.3 TWh |
#32 | Mitchell (WV) | Captina, WV | 3.3 TWh |
#33 | AES Petersburg | Petersburg, IN | 3.2 TWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Intermountain Power Project.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Clover Creek Solar Community Solar | Mona, UT | 199.6 GWh | 43.3 mi |
Currant Creek | Mona, UT | 2.8 TWh | 42.4 mi |
Enel Cove Fort | Cove Fort, UT | 155.0 GWh | 65.6 mi |
Gunnison Solar | Gunnison, UT | 3.9 GWh | 47.9 mi |
Hydro Plant No 3 | east of Ephraim, UT | 2.8 GWh | 69.8 mi |
Manti Lower | Manti, UT | 1.8 GWh | 54.1 mi |
Manti Upper | Manti, UT | 58.0 MWh | 54.1 mi |
Milford Wind Corridor Stage II LLC | Milford, UT | 158.5 GWh | 66.6 mi |
Nebo Power Station | Payson, UT | 825.0 GWh | 59.1 mi |
Pavant Solar II LLC | Fillmore, UT | 102.4 GWh | 27.1 mi |
Pavant Solar III | Filmore, UT | 40.8 GWh | 27.2 mi |
Pavant Solar, LLC | Fillmore, UT | 110.8 GWh | 39.7 mi |
Payson | Payson, UT | 5.0 MWh | 59 mi |
Sigurd Solar LLC | Sigurd, UT | 204.5 GWh | 55 mi |
Spanish Fork | Spanish Fork, UT | 11.5 GWh | 65.1 mi |
Spanish Fork Community Solar | Spanish Fork, UT | 7.2 GWh | 65.9 mi |
Spanish Fork Wind Park 2 LLC | Spanish Fork, UT | 42.0 GWh | 65.7 mi |
Tooele Army Depot(CSG) | Tooele, UT | 2.8 GWh | 69.5 mi |
Unit 4 | Mt Pleasent, UT | 3.2 GWh | 61.9 mi |
Whitehead | Springville, UT | 9.5 GWh | 68.9 mi |