Ingleside Cogeneration
St. Hwy 361, Houston, TX 77046Plant Summary Information
Ingleside Cogeneration is ranked #48 out of 304 natural gas power plants in Texas in terms of total annual net electricity generation.
Ingleside Cogeneration is comprised of 3 generators and generated 809.8 GWh during the 3-month period between May 2024 to August 2024.
Plant Name | Ingleside Cogeneration |
---|---|
Utility Name | Ingleside Cogeneration LP |
Location | San Patricio County, TX |
Initial Operation Date | July 1999 |
Last Update | Aug 2024 |
Annual Generation | 2.3 TWh |
Annual Consumption | 25.7 M MMBtu |
Ranked #483 out of 11,835 Power Plants Nationwide | |
Ranked #300 out of 2,253 Natural Gas Power Plants Nationwide | |
Ranked #64 out of 749 Texas Power Plants | |
Ranked #48 out of 304 Texas Natural Gas Power Plants | |
Fuel Types | Natural Gas : 98.5% Other Gas : 1.5% |
Map of Ingleside Cogeneration
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Ingleside Cogeneration.
Monthly Net Generation for Ingleside Cogeneration
Ingleside Cogeneration Details
Summary Information | |
---|---|
Plant Name | Ingleside Cogeneration (55313) |
Plant Address | St. Hwy 361, Houston, TX 77046 |
Utility | Ingleside Cogeneration LP (26469) |
Latitude, Longitude | 27.88278, -97.24278 |
Generation Dates on File | Jan 2001 to Aug 2024 |
Initial Operation Date | July 1999 |
Annual Generation | 2.3 TWh |
Fuel Types | Natural Gas : 98.5% Other Gas : 1.5% |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | Yes |
FERC Cogeneration Docket Number | 98-18-001 |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | Yes |
FERC Exempt Wholesale Generator Docket Number | 98-18-000 |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | TRE |
Balancing Authority | Electric Reliability Council of Texas, Inc. (ERCO) |
NAICS Code | Chemical Manufacturing (325) |
Sector | Industrial CHP (7) |
Water Source | San Patricio Municipal Water |
Ash Impoundment | |
Transmission / Distribution Owner | AEP Texas Central Company (3278) TX |
Grid Voltage | 138.00 kV |
Energy Storage | No |
Natural Gas Information | |
Pipeline Name |
KINDER MORGAN TEJAS PIPELINE LLC SOUTHCROSS ENERGY LLC HOUSTON PL CO LP |
Natural Gas Storage | No |
Generator CTG1 Details Operating July 1999
Technology | Natural Gas Fired Combined Cycle |
---|---|
Prime Mover | Combined Cycle Combustion Turbine Part |
Unit Code | CC1 |
Ownership | Jointly Owned |
Can Bypass Heat Recovery Steam Generator | No |
Nameplate Capacity | 170.1 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 155 MW |
Winter Capacity | 179 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | July 1999 |
---|---|
Combined Heat & Power | Yes |
Sector Name | Industrial CHP (7) |
Topping Or Bottoming | T |
Energy Source | Natural Gas |
Startup Source | Hydrogen |
Solid Fuel Gasification | No |
Time From Cold Shutdown To Full Load | 12H |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator CTG2 Details Operating July 1999
Technology | Natural Gas Fired Combined Cycle |
---|---|
Prime Mover | Combined Cycle Combustion Turbine Part |
Unit Code | CC1 |
Ownership | Jointly Owned |
Can Bypass Heat Recovery Steam Generator | No |
Nameplate Capacity | 170.1 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 155 MW |
Winter Capacity | 179 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | July 1999 |
---|---|
Combined Heat & Power | Yes |
Sector Name | Industrial CHP (7) |
Topping Or Bottoming | T |
Energy Source | Natural Gas |
Startup Source | Hydrogen |
Solid Fuel Gasification | No |
Time From Cold Shutdown To Full Load | 12H |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator STG Details Operating July 1999
Technology | Natural Gas Fired Combined Cycle |
---|---|
Prime Mover | Combined Cycle Steam Part |
Unit Code | CC1 |
Ownership | Jointly Owned |
Duct Burners | Yes |
Nameplate Capacity | 176.8 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 150 MW |
Winter Capacity | 150 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | July 1999 |
---|---|
Combined Heat & Power | Yes |
Sector Name | Industrial CHP (7) |
Topping Or Bottoming | T |
Energy Source | Natural Gas |
Startup Source | Hydrogen |
Solid Fuel Gasification | No |
Time From Cold Shutdown To Full Load | OVER |
Multiple Fuels | No |
Switch Between Oil And Natural Gas | No |
Ingleside Cogeneration Plant Owners
Owner Name | Address | Generator | Ownership |
---|---|---|---|
Ingleside Cogeneration LP | 5 Greenway Plaza Suite 110, Houston, TX 77046 | Generator CTG1 | 2.00% |
Oxy Cogener Holding Co Inc | 5 Greenway Plaza, Houston, TX 77046 | Generator CTG1 | 98.00% |
Ingleside Cogeneration LP | 5 Greenway Plaza Suite 110, Houston, TX 77046 | Generator CTG2 | 2.00% |
Oxy Cogener Holding Co Inc | 5 Greenway Plaza, Houston, TX 77046 | Generator CTG2 | 98.00% |
Ingleside Cogeneration LP | 5 Greenway Plaza Suite 110, Houston, TX 77046 | Generator STG | 2.00% |
Oxy Cogener Holding Co Inc | 5 Greenway Plaza, Houston, TX 77046 | Generator STG | 98.00% |
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Natural Gas.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#290 | Pleasants Energy LLC | St Mary's, WV | 2.3 TWh |
#291 | Tenaska Gateway Generating Station | Mt. Enterprise, TX | 2.3 TWh |
#292 | Dogwood Energy Facility | Pleasant Hill, MO | 2.3 TWh |
#293 | Chesterfield | Chester, VA | 2.3 TWh |
#294 | Elk Hills Power LLC | Tupman, CA | 2.3 TWh |
#295 | La Paloma Generating Plant | McKittrick, CA | 2.3 TWh |
#296 | Quail Run Energy Center | Odessa, TX | 2.3 TWh |
#297 | Rolling Hills Generating | Wilkesville, OH | 2.3 TWh |
#298 | Higgins Generating Station | Primm, NV | 2.3 TWh |
#299 | Lewis Creek | Willis, TX | 2.3 TWh |
#301 | W A Parish | Thompsons, TX | 11.6 TWh |
#302 | Yates | Newnan, GA | 2.2 TWh |
#303 | Front Range Power Plant | Fountain, CO | 2.2 TWh |
#304 | Muskogee | Fort Gibson, OK | 2.6 TWh |
#305 | Goldendale Generating Station | Goldendale, WA | 2.2 TWh |
#306 | ANP Blackstone Energy Project | Blackstone, MA | 2.2 TWh |
#307 | Gila River Power Block 4 | Gila Bend, AZ | 2.1 TWh |
#308 | Freeport Energy | Freeport, TX | 2.1 TWh |
#309 | Greater Des Moines | Pleasant Hill, IA | 2.1 TWh |
#310 | Mustang Station | Denver City, TX | 2.1 TWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Ingleside Cogeneration.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Barney M Davis | Corpus Christi, TX | 1.4 TWh | 19.6 mi |
Blackjack Creek Wind Farm | Skidmore, TX | 553.7 GWh | 28.2 mi |
Chapman Ranch Wind I | Corpus Christi, TX | 595.2 GWh | 25.5 mi |
Corpus Christi | Corpus Christi, TX | 72.9 GWh | 22.1 mi |
Corpus Christi Energy Center | Corpus Christi, TX | 2.5 TWh | 12.3 mi |
Corpus Refinery | Corpus Christi, TX | 272.8 GWh | 17.8 mi |
Cranell Wind Farm LLC | TBD, TX | 577.6 GWh | 25 mi |
El Algodon Alto Wind Farm, LLC | Mathis, TX | 610.5 GWh | 31.5 mi |
Gregory Power Plant | Gregory, TX | 833.6 GWh | 1.1 mi |
HEB00057 | Corpus Christi, TX | 315.0 MWh | 15.2 mi |
HEB00069 | Corpus Christi, TX | 407.0 MWh | 13 mi |
HEBCCBakery | Corpus Christi, TX | 1.0 GWh | 15 mi |
Karankawa Wind LLC | Mathis, TX | 789.9 GWh | 40.3 mi |
Midway Wind, LLC | Taft, TX | 407.6 GWh | 6.1 mi |
Nueces Bay | Corpus Christi, TX | 1.2 TWh | 11.6 mi |
Papalote Creek I LLC | Taft, TX | 421.0 GWh | 13.7 mi |
Papalote Creek II LLC | Taft, TX | 448.8 GWh | 8.5 mi |
Patriot Wind Farm | Bishop, TX | 549.2 GWh | 32 mi |
Ticona Polymers Inc | Bishop, TX | 254.1 GWh | 41.5 mi |
Valero Refinery Corpus Christi West | Corpus Christi, TX | 99.4 GWh | 15.3 mi |